Ft Leavenworth Concrete Civil Standard Details.pdf
PDF 6 MB Posted
- Attached to
- Amend #0002 Installation Concrete Requirement Federal contract opportunity
- Solicitation number
- W91QF424B0001
About this file
This federal solicitation seeks proposals for concrete and miscellaneous construction work at Fort Leavenworth, Kansas. Key requirements include replacing or installing new concrete items like pads, stairs, slabs, curb and gutter, sidewalks, ramps and retaining walls. Additional work comprises installing chain link fencing and metal handrails, replacing and installing concrete pavements, replacing storm sewer pipes and inlets, earthwork, excavation, grading, tree removal and erosion control. Ancillary tasks involve crack repair, pavement striping, sewer cleaning, coring and test pits. The work also includes repointing brick, replacing damaged brick to match, and raising manholes. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 02_W91QF4-24-B-0001 Concrete Requirement.pdf | ||
| BID_SHEET-CONCRETE-FINAL_20240325.xlsx | XLSX spreadsheet | |
| Amend 01_Q and A_W91QF424B0001 Concrete.pdf | ||
| SOW_Concrete 6 Mar 20240306.docx | DOCX document | |
| BID_SHEET-CONCRETE-FINAL_20240306.xlsx | XLSX spreadsheet | |
| WD-KS20240154_Highway_Heavy_dtd_20240105.pdf | ||
| BID_SHEET-CONCRETE-FINAL_20240207.xlsx | XLSX spreadsheet | |
| SOW_W91QF4-24-B-0001_20240215.pdf | ||
| Sol_W91QF4-24-B-0001 Installation Concrete.pdf | ||
| Specs_Concrete Requirement_FY 24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLCE101
P A
V E
M E
N T
M
A R
K I N
G S
US Army Corps of Engineers ®
SHEET ID
U S
R M
Y
C
O R
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
C
S O
L I C
I T
A T
I O
N
N
O
F I L
E
N
U M
B E
R
1 2 3 4 5
D
C
B
A
F O
L
E A
V E
N W
O R
T H
B U
I L
D I N
G
I
F R
A S
T R
U C
T U
R E
S O
U T
H S
I D
E
I N
F R
A S
T R
U C
T U
P
K A
N S
T
Y
D
I S
T R
I C
T
T
H
S
T R
E E
T
K A
N S
T
Y
M
I S
S O
U R
I
T R
E A
N O
R H
L
V
R
M O
L A
W R
E N
C E
K
A N
S A
S
A
B
U C
H W
I T
Z
A
B
U C
H W
I T
Z
M
M
U R
P H
Y
M A
R K
D E
S C
R I P
T I O
N D
A T
E
GOVERNMENT PROVIDED CONCEPTUAL BRIDGING DESIGN DRAWINGS DO NOT RELIEVE THE OFFER
OF THE REQUIREMENTS STATED IN THE RFP, INCLUDING BUT NOT LIMITED TO, LIFE SAFETY, BUILDING CODES, UNIFIED FACILITY CRITERIA (UFC) AND ALL OTHER APPLICABLE CRITERIA.
FINAL DESIGN DOCUMENTS
AutoCAD SHX Text NOTE: CROSSWALK PAVEMENT MARKINGS SHALL ONLY BE INSTALLED AT MID-BLOCK CROSSINGS (TYPE II). WHEN NOTED TO BE INSTALLED, CROSSWALK PAVEMENT MARKINGS SHALL BE INSTALLED AS FOLLOWS: TYPE I CROSSWALK SHALL BE INSTALLED AT MARKED CROSSWALK LOCATIONS CONTROLLED BY A TRAFFIC SIGNAL OR STOP SIGN. TYPE II CROSSWALKS SHALL BE INSTALLED AT MARKED CROSSWALK LOCATIONS THAT ARE NOT CONTROLLED BY A TRAFFIC SIGNAL OR STOP SIGN.
AutoCAD SHX Text TYPE I - CROSSWALK LINES SHALL BE 12" SOLID WHITE LINES. - CROSSWALK LINES SHALL BE 12" SOLID WHITE LINES. THEY SHALL BE SPACED A MINIMUM OF 6' APART FROM INSIDE EDGE TO INSIDE EDGE. WHEN REQUIRED, STOP LINES SHALL BE INSTALLED A MINIMUM OF 5' FROM CROSSWALKS. CROSSWALK LINE MEASUREMENTS ARE LINE EDGE TO LINE EDGE
AutoCAD SHX Text
12" WHITE
AutoCAD SHX Text
PAVEMENT MARKINGS TO STOP AT EDGE OF GUTTER
AutoCAD SHX Text
6' MIN.
AutoCAD SHX Text
6' MIN.
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
TYPE I
AutoCAD SHX Text
24" WHITE STOP BAR WHERE REQUIRED
AutoCAD SHX Text TYPE II - CROSSWALK LINES SHALL BE SOLID WHITE 18" WIDE PLACED - CROSSWALK LINES SHALL BE SOLID WHITE 18" WIDE PLACED PARALLEL TO THE DIRECTION OF TRAFFIC FLOW. THE LINE PLACEMENT IS DETERMINED BY LANE LINE, CENTER LINE, AND WHEEL PATH IN SUCH A MANNER AS TO MINIMIZE TRAFFIC WEAR. THE CROSSWALK WIDTH SHOULD BE NOT LESS THAN 8'. THE TRANSVERSE CROSSWALK LINES MAY BE ADDED. WHEN REQUIRED, STOP LINES SHALL BE INSTALLED A MINIMUM OF 5' FROM CROSSWALKS. CROSSWALK LINE MEASUREMENTS ARE LINE EDGE TO LINE EDGE
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
8' MIN.
AutoCAD SHX Text
8' MIN.
AutoCAD SHX Text
18" WIDE LINE WHITE
AutoCAD SHX Text
TYPE II
AutoCAD SHX Text
24" WHITE STOP BAR WHERE REQUIRED
AutoCAD SHX Text
TYPICAL CROSSWALK MARKINGS
AutoCAD SHX Text
LANE LINE MEASUREMENT DETAIL
AutoCAD SHX Text TYPICAL LANE WIDTH MEASUREMENTS ARE - CENTER OF SKIP LINE TO CENTER OF THE SOLID/SKIP LINES. TWO WAY CENTER TURN LANE LINES SHOULD BE CENTER OF SOLID/SKIP TO CENTER OF SOLID/SKIP LINES
AutoCAD SHX Text SHARROW - WHEN THERE IS NO PARKING, DISTANCE FROM FACE OF CURB TO CENTER OF SHARROW IS 5 FEET. WHEN PARKING IS PRESENT DISTANCE FROM FACE OF CURB TO CENTER OF SHARROW IS 11'.
AutoCAD SHX Text
TYPICAL PAVEMENT MARKING DETAIL
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text 11'
AutoCAD SHX Text
TOE OF CURB
AutoCAD SHX Text
MINOR CROSS STREET
AutoCAD SHX Text
PRIVATE DRIVE
AutoCAD SHX Text 18'
AutoCAD SHX Text 18'
AutoCAD SHX Text 6'
AutoCAD SHX Text 6'
AutoCAD SHX Text
4" YELLOW
AutoCAD SHX Text
MINOR STREET
AutoCAD SHX Text
4" YELLOW
AutoCAD SHX Text
4" WHITE
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
4" WHITE
AutoCAD SHX Text
MAJOR CROSS STREET
AutoCAD SHX Text
IF DOTTED LINE IS SHOWN IN INTERSECTION IT WILL BE 2' LINE 2' GAP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PAVEMENT MARKINGS
AutoCAD SHX Text A1
AutoCAD SHX Text GENERAL NOTES: EQUIPMENT - USE EQUIPMENT DESIGNED FOR THE PREPARATION OF THE - USE EQUIPMENT DESIGNED FOR THE PREPARATION OF THE APPROPRIATE TYPE OF PAVEMENT MARKING MATERIAL. SURFACE PREPARATION - ON EXISTING PAVEMENTS, REMOVE THE - ON EXISTING PAVEMENTS, REMOVE THE EXISTING PAVEMENT MARKINGS ACCORDING TO RECOMMENDATIONS OF THE MANUFACTURER OF THE NEW MARKINGS. ON AGED ASPHALT PAVEMENTS, THOROUGHLY REMOVE ALL DIRT, GRIT, GREASE, RESIDUE OF PRIOR PAVEMENT MARKINGS APPLICATION (INCLUDING ADHESIVES OR PRIMERS THAT MAY HAVE BEEN USED IN THEIR APPLICATION), AND ANY OTHER FOREIGN MATTER FROM THE ROADWAY SURFACE PRIOR TO THE APPLICATION OF THE NEW MARKINGS. ON NEW CONCRETE PAVEMENT AND NEW CONCRETE BRIDGE DECKS USE SHOT BLASTING TO REMOVE CURING COMPOUND AND LAITANCE FROM THE SURFACES TO WHICH THE PAVEMENT MARKINGS WILL BE APPLIED. ALIGNMENT - LAYOUT THE PAVEMENT MARKINGS AS DETAILED WITHIN THE - LAYOUT THE PAVEMENT MARKINGS AS DETAILED WITHIN THE PROJECT PLAN. IF THE PLANS DO NOT PROVIDE DETAILS, SUBMIT TO THE CONTRACTING OFFICER FOR APPROVAL. A LAYOUT PLAN FOR THE PAVEMENT MARKINGS SHALL COMPLY WITH THE LATEST EDITIONS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), THE DEPARTMENT OF DEFENSE SUPPLEMENT TO THE MUTCD, AND THE MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND TRANSPORTATION ENGINEERING AGENCY. PROVIDE ADEQUATE GUIDE MARKS - APPROXIMATELY 2" BY 12" AT APPROXIMATELY 30 TO 50 FOOT INTERVALS - FOR THE APPLICATION OF THE MARKINGS. APPLY MARKINGS STRAIGHT AND CLOSE TO THE INTENDED ALIGNMENT WITHOUT ABRUPT CHANGES THAT RESULT IN AN UNACCEPTABLE APPEARANCE. LINES THAT DEVIATE LATERALLY FROM THE INTENDED ALIGNMENT MORE THAN 2' IN 200' MAY BE REJECTED. APPLICATION - APPLY THE MARKINGS ACCORDING TO THE - APPLY THE MARKINGS ACCORDING TO THE RECOMMENDATIONS. FOLLOW THE MANUFACTURER'S RECOMMENDATIONS REGARDING PAVEMENT AND AMBIENT TEMPERATURES. THE CONTRACTING OFFICER WILL VERIFY THE PAVEMENT AND AMBIENT TEMPERATURES BEFORE BEGINNING WORK AND WHEN DEEMED NECESSARY. TAPES SHALL BE INLAID IN ASPHALT. OTHER PERMANENT MARKINGS SHALL BE INSTALLED IMMEDIATELY AFTER OVERLAYING. IF THE PAVEMENT MARKINGS CANNOT BE INSTALLED AND THUS THE ROADWAY WOULD BE UNMARKED OVERNIGHT, INTERIM REMOVABLE MARKINGS SHALL BE INSTALLED AND REMAIN UNTIL THE PERMANENT MARKINGS CAN BE INSTALLED. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO REMOVE THE INTERIM MARKINGS AND INSTALL THE PERMANENT MARKINGS WITHIN 48 HOURS. UNDER NO CIRCUMSTANCE SHALL THE INTERIM PAVEMENT MARKINGS BE IN PLACE FOR MORE THAN 14 DAYS. THE INTERIM REMOVABLE MARKINGS SHALL BE REMOVED PRIOR TO THE INSTALLATION OF THE PERMANENT PAVEMENT MARKINGS. REMOVE AND REPLACE NEWLY INSTALLED PAVEMENT MARKINGS THAT HAVE DRAG MARKS, GASHES, GOUGES, FOREIGN COVERING, DISCOLORED AREA OR AREAS THAT HAVE FAILED TO SOLIDIFY, HAVE IMPROPER ADHESION OR THICKNESS. ON NEW CONCRETE, LANES CANNOT BE OPEN UNTIL INTERIM OR PERMANENT MARKINGS ARE IN PLACE. INTERIM MARKINGS CANNOT BE LEFT IN PLACE MORE THAN 14 DAYS AND MUST BE REMOVED WHEN PERMANENT MARKINGS ARE INSTALLED.
AutoCAD SHX Text FILE NAME: C:\Users\1589890112.CIV\OneDrive - US Army\Documents\Matthew Fazio Installation Standards\Civil Standards\CAD\FLCE101.dwg LAST SAVED BY: Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/12/2023 9:05 AM C:\Users\1589890112.CIV\OneDrive - US Army\Documents\Matthew Fazio Installation Standards\Civil Standards\CAD\FLCE101.dwg LAST SAVED BY: Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/12/2023 9:05 AM LAST SAVED BY: Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/12/2023 9:05 AM Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/12/2023 9:05 AM SAVED DATE: 6/12/2023 9:05 AM 6/12/2023 9:05 AM PLOTTED: 6/12/2023 9:07 AM6/12/2023 9:07 AM
RIGHT LANE
MUST
TURN RIGHT
RIGHT LANE
MUST
TURN RIGHT
US Army Corps of Engineers ®
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
T h o m a s
A
D o w
Y e a g e r
Q
C
O P
T I O
N A
L
F
I E
D
T
P
T I O
N A
L
F
I E
T
O
A V
E N
W O
R T
H
K
A N
S A
S
Y A
E G
C
H I T
E C
T U
R E
W
T
H
S
T R
E E
T
O V
E R
L A
R
K
K
S
D I R
E C
T O
R A
P
U B
L
W
R
K S
F O
A V
E N
W O
R T
H
S
T A
N D
A R
D
D
E T
A I L S
D I R
E C
T O
R A
P
U B
L
R
K S
M c C l e l l a n
A v e
B l d g
F o r t
L e a v e n w o r t h
K
S
T r e a n o r H
L
C a d
T e c h n i c i a n
PREDESIGN SUBMITTAL
P C
I V
I L H
P
F
T L
F
Y
I N
F R
A S
T R
U C
T U
R E
D
R A
W I N
G A
U T
O C
A D
F
L K
S S
T A
N D
A R
D
D
R A
W I N
G S
S
H E
E T
S F
L C
E D
W G
FLCE102
P A
V E
M E
R
K I N
G S
AutoCAD SHX Text
- DELINEATORS, IF LOW SPEED CURB DEFINES EDGE NOT NEEDED
AutoCAD SHX Text
LANE REDUCTION TRANSITION MARKING
AutoCAD SHX Text
LANE DROP - WHEN THRU LANE BECOMES MANDATORY TURN LANE
AutoCAD SHX Text
STOP 4" LANE LINE
AutoCAD SHX Text
NORMAL 4" WHITE LANE LINES 10' LINE 30' GAP
AutoCAD SHX Text
4" DOTTED WHITE LANE LINE 6' LINE - 18' GAP
AutoCAD SHX Text
8' WHITE ARROW
AutoCAD SHX Text
4" SOLID WHITE
AutoCAD SHX Text L = WS²/60 FOR 30mph, L=165 35mph, L=225 40mph, L=293 d = 460' FOR 30mph = 565' FOR 35mph = 670' FOR 40mph d/4 = 115' FOR 30mph = 141' FOR 35mph = 168' FOR 40mph
AutoCAD SHX Text W4-2
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PAVEMENT MARKINGS
AutoCAD SHX Text A1
AutoCAD SHX Text R3-7
AutoCAD SHX Text R3-7
GENERAL NOTES: EQUIPMENT - USE EQUIPMENT DESIGNED FOR THE PREPARATION OF THE - USE EQUIPMENT DESIGNED FOR THE PREPARATION OF THE APPROPRIATE TYPE OF PAVEMENT MARKING MATERIAL. SURFACE PREPARATION - ON EXISTING PAVEMENTS, REMOVE THE - ON EXISTING PAVEMENTS, REMOVE THE EXISTING PAVEMENT MARKINGS ACCORDING TO RECOMMENDATIONS OF THE MANUFACTURER OF THE NEW MARKINGS. ON AGED ASPHALT PAVEMENTS, THOROUGHLY REMOVE ALL DIRT, GRIT, GREASE, RESIDUE OF PRIOR PAVEMENT MARKINGS APPLICATION (INCLUDING ADHESIVES OR PRIMERS THAT MAY HAVE BEEN USED IN THEIR APPLICATION), AND ANY OTHER FOREIGN MATTER FROM THE ROADWAY SURFACE PRIOR TO THE APPLICATION OF THE NEW MARKINGS. ON NEW CONCRETE PAVEMENT AND NEW CONCRETE BRIDGE DECKS USE SHOT BLASTING TO REMOVE CURING COMPOUND AND LAITANCE FROM THE SURFACES TO WHICH THE PAVEMENT MARKINGS WILL BE APPLIED. ALIGNMENT - LAYOUT THE PAVEMENT MARKINGS AS DETAILED WITHIN THE - LAYOUT THE PAVEMENT MARKINGS AS DETAILED WITHIN THE PROJECT PLAN. IF THE PLANS DO NOT PROVIDE DETAILS, SUBMIT TO THE CONTRACTING OFFICER FOR APPROVAL. A LAYOUT PLAN FOR THE PAVEMENT MARKINGS SHALL COMPLY WITH THE LATEST EDITIONS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), THE DEPARTMENT OF DEFENSE SUPPLEMENT TO THE MUTCD, AND THE MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND TRANSPORTATION ENGINEERING AGENCY. PROVIDE ADEQUATE GUIDE MARKS - APPROXIMATELY 2" BY 12" AT APPROXIMATELY 30 TO 50 FOOT INTERVALS - FOR THE APPLICATION OF THE MARKINGS. APPLY MARKINGS STRAIGHT AND CLOSE TO THE INTENDED ALIGNMENT WITHOUT ABRUPT CHANGES THAT RESULT IN AN UNACCEPTABLE APPEARANCE. LINES THAT DEVIATE LATERALLY FROM THE INTENDED ALIGNMENT MORE THAN 2' IN 200' MAY BE REJECTED. APPLICATION - APPLY THE MARKINGS ACCORDING TO THE - APPLY THE MARKINGS ACCORDING TO THE RECOMMENDATIONS. FOLLOW THE MANUFACTURER'S RECOMMENDATIONS REGARDING PAVEMENT AND AMBIENT TEMPERATURES. THE CONTRACTING OFFICER WILL VERIFY THE PAVEMENT AND AMBIENT TEMPERATURES BEFORE BEGINNING WORK AND WHEN DEEMED NECESSARY. TAPES SHALL BE INLAID IN ASPHALT. OTHER PERMANENT MARKINGS SHALL BE INSTALLED IMMEDIATELY AFTER OVERLAYING. IF THE PAVEMENT MARKINGS CANNOT BE INSTALLED AND THUS THE ROADWAY WOULD BE UNMARKED OVERNIGHT, INTERIM REMOVABLE MARKINGS SHALL BE INSTALLED AND REMAIN UNTIL THE PERMANENT MARKINGS CAN BE INSTALLED. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO REMOVE THE INTERIM MARKINGS AND INSTALL THE PERMANENT MARKINGS WITHIN 48 HOURS. UNDER NO CIRCUMSTANCE SHALL THE INTERIM PAVEMENT MARKINGS BE IN PLACE FOR MORE THAN 14 DAYS. THE INTERIM REMOVABLE MARKINGS SHALL BE REMOVED PRIOR TO THE INSTALLATION OF THE PERMANENT PAVEMENT MARKINGS. REMOVE AND REPLACE NEWLY INSTALLED PAVEMENT MARKINGS THAT HAVE DRAG MARKS, GASHES, GOUGES, FOREIGN COVERING, DISCOLORED AREA OR AREAS THAT HAVE FAILED TO SOLIDIFY, HAVE IMPROPER ADHESION OR THICKNESS. ON NEW CONCRETE, LANES CANNOT BE OPEN UNTIL INTERIM OR PERMANENT MARKINGS ARE IN PLACE. INTERIM MARKINGS CANNOT BE LEFT IN PLACE MORE THAN 14 DAYS AND MUST BE REMOVED WHEN PERMANENT MARKINGS ARE INSTALLED.
R B
FLCE201
A
FINAL DESIGN DOCUMENTS
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
T h o m a s
A
D o w
Y e a g e r
Q
C
O P
T I O
N A
L
F
I E
T
P
T I O
N A
L
F
I E
T
O
A
V E
N W
O R
T H
K
A N
S A
S
Y A
E G
C
H I T
E C
T U
R E
H
R
E E
T
O V
E R
L A
R
K
K
S
D I R
E C
T O
R A
P
U B
L
R
K S
F O
A
V E
N W
O R
A
N D
A R
D
D
E T
A I L
S
D I R
E C
T O
R A
P
U B
L
R
K S
M c C l e l l a n
A v e
B l d g
F o r t
L e a v e n w o r t h
K
S
US Army Corps of Engineers ®
C B a r n e s
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
CURB & GUTTER
AutoCAD SHX Text
2" ASPHALTIC CONCRETE SURFACE COURSE
AutoCAD SHX Text
CONCRETE FILL (DEPTH VARIES, 6" MINIMUM)
AutoCAD SHX Text
SAW CUT TO ROCK BASE OR SUBGRADE
AutoCAD SHX Text
EXISTING ASPHALTIC CONCRETE
AutoCAD SHX Text
RE-COMPACT TOP 6" OF SUBGRADE
AutoCAD SHX Text
COMPACTED AGGREGATE LEVELING COURSE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CURB REPLACEMENT
AutoCAD SHX Text E1
AutoCAD SHX Text GENERAL NOTES (ALL DETAILS THIS SHEET): 1. " ISOLATION JOINTS WITH " DIA. X 2' SMOOTH DOWELS SHALL BE PLACED AT RADIUS POINTS 34" ISOLATION JOINTS WITH " DIA. X 2' SMOOTH DOWELS SHALL BE PLACED AT RADIUS POINTS 58" DIA. X 2' SMOOTH DOWELS SHALL BE PLACED AT RADIUS POINTS AND AT 150' INTERVALS. THESE DOWEL BARS SHALL BE GREASED AND WRAPPED ON ONE END WITH EXPANSION TUBES. 2. 1" DEEP CONTRACTION JOINTS SHALL BE INSTALLED AT APPROXIMATELY 10' INTERVALS. THESE 1" DEEP CONTRACTION JOINTS SHALL BE INSTALLED AT APPROXIMATELY 10' INTERVALS. THESE JOINTS SHALL PASS ACROSS THE ENTIRE CURB SECTION. 3. FIX DOWEL BARS WITH BAR SUPPORTS. FIX DOWEL BARS WITH BAR SUPPORTS. 4. DEPTH OF CURB SHALL BE A MINIMUM OF 8" THROUGH THE HANDICAP ACCESS RAMP. DEPTH OF CURB SHALL BE A MINIMUM OF 8" THROUGH THE HANDICAP ACCESS RAMP. 5. CONCRETE SHALL CONFORM TO PROJECT SPECIFICATIONS. CONCRETE SHALL CONFORM TO PROJECT SPECIFICATIONS. 6. SUBGRADE COMPACTION, SHALL EXTEND UNDER ADJACENT CURB SECTIONS AND TWO FEET (2.0') SUBGRADE COMPACTION, SHALL EXTEND UNDER ADJACENT CURB SECTIONS AND TWO FEET (2.0') BEYOND THE BACK OF CURB.
AutoCAD SHX Text
TOP OF SURFACE COURSE
AutoCAD SHX Text
TOP OF BASE COURSE
AutoCAD SHX Text #4 x 1'-0"@ 5' CTS.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
DOWELED CURB - TYPE DC
AutoCAD SHX Text E4
AutoCAD SHX Text
5/8" PER FT.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ROLL BACK CURB & GUTTER (TYPE CG-2)
AutoCAD SHX Text E8
AutoCAD SHX Text
5/8" PER FT.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ROLL BACK DRY CURB & GUTTER (TYPE CG-2 DRY)
AutoCAD SHX Text D1
AutoCAD SHX Text
PAVEMENT SURFACE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
STRAIGHT CURB - TYPE C-1
AutoCAD SHX Text A1
AutoCAD SHX Text 1 "R.12"R.
AutoCAD SHX Text
5/8" PER FT.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
STRAIGHT BACK DRY CURB & GUTTER (TYPE CG-1 DRY)
AutoCAD SHX Text A4
AutoCAD SHX Text 1-1/2" R.
AutoCAD SHX Text 1-1/2" R.
AutoCAD SHX Text
5/8" PER FT.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
STRAIGHT BACK CURB & GUTTER - TYPE CG-1
AutoCAD SHX Text D4
AutoCAD SHX Text 1 "R.12"R.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
VALLEY GUTTER
AutoCAD SHX Text D8
AutoCAD SHX Text
FRONT OF GUTTER
AutoCAD SHX Text
8% SLOPE
AutoCAD SHX Text 2%*
AutoCAD SHX Text
EXISTING PAVEMENT
AutoCAD SHX Text 0.50
AutoCAD SHX Text 0.50
AutoCAD SHX Text ** AT CONTRACTOR'S OPTION, THE AT CONTRACTOR'S OPTION, THE GUTTER THICKNESS MAY BE INCREASED AT EDGE OF PAVEMENT TO MAKE BOTTOM OF GUTTER PARALLEL WITH PAVING OF BASE COURSE, BUT THE GUTTER THICKNESS MUST NOT BE LESS THAN THE SPECIFIED 6" OR 8" AT ANY POINT.
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED ASPHALT PAVEMENT
FILE NAME: P:\_Civil\HP16.021.03 FTL FY18 Infrastructure\06_Drawing\04_AutoCAD\FLKS_Standard Drawings\SHEETS\FLCE201.dwg LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:16 AM PLOTTED: 2/26/2020 12:29 PMP:\_Civil\HP16.021.03 FTL FY18 Infrastructure\06_Drawing\04_AutoCAD\FLKS_Standard Drawings\SHEETS\FLCE201.dwg LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:16 AM PLOTTED: 2/26/2020 12:29 PM LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:16 AM PLOTTED: 2/26/2020 12:29 PMCandace Barnes SAVED DATE: 2/26/2020 12:16 AM PLOTTED: 2/26/2020 12:29 PM SAVED DATE: 2/26/2020 12:16 AM PLOTTED: 2/26/2020 12:29 PM2/26/2020 12:16 AM PLOTTED: 2/26/2020 12:29 PM PLOTTED: 2/26/2020 12:29 PM2/26/2020 12:29 PM
V E
M E
C
T I O
N S
FLCE202
A
FINAL DESIGN DOCUMENTS
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
T h o m a s
A
D o w
Y e a g e r
Q
C
O P
T I O
N A
L
F
I E
T
P
T I O
N A
L
F
I E
T
O
A V
E N
W O
R T
H
K
A N
S A
S
Y A
E G
C
H I T
E C
T U
R E
W
T
H
S
T R
E E
T
O V
E R
L A
R
K
K
S
D I R
E C
T O
R A
P
U B
L
R
K S
F O
A V
E N
W O
R T
H
S
T A
N D
A R
D
D
E T
A I L S
D I R
E C
T O
R A
P
U B
L
R
K S
M c C l e l l a n
A v e
B l d g
F o r t
L e a v e n w o r t h
K
S
US Army Corps of Engineers ®
C B a r n e s
AutoCAD SHX Text
ASPHALTIC CONCRETE OR CONCRETE STREET
AutoCAD SHX Text
TYPE CG-3 CONCRETE CURB AND GUTTER
AutoCAD SHX Text NOTE: ON DOWN ENTRANCE GRADES, THE DRIVEWAY APRON SHALL ATTAIN AN ELEVATION 8" HIGHER THAN THE FLOWLINE OF THE CURB AND GUTTER BEFORE SLOPING DOWNWARD.
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
2% MAX. CROSS SLOPE IN PEDESTRIAN WAY
AutoCAD SHX Text CONCRETE APRON TO BE CONSTRUCTED TO END OF RADIUS OF DRIVE OR TO BACK OF SIDEWALK, WHICHEVER
AutoCAD SHX Text CONCRETE APRON TO BE CONSTRUCTED TO END OF RADIUS OF DRIVE OR TO BACK OF SIDEWALK, WHICHEVER
AutoCAD SHX Text
FLOWLINE ELEVATION
AutoCAD SHX Text
12" ISOLATION JOINT (MINIMUM)
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
SAWED FULL DEPTH BEFORE REMOVAL OF CURB & GUTTER
AutoCAD SHX Text
FIBER REINFORCED CONCRETE OR #4 BARS @ 18" CENTERS (MAXIMUM)
AutoCAD SHX Text
CLEAN, LEVEL AND COMPACTED SUBGRADE
AutoCAD SHX Text
USE SUFFICIENT CHAIRS TO SUPPORT BARS
AutoCAD SHX Text
OVER-EXCAVATE TO A DEPTH OF 6" AND BACKFILL W/ APPROVED MATERIAL
AutoCAD SHX Text
FLOWLINE ELEVATION + 8" (MINIMUM)
AutoCAD SHX Text
MATCH EXISTING CURB & GUTTER
AutoCAD SHX Text
LAY-DOWN CURB
AutoCAD SHX Text
SAWED JOINTS
AutoCAD SHX Text 1'
AutoCAD SHX Text 1'
AutoCAD SHX Text
MATCH EXISTING CURB & GUTTER
AutoCAD SHX Text CONSTRUCT TYPE 1 SIDEWALK RAMPS WHERE SIDEWALK INTERSECTS COMMERCIAL DRIVE ENTRANCE
AutoCAD SHX Text
RIGHT-OF-WAY LINE
AutoCAD SHX Text
12" ISOLATION JOINT
AutoCAD SHX Text
STRAIGHT-BACK CURB (TYPICAL)
AutoCAD SHX Text
FIBER REINFORCED CONCRETE OR #4 BARS @ 18" CENTERS (MAXIMUM) (#4 BARS SHOWN)
AutoCAD SHX Text CONCRETE APRON SHALL EXTEND TO END OF RADIUS OR TO BACK OF SIDEWALK, WHICHEVER IS FARTHEST FROM THE BACK OF STREET CURB
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
JOINT SPACING: EXPANSION - 30' MAX. CONTROL - 10' MAX.
AutoCAD SHX Text TOOL JOINT DEPTH OF 13 DEPTH OF CONCRETE x " WIDE WITHIN 24 14" WIDE WITHIN 24 HOURS OF POUR. SEAL.
AutoCAD SHX Text
PROVIDE SEALANT TO APPROX. 3/8" BELOW SURFACE.
AutoCAD SHX Text
1/2" EXPANSION JOINT FILLER
AutoCAD SHX Text 8" CONCRETE PAVEMENT WITH #4 REBAR @ 18" O.C. EW OR EQUIVALENT WELDED WIRE FABRIC (WWF)
AutoCAD SHX Text
4" MIN. COMPACTED CLEAN, CRUSHED ROCK LEVELING COURSE
AutoCAD SHX Text
12" MIN. COMPACTED SUBGRADE TO A MIN. 95% OF STD. PROCTOR MAX. DENSITY
AutoCAD SHX Text
VARIES-SEE PLAN
AutoCAD SHX Text
VARIES-SEE NOTE
AutoCAD SHX Text NOTE: 1. CROSS SLOPE SHALL NOT EXCEED 2% ALONG ALL ADA ROUTES. CROSS SLOPE SHALL NOT EXCEED 2% ALONG ALL ADA ROUTES. 2. SUBGRADE PREPARATION AND STABILIZATION SHALL BE PER THE SUBGRADE PREPARATION AND STABILIZATION SHALL BE PER THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT
AutoCAD SHX Text
CURB &
AutoCAD SHX Text
CURB &
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
COMPACTED SUBGRADE
AutoCAD SHX Text
SURFACE ASPHALT COURSE
AutoCAD SHX Text
BASE ASPHALT COURSE
AutoCAD SHX Text
STONE BASE
AutoCAD SHX Text 2"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
PAVING AREA
AutoCAD SHX Text
HEAVY DUTY
AutoCAD SHX Text
STANDARD DUTY
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 9"
AutoCAD SHX Text 8"
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A1
AutoCAD SHX Text
CONCRETE DRIVEWAY APPROACH
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A7
AutoCAD SHX Text
ASPHALT PAVEMENT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text E7
AutoCAD SHX Text
8" CONCRETE PAVEMENT
AutoCAD SHX Text
10' MINIMUM PREFERRED SPACING BEFORE PARALLEL PARKING STALLS BEGIN
AutoCAD SHX Text
NOTE: UNLESS APPROVED BY CONTRACTING OFFICER ALL JOINTS ARE TO BE TOOLED
FILE NAME: C:\Users\1589890112.CIV\OneDrive - US Army\Documents\Matthew Fazio Installation Standards\Civil Standards\CAD\FLCE202.dwg LAST SAVED BY: Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/9/2023 12:16 PM C:\Users\1589890112.CIV\OneDrive - US Army\Documents\Matthew Fazio Installation Standards\Civil Standards\CAD\FLCE202.dwg LAST SAVED BY: Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/9/2023 12:16 PM LAST SAVED BY: Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/9/2023 12:16 PM Fazio, Matthew P CIV USARMY ID-TRAINING (USA) SAVED DATE: 6/9/2023 12:16 PM SAVED DATE: 6/9/2023 12:16 PM 6/9/2023 12:16 PM PLOTTED: 6/9/2023 12:16 PM6/9/2023 12:16 PM
G
A R
D R
A I L
FLCE203
A
FINAL DESIGN DOCUMENTS
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
T h o m a s
A
D o w
Y e a g e r
Q
C
O P
T I O
N A
L
F
I E
T
P
T I O
N A
L
F
I E
T
O
A
V E
N W
O R
T H
K
A N
S A
S
Y A
E G
C
H I T
E C
T U
R E
R
E E
T
O V
E R
L A
R
K
K
S
D I R
E C
T O
R A
P
U B
L
R
K S
F O
A
V E
N W
O R
A
N D
A R
D
D
E T
A I L
S
D I R
E C
T O
R A
P
U B
L
R
K S
M c C l e l l a n
A v e
B l d g
F o r t
L e a v e n w o r t h
K
S
US Army Corps of Engineers ®
C B a r n e s
AutoCAD SHX Text
TYPICAL ELEVATIONS
AutoCAD SHX Text
DETAILS OF POST ATTACHMENT
AutoCAD SHX Text ALTERNATE POST ATTACHMENT (This attachment to be used only when bolting through the top slab is not practical.)
AutoCAD SHX Text
TYPICAL W-BEAM RAIL
AutoCAD SHX Text 38"
AutoCAD SHX Text 1 "1732"
AutoCAD SHX Text 116"Tolerance
AutoCAD SHX Text 1516"R
AutoCAD SHX Text 1516"R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Slope var.
AutoCAD SHX Text EMBED ANCHOR ROD A MIN. OF 6" OR AS RECOMMENDED BY THE MANUFACTURER OF THE RESIN BONDING AGENT TO OBTAIN A SAFE WORKING TENSILE LOAD OF 8,000 LBS.
AutoCAD SHX Text 6'-3" post spacing for Alt. #1 3'-1 1/2" post spacing for Alt. #2
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ALIGNMENT (PARALLEL) & DETAILS FOR GUARDRAIL PROTECTION ON LOW FILL CULVERTS
AutoCAD SHX Text A1
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text Radius = 625.08'
AutoCAD SHX Text Normal project side slope. See typical sections.
AutoCAD SHX Text
DETAIL OF BASE PLATE
AutoCAD SHX Text
DETAIL OF STEEL PLATE
AutoCAD SHX Text
PLATE DETAILS FOR ATTACHMENT ASSEMBLY
AutoCAD SHX Text 1"x1 " 12" SLOTTED HOLES
AutoCAD SHX Text PL "x10"x6"58"x10"x6"
AutoCAD SHX Text PL "x8"x6"14"x8"x6"
AutoCAD SHX Text
4'-0" FROM FACE OF GUARDRAIL
AutoCAD SHX Text
(SKT OR APPROVED EQUIVALENT) END TERMINAL
AutoCAD SHX Text
LINE OF NORMAL SLOPE CHANGE
AutoCAD SHX Text
3:1 OR
AutoCAD SHX Text
3:1 OR
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text of R.C.B.
AutoCAD SHX Text W6x8.5 or W6X9 POSTS AT 6'-3" SPACING
AutoCAD SHX Text 6"x8"x14"TREATED WOOD OR POLYMER BLOCK
AutoCAD SHX Text
34" Ô X (TS + 2") A307 BOLTS WITH WASHERS
AutoCAD SHX Text PL "x8"x6" 14"x8"x6" SEE DETAIL
AutoCAD SHX Text
REINFORCED CONCRETE CULVERT SLAB
AutoCAD SHX Text
SIDE VIEW (ALT. #1)
AutoCAD SHX Text
SIDE VIEW (ALT. #2)
AutoCAD SHX Text
FRONT VIEW
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
SINGLE W-BEAM GUARDRAIL SECTION
AutoCAD SHX Text
BOLTS "A"
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text
END
AutoCAD SHX Text
END
AutoCAD SHX Text 4:1
AutoCAD SHX Text 4:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text
NORMAL SHOULDER LINE
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
TYPICAL ALIGNMENT
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text GENERAL NOTES 1. GUARDRAIL POSTS ATTACHED TO THE TOP OF A CONCRETE GUARDRAIL POSTS ATTACHED TO THE TOP OF A CONCRETE CULVERT ARE STEEL POSTS ONLY. USE WOOD OR STEEL POSTS POSTS ONLY. USE WOOD OR STEEL POSTS POSTS ONLY. USE WOOD OR STEEL POSTS FOR THE REMAINING POSTS EXCEPT WHERE A SPECIFIC MATERIAL WHERE A SPECIFIC MATERIAL WHERE A SPECIFIC MATERIAL IS REQUIRED FOR FEATURES SHOWN ON OTHER STANDARD STANDARD STANDARD DRAWINGS SUCH AS END TERMINALS OR GUARDRAIL AT INTERSECTING ROADWAYS. ROADWAYS. ROADWAYS. 2. DRILL OR FORM HOLES IN CULVERT TOP SLAB. DRILL OR FORM HOLES IN CULVERT TOP SLAB. . 3. WHEN HOLES ARE DRILLED BE CAREFUL TO AVOID EXCESS WHEN HOLES ARE DRILLED BE CAREFUL TO AVOID EXCESS BREAKAGE OF THE CONCRETE AROUND THE HOLE. 4. USE STANDARD W-BEAM GUARDRAIL THROUGHOUT. USE STANDARD W-BEAM GUARDRAIL THROUGHOUT. 5. GUARDRAIL CONTRACTOR WILL FURNISH AND INSTALL THE GUARDRAIL CONTRACTOR WILL FURNISH AND INSTALL THE ATTACHMENT ASSEMBLY TO THE CULVERT. TO THE CULVERT. TO THE CULVERT. 6. FABRICATE POSTS AND STEEL PLATES FROM STEEL MEETING THE FABRICATE POSTS AND STEEL PLATES FROM STEEL MEETING THE REQUIREMENTS OF THE KSDOT SPECIFICATIONS. OF THE KSDOT SPECIFICATIONS. OF THE KSDOT SPECIFICATIONS. KSDOT SPECIFICATIONS. SPECIFICATIONS. 7. GALVANIZE ALL STEEL PARTS AFTER FABRICATION. GALVANIZE ALL STEEL PARTS AFTER FABRICATION. . 8. ALL REFERENCES TO CULVERTS ON THIS SHEET REFER TO ALL REFERENCES TO CULVERTS ON THIS SHEET REFER TO REINFORCED CONCRETE BOXES. BOXES. BOXES. 9. LOCATE GUARDRAIL POST TO CONCRETE CULVERT CONNECTIONS LOCATE GUARDRAIL POST TO CONCRETE CULVERT CONNECTIONS SYMMETRICAL ABOUT CENTER LINE OF THE CULVERT. CENTER LINE OF THE CULVERT.CENTER LINE OF THE CULVERT.
AutoCAD SHX Text
1516" HOLES
AutoCAD SHX Text 34" A36 THREADED ROD TO BE GROUTED WITH AN APPROVED EPOXY OR POLYESTER RESIN IN ACCORDANCE WITH STANDARD SPECIFICATIONS.
AutoCAD SHX Text 38"R
AutoCAD SHX Text
REINFORCED CONCRETE CULVERT SLAB
AutoCAD SHX Text
TWO W-BEAM GUARDRAIL SECTS. (NESTED)
AutoCAD SHX Text 0" to
AutoCAD SHX Text 0" to
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text PL "x10"x6" 58"x10"x6" SEE DETAIL
AutoCAD SHX Text 34" x (Ts + 2") A307BOLTS WITH WASHERS
AutoCAD SHX Text PL "x8"x6" 14"x8"x6" SEE DETAIL
AutoCAD SHX Text
W6X8.5 OR W6X9 POSTS AT 3'-11 #2" SPACING
AutoCAD SHX Text 1'-5 "34"
AutoCAD SHX Text 1'-5 "34"
AutoCAD SHX Text 6"x8"x14" Treated wood or polymer block
AutoCAD SHX Text
LINE OF NORMAL SLOPE CHANGE
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text 4:1 or
AutoCAD SHX Text 4:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text
OF R.C.B.
AutoCAD SHX Text of R.C.B.
AutoCAD SHX Text
CONTRACTOR TO FIELD
AutoCAD SHX Text
CONTRACTOR TO FIELD
AutoCAD SHX Text PL "x10"x6" 58"x10"x6" SEE DETAIL
AutoCAD SHX Text of R.C.B.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ALIGNMENT (FLARED) & DETAILS FOR GUARDRAIL PROTECTION ON LOW FILL CULVERTS
AutoCAD SHX Text A6
AutoCAD SHX Text
TYPICAL ELEVATIONS
AutoCAD SHX Text
DETAILS OF POST ATTACHMENT
AutoCAD SHX Text
ALTERNATE POST ATTACHMENT
AutoCAD SHX Text
TYPICAL W-BEAM RAIL
AutoCAD SHX Text 38"
AutoCAD SHX Text of R.C.B.
AutoCAD SHX Text 1 "1732"
AutoCAD SHX Text 116"Tolerance
AutoCAD SHX Text 15/16" R
AutoCAD SHX Text 15/16" R
AutoCAD SHX Text a
AutoCAD SHX Text b
AutoCAD SHX Text
4'-0" FROM FACE OF GUARDRAIL
AutoCAD SHX Text Slope var.
AutoCAD SHX Text (This attachment to be used only when bolting through the top slab is not practical.)
AutoCAD SHX Text EMBED ANCHOR ROD A MIN. OF 6" OR AS RECOMMENDED BY THE MANUFACTURER OF THE RESIN BONDING AGENT TO OBTAIN A SAFE WORKING TENSILE LOAD OF 8,000 LBS.
AutoCAD SHX Text
6'-3" POST SPACING FOR ALT. #1 3'-1 1/2" POST SPACING FOR ALT. #2
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
DETAIL OF BASE PLATE
AutoCAD SHX Text
DETAIL OF STEEL PLATE
AutoCAD SHX Text
PLATE DETAILS FOR ATTACHMENT ASSEMBLY
AutoCAD SHX Text 1"x1 " 12" SLOTTED HOLES
AutoCAD SHX Text PL "x10"x6"58"x10"x6"
AutoCAD SHX Text PL "x8"x6"14"x8"x6"
AutoCAD SHX Text
4'-0" FROM FACE OF GUARDRAIL
AutoCAD SHX Text
(FLEAT OR SRT) END TERMINAL
AutoCAD SHX Text
LINE OF NORMAL SLOPE CHANGE
AutoCAD SHX Text
3:1 OR
AutoCAD SHX Text
3:1 OR
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
SIDE VIEW (ALT. #2)
AutoCAD SHX Text
FRONT VIEW
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
END
AutoCAD SHX Text
END
AutoCAD SHX Text 4:1
AutoCAD SHX Text 4:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text
NORMAL SHOULDER LINE
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
TYPICAL ALIGNMENT
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text GENERAL NOTES 1. GUARDRAIL POSTS ATTACHED TO THE TOP OF GUARDRAIL POSTS ATTACHED TO THE TOP OF A CONCRETE CULVERT ARE STEEL POSTS ONLY. USE WOOD OR STEEL POSTS FOR THE REMAINING POSTS EXCEPT WHERE A SPECIFIC MATERIAL IS REQUIRED FOR FEATURES SHOWN ON OTHER STANDARD DRAWINGS SUCH AS END TERMINALS OR GUARDRAIL AT INTERSECTING ROADWAYS. 2. DRILL OR FORM HOLES IN CULVERT TOP SLAB DRILL OR FORM HOLES IN CULVERT TOP SLAB AS APPROVED BY THE CONTRACTING OFFICER. 3. WHEN HOLES ARE DRILLED BE CAREFUL TO WHEN HOLES ARE DRILLED BE CAREFUL TO AVOID EXCESS BREAKAGE OF THE CONCRETE AROUND THE HOLE. 4. USE STANDARD W-BEAM GUARDRAIL USE STANDARD W-BEAM GUARDRAIL THROUGHOUT. 5. CONTRACTOR WILL FURNISH AND INSTALL THE CONTRACTOR WILL FURNISH AND INSTALL THE ATTACHMENT ASSEMBLY TO THE CULVERT. 6. FABRICATE POSTS AND STEEL PLATES FROM FABRICATE POSTS AND STEEL PLATES FROM STEEL MEETING THE REQUIREMENTS OF THE KSDOT SPECIFICATIONS. 7. GALVANIZE ALL STEEL PARTS AFTER GALVANIZE ALL STEEL PARTS AFTER FABRICATION, SEE KSDOT SPECIFICATIONS. 8. ALL REFERENCES TO CULVERTS ON THIS SHEET ALL REFERENCES TO CULVERTS ON THIS SHEET REFER TO REINFORCED CONCRETE BOXES. 9. WELD GUARDRAIL POST CONNECTION TO BASE WELD GUARDRAIL POST CONNECTION TO BASE PLATE, SEE KSDOT SPECIFICATIONS. 10. LOCATE GUARDRAIL POST TO CONCRETE LOCATE GUARDRAIL POST TO CONCRETE CULVERT CONNECTIONS SYMMETRICAL ABOUT CENTER LINE OF THE CULVERT.
AutoCAD SHX Text
1516" HOLES
AutoCAD SHX Text 34" A36 THREADED ROD TO BE GROUTED WITH AN APPROVED EPOXY OR POLYESTER RESIN IN ACCORDANCE WITH KSDOT SPECIFICATIONS.
AutoCAD SHX Text 38"R
AutoCAD SHX Text
REINFORCED CONCRETE CULVERT SLAB
AutoCAD SHX Text
CONTRACTOR TO FIELD
AutoCAD SHX Text
CONTRACTOR TO FIELD
AutoCAD SHX Text
TWO W-BEAM GUARDRAIL SECTS. (NESTED)
AutoCAD SHX Text 0" to
AutoCAD SHX Text 0" to
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text PL "x10"x6" 58"x10"x6" SEE DETAIL
AutoCAD SHX Text 34" x (Ts + 2") A307BOLTS WITH WASHERS
AutoCAD SHX Text PL "x8"x6" 14"x8"x6" SEE DETAIL
AutoCAD SHX Text
W6X8.5 OR W6X9 POSTS AT 3'-11 #2" SPACING
AutoCAD SHX Text 1'-5 "34"
AutoCAD SHX Text 1'-5 "34"
AutoCAD SHX Text
6"X8"X14"TREATED WOOD OR POLYMER BLOCK
AutoCAD SHX Text 25'-0"
AutoCAD SHX Text 25'-0"
AutoCAD SHX Text
LINE OF NORMAL SLOPE CHANGE
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text 4:1 or
AutoCAD SHX Text 4:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text End
AutoCAD SHX Text End
AutoCAD SHX Text R.C.B.
AutoCAD SHX Text of R.C.B.
AutoCAD SHX Text ô
AutoCAD SHX Text
NORMAL PROJECT SIDE SLOPE. SEE TYPICAL SECTIONS.
AutoCAD SHX Text
SEE DESIGN PARAMETERS TABLE FOR RADIUS AND FLARE RATE.
AutoCAD SHX Text ô
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4'-0" FROM FACE OF GUARDRAIL
FILE NAME: P:\_Civil\HP16.021.03 FTL FY18 Infrastructure\06_Drawing\04_AutoCAD\FLKS_Standard Drawings\SHEETS\FLCE203.dwg LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PMP:\_Civil\HP16.021.03 FTL FY18 Infrastructure\06_Drawing\04_AutoCAD\FLKS_Standard Drawings\SHEETS\FLCE203.dwg LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PMCandace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM PLOTTED: 2/26/2020 12:30 PM2/26/2020 12:30 PM
G
A R
D R
A I L
FLCE204
A
FINAL DESIGN DOCUMENTS
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
T h o m a s
A
D o w
Y e a g e r
Q
C
O P
T I O
N A
L
F
I E
T
P
T I O
N A
L
F
I E
T
O
A
V E
N W
O R
T H
K
A N
S A
S
Y A
E G
C
H I T
E C
T U
R E
R
E E
T
O V
E R
L A
R
K
K
S
D I R
E C
T O
R A
P
U B
L
R
K S
F O
A
V E
N W
O R
A
N D
A R
D
D
E T
A I L
S
D I R
E C
T O
R A
P
U B
L
R
K S
M c C l e l l a n
A v e
B l d g
F o r t
L e a v e n w o r t h
K
S
US Army Corps of Engineers ®
C B a r n e s
AutoCAD SHX Text
TYPICAL W-BEAM RAIL
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
POST DETAILS
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL ALIGNMENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Welding is to be completed using the Gas-Metal Arc Welding process with ER70S-3 welding wire and argon-oxygen or CO2 cover gas.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
GUARDRAIL FOR BRIDGE SIZED STRUCTURES
AutoCAD SHX Text E1
AutoCAD SHX Text PL "x11"x8 " 14"x11"x8 " 12" SEE DETAIL A
AutoCAD SHX Text 1 DIA. x (T+2") A307 BOLTS WITH WASHERS
AutoCAD SHX Text
REINFORCED CONCRETE CULVERT SLAB
AutoCAD SHX Text PL "x12"x8 " 12"x12"x8 " 12" SEE DETAIL A
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text
NORMAL
AutoCAD SHX Text of R.C.B.
AutoCAD SHX Text
TYPICAL ELEVATIONS
AutoCAD SHX Text PL "x12"x8 "12"x12"x8 "12"
AutoCAD SHX Text
3 PASS WELD
AutoCAD SHX Text 516"
AutoCAD SHX Text Embed anchor rod a min. of 8" Use a bonding agent with a min.bond strength of 1,800 psi.
AutoCAD SHX Text 1" DIA. A307 GRADE A THREADED ROD WITH NUT AND WASHER TO BE GROUTED WITH AN APPROVED EPOXY OR POLYESTER RESIN IN ACCORDANCE WITH KSDOT SPECIFICATIONS.
AutoCAD SHX Text PL "x12"x8 " 12"x12"x8 " 12" SEE DETAIL A
AutoCAD SHX Text PL "x12"x8 "12"x12"x8 "12"
AutoCAD SHX Text 1 "x1 " 14"x1 " 12" SLOTTED HOLES
AutoCAD SHX Text
DETAIL OF BASE PLATE
AutoCAD SHX Text PL "x11"x8 "14"x11"x8 "12"
AutoCAD SHX Text 1 "Dia.14"Dia.
AutoCAD SHX Text
DETAIL A FOR ATTACHMENT ASSEMBLY
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text 4:1 or
AutoCAD SHX Text 4:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text 3:1 or
AutoCAD SHX Text
NORMAL SHOULDER LINE
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
(MGS-FLEAT OR MGS-SRT) END TERMINAL
AutoCAD SHX Text
4'-0" FROM FACE OF GUARDRAIL
AutoCAD SHX Text
W-BEAM GUARDRAIL
AutoCAD SHX Text
W-BEAM GUARDRAIL
AutoCAD SHX Text 12'-6"
AutoCAD SHX Text 12'-6"
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
4:1 OR
AutoCAD SHX Text
LINE OF NORMAL SLOPE CHANGE
AutoCAD SHX Text
3:1 OR
AutoCAD SHX Text
3:1 OR
AutoCAD SHX Text
END
AutoCAD SHX Text
END
AutoCAD SHX Text 4:1
AutoCAD SHX Text 4:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text 3:1
AutoCAD SHX Text Slope var.
AutoCAD SHX Text W-Beam Guardrail
AutoCAD SHX Text W-Beam Guardrail
AutoCAD SHX Text W-Beam Guardrail
AutoCAD SHX Text 12'-6"
AutoCAD SHX Text 12'-6"
AutoCAD SHX Text
TERMINAL CONNECTOR
AutoCAD SHX Text
PARTIAL ELEVATION
AutoCAD SHX Text
PARTIAL PLAN
AutoCAD SHX Text SECTION C-C (Steel Post)
AutoCAD SHX Text SECTION C-C (Wood Post)
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text Symm. about
AutoCAD SHX Text E.W.S.
AutoCAD SHX Text 10d Galvanized nail (One per (One per (One per post to hold block)
AutoCAD SHX Text OPTIONAL "X1 " SLOTTED 2932"X1 " SLOTTED 34" SLOTTED HOLES ROTATED 50° (TYPICAL) (12 REQ'D.)
AutoCAD SHX Text
SECTION B-B THRU RAIL ELEMENT TYPICAL W-BEAM
AutoCAD SHX Text SECTION A-A THRU RAIL ELEMENT TYPICAL THRIE BEAM TYPICAL THRIE BEAMTYPICAL THRIE BEAM
AutoCAD SHX Text Note: GUARDRAIL IS SHOWN WITH WOOD POSTS. HOWEVER THE CONTRACTOR HAS THE OPTION OF PROVIDING WOOD OR STEEL POSTS.
AutoCAD SHX Text 6"x8"x18" Treated Wood
AutoCAD SHX Text
BOLTS "A"
AutoCAD SHX Text W6x8.5 or W6X9 x 6'-6" Post
AutoCAD SHX Text 1516"R
AutoCAD SHX Text 38"R.
AutoCAD SHX Text 1516"R.
AutoCAD SHX Text GENERAL NOTES 1. USE GALVANIZED 12 GAUGE STEEL RAIL ELEMENTS UNLESS USE GALVANIZED 12 GAUGE STEEL RAIL ELEMENTS UNLESS OTHERWISE NOTED. USE GALVANIZED ANCHOR BOLTS AND USE GALVANIZED ANCHOR BOLTS AND USE GALVANIZED ANCHOR BOLTS AND POST RAIL FITTINGS, SEE PROJECT SPECIFICATIONS. SUPPLY PROJECT SPECIFICATIONS. SUPPLY SPECIFICATIONS. SUPPLY GUARD RAIL PARTS THAT ARE INTERCHANGEABLE WITH SIMILAR PARTS REGARDLESS OF SOURCE OR MANUFACTURER. 2. FABRICATE TERMINAL CONNECTOR FROM 10 GAUGE STEEL, SEE FABRICATE TERMINAL CONNECTOR FROM 10 GAUGE STEEL, SEE STANDARD SPECIFICATION.THE CONNECTOR HAS THE SAME SECTION AS THRIE BEAM GUARDRAIL 3. SHOP CURVE RAILS WHEN RADIUS IS LESS THAN 150'. SHOP CURVE RAILS WHEN RADIUS IS LESS THAN 150'. 4. LAP GUARDRAIL SPLICES, INCLUDING TERMINAL CONNECTOR, IN LAP GUARDRAIL SPLICES, INCLUDING TERMINAL CONNECTOR, IN THE DIRECTION OF TRAFFIC. WHERE TRAFFIC IS TEMPORARILY TRAFFIC. WHERE TRAFFIC IS TEMPORARILY TRAFFIC. WHERE TRAFFIC IS TEMPORARILY CARRIED IN THE OPPOSITE DIRECTION OF FINAL FINAL FINAL CONFIGURATION, LAP RAIL SPLICES IN THE DIRECTION OF PERMANENT TRAFFIC. 5. BRIDGE TO GUARDRAIL TRANSITION CONSISTS OF 1- 25'-0" BRIDGE TO GUARDRAIL TRANSITION CONSISTS OF 1- 25'-0" THRIE BEAM WITH 1- 12'-6" THRIE BEAM SECTION NESTED IN 1- 12'-6" THRIE BEAM SECTION NESTED IN 1- 12'-6" THRIE BEAM SECTION NESTED IN BACK OF 25'-0" SECTION (SEE LAYOUT), 1- THRIE BEAM TO 1- THRIE BEAM TO 1- THRIE BEAM TO W-BEAM ASYMMETRICAL TRANSITION SECTION. USE ASSOCIATED HARDWARE WITH POST SPACING SHOWN. HARDWARE WITH POST SPACING SHOWN. HARDWARE WITH POST SPACING SHOWN. 6. USE W-BEAM GUARDRAIL WITH 6'-3" POST SPACING WITH USE W-BEAM GUARDRAIL WITH 6'-3" POST SPACING WITH RAIL FURNISHED IN 12'-6" OR 25'-0" SECTIONS.
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text Neutral Axis
AutoCAD SHX Text
13'-0" (4" EDGE CURB)(REQUIRED)
AutoCAD SHX Text 6"x8"x21 " BLOCK58" BLOCK
AutoCAD SHX Text
12'-6" NESTED THRIE BEAM
AutoCAD SHX Text
12'-6" NESTED THRIE BEAM
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text 6'-3"
AutoCAD SHX Text
THRIE BEAM TERMINAL CONNECTOR
AutoCAD SHX Text
13'-0" (4" EDGE CURB) (REQUIRED)
AutoCAD SHX Text
THRIE BEAM TERMINAL GUARDRAIL
AutoCAD SHX Text
TRANSITION SECTION
AutoCAD SHX Text
STANDARD W-BEAM GUARDRAIL
AutoCAD SHX Text 6"x8"x6'-6" WOOD POST
AutoCAD SHX Text 6"x8"x18" TREAT WOOD OR POLYMER BLOCK
AutoCAD SHX Text
58" STEEL WASHER
AutoCAD SHX Text
BOLTS "C"
AutoCAD SHX Text 34"x 2 " POST BOLT 12" POST BOLT SLOTTED HOLES (OPTIONAL)
AutoCAD SHX Text
1" DIA. HOLES
AutoCAD SHX Text 2932"x1 " SLOTTED HOLES18" SLOTTED HOLES
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
NEUTRAL AXIS
AutoCAD SHX Text 2932"x 1 " SLOTTED HOLES x 1 " SLOTTED HOLES 18" SLOTTED HOLES
AutoCAD SHX Text 34"x 2 " SLOTTED HOLEx 2 " SLOTTED HOLE12" SLOTTED HOLE
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
116"TOLERANCE
AutoCAD SHX Text
NEUTRAL AXIS
AutoCAD SHX Text Symm.
AutoCAD SHX Text Symm.
AutoCAD SHX Text
1" DIA. HOLE
AutoCAD SHX Text
RECTANGULAR WASHER TO BE USED ON TERMINAL CONNECTOR ONLY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
GUARDRAIL FOR 30MPH AND UNDER
AutoCAD SHX Text A1
AutoCAD SHX Text Radius = 625.08' Normal project side slope. See typical sections.
AutoCAD SHX Text ALTERNATE POST ATTACHMENT (THIS ATTACHMENT TO BE USED ONLY WHEN BOLTING THROUGH THE TOP SLAB IS NOT PRACTICAL.)
AutoCAD SHX Text
RECTANGULAR WASHER (OTHER APPROVED WASHER MAY BE USED.)
AutoCAD SHX Text ELEVATION TRANSITION SECTION (From Thrie Beam to W-Beam rail)
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text Safety type bridge rail
AutoCAD SHX Text Nested guardrail
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GUARDRAIL ATTACHMENT TO SAFETY SHAPE BRIDGE RAIL
AutoCAD SHX Text
RECTANGULAR WASHERS (5 REQ.)
AutoCAD SHX Text 78"Dia.x14" HEX HEAD BOLTS (5 REQ.)
AutoCAD SHX Text
DIRECTION OF TRAFFIC
AutoCAD SHX Text 78" DIA. WASHERS (5 req.)
AutoCAD SHX Text 78" DIA. HEX NUTS (5 req.)
AutoCAD SHX Text Midspan splice
AutoCAD SHX Text
DETAIL OF STEEL PLATE
FILE NAME: P:\_Civil\HP16.021.03 FTL FY18 Infrastructure\06_Drawing\04_AutoCAD\FLKS_Standard Drawings\SHEETS\FLCE204.dwg LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PMP:\_Civil\HP16.021.03 FTL FY18 Infrastructure\06_Drawing\04_AutoCAD\FLKS_Standard Drawings\SHEETS\FLCE204.dwg LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM LAST SAVED BY: Candace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PMCandace Barnes SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM SAVED DATE: 2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM2/26/2020 12:15 AM PLOTTED: 2/26/2020 12:30 PM PLOTTED: 2/26/2020 12:30 PM2/26/2020 12:30 PM
N D
R A
I L
FLCE205
A
FINAL DESIGN DOCUMENTS
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
T h o m a s
A
D o w
Y e a g e r
Q
C
O P
T I O
N A
L
F
I E
T
P
T I O
N A
L
F
I E
T
O
A
V E
N W
O R
T H
K
A N
S A
S
Y A
E G
C
H I T
E C
T U
R E
R
E E
T
O V
E R
L A
R
K
K
S
D I R
E C
T O
R A
P
U B
L
R
K S
F O
A
V E
N W
O R
A
N D
A R
D
D
E T
A I L
S
D I R
E C
T O
R A
P
U B
L
R
K S
M c C l e l l a n
A v e
B l d g
F o r t
L e a v e n w o r t h
K
S
US Army Corps of Engineers ®
C B a r n e s
AutoCAD SHX Text
TYPICAL METAL HANDRAIL ELEVATION ON CONCRETE HEADWALL & WINGWALL
AutoCAD SHX Text
14" CAP PLATE
AutoCAD SHX Text 316"
AutoCAD SHX Text HANDRAIL GENERAL NOTES: 1. GALVANIZE ALL RAIL, POSTS, PICKETS, AND BASE PLATES AFTER FABRICATION IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123. COLOR TO BE APPROVED GALVANIZE ALL RAIL, POSTS, PICKETS, AND BASE PLATES AFTER FABRICATION IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123. COLOR TO BE APPROVED PER DPW PROJECT MANAGER. HANDRAILS SHALL BE PROTECTED FROM ANY DAMAGE TO THE FINISHED SURFACE. NO FIELD GALVANIZING WILL BE ALLOWED. 2. SET RAILS PARALLEL TO THE TOP OF THE WALL. SET POSTS AND PICKETS VERTICAL IN BOTH PLANES OF THE HANDRAIL. SHIMS MAY BE USED BETWEEN CONCRETE SET RAILS PARALLEL TO THE TOP OF THE WALL. SET POSTS AND PICKETS VERTICAL IN BOTH PLANES OF THE HANDRAIL. SHIMS MAY BE USED BETWEEN CONCRETE AND BASE PLATE OF STEEL POST. 3. GRIND SMOOTH ALL TOP AND BOTTOM RAIL-TO-POST WELDED CONNECTIONS. FIELD WELDING IS NOT PERMITTED. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS GRIND SMOOTH ALL TOP AND BOTTOM RAIL-TO-POST WELDED CONNECTIONS. FIELD WELDING IS NOT PERMITTED. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO FABRICATION OF THE HANDRAIL. FIELD VERIFY AS-BUILT DIMENSIONS AND ELEVATIONS OF RETAINING WALLS, HUBGUARDS OR WINGWALLS PRIOR TO FABRICATION OF HANDRAIL. POST SPACING WILL BE REVIEWED DURING THE DESIGN REVIEW PERIOD TO COORDINATE WITH EXPANSION AND CONTRACTION JOINT SPACING IN THE WALL. 4. FABRICATE HANDRAIL IN LENGTHS TO INCLUDE A MINIMUM OF ONE AND A MAXIMUM OF THREE PANELS. FABRICATE HANDRAIL IN LENGTHS TO INCLUDE A MINIMUM OF ONE AND A MAXIMUM OF THREE PANELS. 5. ATTACH TOP RAIL MEMBERS TO AT LEAST TWO POSTS. LOCATE CENTER OF RAIL SPLICES 1'-9" FROM CENTERLINE OF POST UNLESS SHOWN OTHERWISE. ATTACH TOP RAIL MEMBERS TO AT LEAST TWO POSTS. LOCATE CENTER OF RAIL SPLICES 1'-9" FROM CENTERLINE OF POST UNLESS SHOWN OTHERWISE. 6. THE THREADED ROD CONCRETE ANCHORS SHALL BE GALVANIZED AND PROVIDE A MINIMUM PULLOUT STRENGTH OF 8000 POUNDS ON 4000 PSI CONCRETE. LENGTH THE THREADED ROD CONCRETE ANCHORS SHALL BE GALVANIZED AND PROVIDE A MINIMUM PULLOUT STRENGTH OF 8000 POUNDS ON 4000 PSI CONCRETE. LENGTH OF EMBEDMENT INTO CONCRETE SHALL CONFORM TO MANUFACTURER'S RECOMMENDATIONS. AFTER THE HOLES ARE DRILLED, REMOVE ALL LOOSE MATERIAL BY USING A WIRE BRUSH TO FREE THE DUST FROM THE SIDE OF THE HOLE AND THEN VACUUMING TO REMOVE MATERIAL AND DUST. PLACE EPOXY CAPSULE SYSTEM IN THE HOLE AND INSERT THE THREADED ROD IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS.
AutoCAD SHX Text
END PANEL
AutoCAD SHX Text
END PANEL
AutoCAD SHX Text
TYPICAL PANEL
AutoCAD SHX Text
TYPICAL PANEL
AutoCAD SHX Text
34" X " PICKETS @ 4 " CTRS. 34" PICKETS @ 4 " CTRS. 12" CTRS.
AutoCAD SHX Text
34" X " PICKETS @ 4 " CTRS. 34" PICKETS @ 4 " CTRS. 12" CTRS.
AutoCAD SHX Text
END PANEL
AutoCAD SHX Text
END PANEL
AutoCAD SHX Text
TYPICAL PANEL
AutoCAD SHX Text
TYPICAL PANEL
AutoCAD SHX Text
34" X " PICKETS @ 4 " CTRS.34" PICKETS @ 4 " CTRS.12" CTRS.
AutoCAD SHX Text
34" X " PICKETS @ 4 " CTRS.34" PICKETS @ 4 " CTRS.12" CTRS.
AutoCAD SHX Text
TOP OF WINGWALL
AutoCAD SHX Text
WINGWALL JOINT (PLAN ANGLES OF RCB/ WINGWALL NOT SHOWN FOR CLARITY)
AutoCAD SHX Text
TOP OF HUBGUARD
AutoCAD SHX Text
RCB OPENING
AutoCAD SHX Text
RAIL SPLICE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HANDRAIL ON CONCRETE HEADWALL AND WINGWALL
AutoCAD SHX Text D1
AutoCAD SHX Text
BOTTOM RAIL - 3/4"X1 1/2" STEEL BAR ASTM A709, GRADE 36
AutoCAD SHX Text
PICKET - 3/4"X3/4" STEEL BAR ASTM A709, GRADE 36
AutoCAD SHX Text TOP RAIL - 2 1/2"x2 1/2"x1/4" STRUCTURAL TUBING ASTM A500, GRADE B
AutoCAD SHX Text POST- 2 1/2"x2 1/2"x1/4" STRUCTURAL TUBING ASTM A500, GRADE B
AutoCAD SHX Text
TYPICAL PANEL
AutoCAD SHX Text
TYPICAL PANEL
AutoCAD SHX Text
34" X " PICKETS @ 4 " CTRS.34" PICKETS @ 4 " CTRS.12" CTRS.
AutoCAD SHX Text
34" X " PICKETS @ 4 " CTRS.34" PICKETS @ 4 " CTRS.12" CTRS.
AutoCAD SHX Text
TYPICAL METAL HANDRAIL ELEVATION ON CONCRETE RETAINING WALL
AutoCAD SHX Text
14" CAP PLATE
AutoCAD SHX Text 316"
AutoCAD SHX Text 14"
AutoCAD SHX Text 316"
AutoCAD SHX Text
TYP.
AutoCAD SHX Text 14"
AutoCAD SHX Text
12" GAP
AutoCAD SHX Text
12" GAP
AutoCAD SHX Text 316"
AutoCAD SHX Text
TYP.
AutoCAD SHX Text 316"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
CENTER HANDRAIL ON
AutoCAD SHX Text
CENTER HANDRAIL ON
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HANDRAIL ON RETAINING WALL DETAILS
AutoCAD SHX Text A1
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HANDRAIL ON RETAINING WALL
AutoCAD SHX Text D6
AutoCAD SHX Text BOTTOM RAIL - "x 1 " STEEL 34"x 1 " STEEL 12" STEEL BAR ASTM A709, GRADE 36
AutoCAD SHX Text PICKET - " x " 34" x " 34" STEEL BAR ASTM A709, GRADE 36
AutoCAD SHX Text
CONTRACTION OR EXPANSION JOINT
AutoCAD SHX Text
RAIL SPLICE
AutoCAD SHX Text POST - 2 "x2 "x " 12"x2 "x " 12"x " 14" STRUCTURAL TUBING ASTM A500, GRADE B
AutoCAD SHX Text TOP RAIL - 2 "x2 "x " 12"x2 "x " 12"x " 14" STRUCTURAL TUBING ASTM A500, GRADE B
AutoCAD SHX Text
END PANEL
AutoCAD SHX Text
END PANEL
AutoCAD SHX Text
END OF RETAINING WALL
AutoCAD SHX Text
TOP OF RETAINING WALL
AutoCAD SHX Text
HANDRAIL
AutoCAD SHX Text
TOP OF WALL OR HUBGUARD
AutoCAD SHX Text
1/2" THREADED RODCONCRETE ANCHOR (DRILL IN PLACE WITH ADHESIVE ANCHORING SYSTEM)
AutoCAD SHX Text
SECTION THRU RAIL
AutoCAD SHX Text
POST DETAIL
AutoCAD SHX Text
RAIL SPLICE DETAIL
AutoCAD SHX Text
BASE PLATE DETAIL
AutoCAD SHX Text
8" SHIM DETAIL
AutoCAD SHX Text
6" SHIM DETAIL
AutoCAD SHX Text BASE PLATE - 5/8"x6"x8" GALVANIZED STEEL PLATE
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST & RAIL
AutoCAD SHX Text
3/4" HOLESFOR 1/2" STUDCONCRETE ANCHORS
AutoCAD SHX Text
GALVANIZED STEEL NUTS AND WASHERS
AutoCAD SHX Text
SHIM - 1/16"X2 1/2"X8" GALVANIZED STEEL PLATE
AutoCAD SHX Text
TOP RAIL
AutoCAD SHX Text
PICKET
AutoCAD SHX Text
POST
AutoCAD SHX Text
BOTTOM RAIL
AutoCAD SHX Text
1/2" DRAIN HOLE(FACE AWAY FROM SIDEWALK)
AutoCAD SHX Text
SHIM (4 SHIMS MAX.)
AutoCAD SHX Text
BASE PLATE
AutoCAD SHX Text
BOTTOM RAIL
AutoCAD SHX Text SLEEVE - 2"x2"x3/16" STRUCTURAL TUBING ASTM A500, GRADE B
AutoCAD SHX Text
RAIL SPLICE
AutoCAD SHX Text
PICKET
AutoCAD SHX Text
TOP RAIL
AutoCAD SHX Text
SHIM - 1/16"X2 1/2"X8" GALVANIZED STEEL PLATE
AutoCAD SHX Text HANDRAIL GENERAL NOTES: 1. GALVANIZE ALL RAIL, POSTS, PICKETS, AND BASE PLATES AFTER FABRICATION IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123. COLOR TO BE GALVANIZE ALL RAIL, POSTS, PICKETS, AND BASE PLATES AFTER FABRICATION IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123. COLOR TO BE APPROVED PER DPW PROJECT MANAGER. HANDRAILS SHALL BE PROTECTED FROM ANY DAMAGE TO THE FINISHED SURFACE. NO FIELD GALVANIZING WILL BE ALLOWED. 2. SET RAILS PARALLEL TO THE TOP OF THE WALL. SET POSTS AND PICKETS VERTICAL IN BOTH PLANES OF THE HANDRAIL. SHIMS MAY BE USED BETWEEN SET RAILS PARALLEL TO THE TOP OF THE WALL. SET POSTS AND PICKETS VERTICAL IN BOTH PLANES OF THE HANDRAIL. SHIMS MAY BE USED BETWEEN CONCRETE AND BASE PLATE OF STEEL POST. 3. GRIND SMOOTH ALL TOP AND BOTTOM RAIL-TO-POST WELDED CONNECTIONS. FIELD WELDING IS NOT PERMITTED. THE CONTRACTOR SHALL SUBMIT SHOP GRIND SMOOTH ALL TOP AND BOTTOM RAIL-TO-POST WELDED CONNECTIONS. FIELD WELDING IS NOT PERMITTED. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO FABRICATION OF THE HANDRAIL. FIELD VERIFY AS-BUILT DIMENSIONS AND ELEVATIONS OF RETAINING WALLS, HUBGUARDS OR WINGWALLS PRIOR TO FABRICATION OF HANDRAIL. POST SPACING WILL BE REVIEWED DURING THE DESIGN REVIEW PERIOD TO COORDINATE WITH EXPANSION AND CONTRACTION JOINT SPACING IN THE WALL. 4. FABRICATE HANDRAIL IN LENGTHS TO INCLUDE A MINIMUM OF ONE AND A MAXIMUM OF THREE PANELS. FABRICATE HANDRAIL IN LENGTHS TO INCLUDE A MINIMUM OF ONE AND A MAXIMUM OF THREE PANELS. 5. ATTACH TOP RAIL MEMBERS TO AT LEAST TWO POSTS. LOCATE CENTER OF RAIL SPLICES 1'-9" FROM CENTERLINE OF POST UNLESS SHOWN OTHERWISE. ATTACH TOP RAIL MEMBERS TO AT LEAST TWO POSTS. LOCATE CENTER OF RAIL SPLICES 1'-9" FROM CENTERLINE OF POST UNLESS SHOWN OTHERWISE. 6. THE THREADED ROD CONCRETE ANCHORS SHALL BE GALVANIZED AND PROVIDE A MINIMUM PULLOUT STRENGTH OF 8000 POUNDS ON 4000 PSI CONCRETE. THE THREADED ROD CONCRETE ANCHORS SHALL BE GALVANIZED AND PROVIDE A MINIMUM PULLOUT STRENGTH OF 8000 POUNDS ON 4000 PSI CONCRETE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .