This document contains a bid sheet template for a federal construction contract opportunity to provide concrete and related work at Fort Leavenworth, Kansas. The bid sheet includes 224 line items for new and replacement concrete work such as sidewalks, curbs, slabs, walls and pavement. It also includes items for excavation, erosion control, landscaping and miscellaneous construction tasks. Pricing is solicited by unit of measure with quantities provided. The opportunity includes a base year of performance and two optional one-year extensions.

View the file

Other files for this federal contract opportunity

Other files attached to Amend #0002 Installation Concrete Requirement, newest first.
File Type Posted
BID_SHEET-CONCRETE-FINAL_20240325.xlsx XLSX spreadsheet
Amend 02_W91QF4-24-B-0001 Concrete Requirement.pdf PDF
SOW_Concrete 6 Mar 20240306.docx DOCX document
BID_SHEET-CONCRETE-FINAL_20240306.xlsx XLSX spreadsheet
Amend 01_Q and A_W91QF424B0001 Concrete.pdf PDF
Ft Leavenworth Concrete Civil Standard Details.pdf PDF
Specs_Concrete Requirement_FY 24.pdf PDF
WD-KS20240154_Highway_Heavy_dtd_20240105.pdf PDF
SOW_W91QF4-24-B-0001_20240215.pdf PDF
Sol_W91QF4-24-B-0001 Installation Concrete.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YEAR

BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEQUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00500$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00400$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0010$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0030$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.003,000$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0050$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0010$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0030$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
19New Pervious PCCP SurchageSQYD$0.003,200$ - 0
20Color Staining of PCCPSQYD$0.00750$ - 0
21Concrete Pavement Seal 100 to 1000 Square YardsSQYD$0.00750$ - 0
22Concrete Pavement Seal over 1000 Square YardsSQYD$0.002,000$ - 0
23New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$0.00250$ - 0
24Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$0.00250$ - 0
25New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.00150$ - 0
26Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.00500$ - 0
27New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0020$ - 0
28Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0060$ - 0
29New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0020$ - 0
30Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0060$ - 0
31New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.00150$ - 0
32Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
33New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.005$ - 0
34Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.0020$ - 0
35Falsework for Elevated SlabN/AN/ASQFT$0.00200$ - 0
36Concrete Wall03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
37Concrete Footer03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
38New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$0.00150$ - 0
39Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$0.00200$ - 0
40New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$0.005$ - 0
41Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$0.0010$ - 0
42Capillary Water Barrier (4")03 30 00
31 00 00Cast-in-Place Concrete EarthworkSQYD$0.00200$ - 0
43Vaper Barrier03 30 00
31 00 00Cast-in-Place Concrete EarthworkSQYD$0.00200$ - 0
44Flowable Fill ConcreteN/AN/ACUYD$0.0030$ - 0
45Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$0.0012,500$ - 0
46Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$0.00500$ - 0
47Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD$0.00810$ - 0
48Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$0.004,200$ - 0
49Colored Concrete (Concrete Dye Surcharge)N/ANO BIDCUYD$0.00100$ - 0
50Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD$0.00500$ - 0
51Saw Cut Concrete or Asphalt 4" ThickN/AN/ALNFT$0.00900$ - 0
52Saw Cut Concrete or Asphalt 6" ThickN/AN/ALNFT$0.00600$ - 0
53Saw Cut Concrete or Asphalt 8" ThickN/AN/ALNFT$0.00400$ - 0
54Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.003,000$ - 0
55Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.00500$ - 0
56Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.0050$ - 0
57New handrail (<30" above ground)05 52 00Metal RailingsLNFT$0.00150$ - 0
58Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT$0.00100$ - 0
59New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$0.00200$ - 0
60Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$0.0050$ - 0
61Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD$0.00100$ - 0
62Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD$0.00250$ - 0
63Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD$0.00600$ - 0
64Common Excavation31 00 00EarthworkCUYD$0.001,500$ - 0
65Common Excavation (Government Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
66Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
67Embankment31 00 00EarthworkCUYD$0.00120$ - 0
68Embankment (Contractor Furnished)31 00 00EarthworkCUYD$0.00250$ - 0
69Salvage Topsoil31 00 00EarthworkSQYD$0.001,000$ - 0
70Topsoil (Government Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
71Rock Excavation31 00 00EarthworkCUYD$0.00250$ - 0
72Rip-Rap (D50)(4")31 00 00EarthworkCUYD$0.00100$ - 0
73Rip-Rap (D50)(6")31 00 00EarthworkCUYD$0.00100$ - 0
74Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD$0.00150$ - 0
75Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$0.004$ - 0
76Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$0.004$ - 0
77Geotextile Separation Fabric31 05 19GeosyntheticsSQYD$0.003,500$ - 0
78Core Drill (4”) Pavement SamplingN/AN/AEACH$0.0010$ - 0
79In-Situ Soil Sampling and Testing for soil classificationEACH$0.008$ - 0
80Replace Asphalt Incidental to Work32 12 16HMACUFT$0.00100$ - 0
81Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.0012,734$ - 0
82Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.0021,223$ - 0
83Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.0062,451$ - 0
84Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT$0.0083,268$ - 0
85Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT$0.00817$ - 0
86Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT$0.00734$ - 0
87Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT$0.00685$ - 0
88Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
89Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
90Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
91Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$0.0016$ - 0
92Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$0.0016$ - 0
93Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH$0.0031$ - 0
94Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.003$ - 0
95Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.007$ - 0
96Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.0025,338$ - 0
97Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT$0.005,068$ - 0
98Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT$0.00706$ - 0
99Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT$0.00639$ - 0
100Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT$0.00605$ - 0
101Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
102Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
103Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
104Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.003$ - 0
105Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.006$ - 0
106Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT$0.00585$ - 0
107Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT$0.00554$ - 0
108Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT$0.00543$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
110Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
111Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
112Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$0.0016$ - 0
113Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$0.0016$ - 0
114Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.0031$ - 0
115Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.003$ - 0
116Inset Pavement Markings33 17 23Pavement MarkingsSQFT$0.00250$ - 0
117Pavement Marking Removal33 17 23Pavement MarkingsSQFT$0.003,000$ - 0
118Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
119Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH$0.004$ - 0
120Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH$0.0010$ - 0
121Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT$0.0030$ - 0
122Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH$0.0020$ - 0
123Construct 6" Corrugated HDPE Subdrain33 40 00Storm Drainage UtilitiesLNFT$0.00300$ - 0
124Construct 8" Corrugated HDPE Subdrain33 40 00Storm Drainage UtilitiesLNFT$0.00300$ - 0
125Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.00250$ - 0
126Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.00300$ - 0
127Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.00200$ - 0
128Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.0075$ - 0
129Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.0050$ - 0
130Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00250$ - 0
131Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00200$ - 0
132Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00150$ - 0
133Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00125$ - 0
134Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00100$ - 0
135Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT$0.0080$ - 0
136Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.004$ - 0
137Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.004$ - 0
138Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
139Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
140Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
141Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
142Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD$0.00500$ - 0
143Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD$0.00750$ - 0
144Trench Box (8' Tall)31 00 00EarthworkWKLY$0.0020$ - 0
145Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT$0.0040$ - 0
146Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
147Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
148Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
149Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH$0.0040$ - 0
150Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH$0.0040$ - 0
151Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH$0.0024$ - 0
152Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT$0.0040$ - 0
153Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT$0.0040$ - 0
154Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$0.0060$ - 0
155Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$0.0020$ - 0
156TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$0.0080$ - 0
157Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH$0.00100$ - 0
158Fence Posts (Metal)(2")32 31 13FencingEACH$0.0025$ - 0
159Fence Fabric, Chain-Link32 31 13FencingSQYD$0.00150$ - 0
1603 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT$0.00400$ - 0
161Fence Gate, Single Swing (4' Width) with Gate Posts32 31 13FencingEACH$0.005$ - 0
162Fence Gate, Single Swing (6' Width) with Gate Posts32 31 13FencingEACH$0.005$ - 0
163Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH$0.0010$ - 0
164Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT$0.00500$ - 0
165Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH$0.0015$ - 0
166Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH$0.00250$ - 0
167Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH$0.00400$ - 0
168New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT$0.00100$ - 0
169Replace CMU04 20 00Unit MasonryEACH$0.001,200$ - 0
170Repointing Brick Masonry04 20 00Unit MasonryLNFT$0.002,500$ - 0
171Repointing Stone Masonry04 20 00Unit MasonryLNFT$0.001,500$ - 0
172Repointing Concrete Masonry04 20 00Unit MasonryLNFT$0.002,500$ - 0
173Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH$0.0024$ - 0
174Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$0.00500$ - 0
175Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$0.00500$ - 0
176Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$0.0050$ - 0
177Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$0.0050$ - 0
178Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT$0.0050$ - 0
179Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT$0.0050$ - 0
180Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT$0.00250$ - 0
181Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT$0.0010$ - 0
182Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT$0.005$ - 0
183Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT$0.00100$ - 0
184Concrete Chimney Crown04 20 00Unit MasonryCUFT$0.0030$ - 0
185Man Lift01 35 26Government Safety RequirementsDAY$0.0025$ - 0
186Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF$0.0020$ - 0
187Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF$0.0050$ - 0
188Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF$0.0050$ - 0
189Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT$0.00200$ - 0
190Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00700$ - 0
191Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00200$ - 0
192Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00700$ - 0
193Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00100$ - 0
194Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00500$ - 0
195Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$0.00100$ - 0
196Remove and Replace Permeable Concrete Pavers Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00500$ - 0
197New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00300$ - 0
198New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00105$ - 0
199New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00200$ - 0
200New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$0.0030$ - 0
201New Permeable Concrete Pavers Vehicle over 100 SF32 16 15Unit PaversSQFT$0.008,500$ - 0
202Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH$0.002$ - 0
203Conduit, galvanized, 1" diameterN/AN/ALNFT$0.00200$ - 0
204Clearing Vegetation31 11 00Clearing and GrubbingACRE$0.005$ - 0
205Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE$0.003$ - 0
206Silt Fence01 57 19Temporary Environmental ControlsLNFT$0.00200$ - 0
207Biodegrable Log01 57 19Temporary Environmental ControlsLNFT$0.0050$ - 0
208Filter Sock01 57 19Temporary Environmental ControlsLNFT$0.00500$ - 0
209Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$0.00300$ - 0
210Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$0.0050$ - 0
211Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD$0.00500$ - 0
212Sodding32 92 23SoddingSQYD$0.00300$ - 0
213Professional Concrete EngineeringHR$0.0032$ - 0
214Fine Grading +/- 1/2" AVG.SQYD$0.00300$ - 0
215Concrete Pump (85CY/Day)DY$0.004$ - 0
216Water Stop For Concrete Pool - New Construction JointLNFT$0.00200$ - 0
217Water Stop For Concrete Pool - New To Existing Construction Joint (Perimeter)LNFT$0.00100$ - 0
218Pool Drain Box, Frame & GrateEACH$0.003$ - 0
219Pool Drain Piping (8" SCH 80 PVC & 6 Fittings)LNFT$0.0050$ - 0
220Pool Grounding (10' Copper Ground Rods & Wire W/CAD Weld - 20' Spacing)EACH$0.0050$ - 0
221Pool Concrete Coating & Markings (3 Coats On New Concrete )SQFT$0.00300$ - 0
222Demo & Dispose Brick (No Replacement, No Salvage for Later Use)04 20 00Unit MasonryEACH$0.002,500$ - 0
223Install New 4" Brick (No Removal)04 20 00Unit MasonrySQFT$0.00200$ - 0
224Demo and Salvage BrickSQFT$0.001,600$ - 0
SUBTOTAL$0.00$0.00
Work Inside Controlled Prisons markup10%Work inside USDB or JRCF?No$0.00
Sub-Total$0.00
225Payment & Performance Bond - On Task Order at or over $35,000.00%3%$ - 0$ - 0
226Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $0.00

OPTION YEAR #1

OPTION YEAR #1
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEQUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00500$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00400$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0010$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0030$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.003,000$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0050$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0010$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0030$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
19New Pervious PCCP SurchageSQYD$0.003,200$ - 0
20Color Staining of PCCPSQYD$0.00750$ - 0
21Concrete Pavement Seal 100 to 1000 Square YardsSQYD$0.00750$ - 0
22Concrete Pavement Seal over 1000 Square YardsSQYD$0.002,000$ - 0
23New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$0.00250$ - 0
24Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$0.00250$ - 0
25New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.00150$ - 0
26Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.00500$ - 0
27New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0020$ - 0
28Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0060$ - 0
29New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0020$ - 0
30Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0060$ - 0
31New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.00150$ - 0
32Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
33New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.005$ - 0
34Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.0020$ - 0
35Falsework for Elevated SlabN/AN/ASQFT$0.00200$ - 0
36Concrete Wall03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
37Concrete Footer03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
38New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$0.00150$ - 0
39Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$0.00200$ - 0
40New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$0.005$ - 0
41Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$0.0010$ - 0
42Capillary Water Barrier (4")03 30 00
31 00 00Cast-in-Place Concrete EarthworkSQYD$0.00200$ - 0
43Vaper Barrier03 30 00
31 00 00Cast-in-Place Concrete EarthworkSQYD$0.00200$ - 0
44Flowable Fill ConcreteN/AN/ACUYD$0.0030$ - 0
45Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$0.0012,500$ - 0
46Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$0.00500$ - 0
47Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD$0.00810$ - 0
48Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$0.004,200$ - 0
49Colored Concrete (Concrete Dye Surcharge)N/ANO BIDCUYD$0.00100$ - 0
50Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD$0.00500$ - 0
51Saw Cut Concrete or Asphalt 4" ThickN/AN/ALNFT$0.00900$ - 0
52Saw Cut Concrete or Asphalt 6" ThickN/AN/ALNFT$0.00600$ - 0
53Saw Cut Concrete or Asphalt 8" ThickN/AN/ALNFT$0.00400$ - 0
54Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.003,000$ - 0
55Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.00500$ - 0
56Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.0050$ - 0
57New handrail (<30" above ground)05 52 00Metal RailingsLNFT$0.00150$ - 0
58Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT$0.00100$ - 0
59New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$0.00200$ - 0
60Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$0.0050$ - 0
61Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD$0.00100$ - 0
62Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD$0.00250$ - 0
63Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD$0.00600$ - 0
64Common Excavation31 00 00EarthworkCUYD$0.001,500$ - 0
65Common Excavation (Government Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
66Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
67Embankment31 00 00EarthworkCUYD$0.00120$ - 0
68Embankment (Contractor Furnished)31 00 00EarthworkCUYD$0.00250$ - 0
69Salvage Topsoil31 00 00EarthworkSQYD$0.001,000$ - 0
70Topsoil (Government Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
71Rock Excavation31 00 00EarthworkCUYD$0.00250$ - 0
72Rip-Rap (D50)(4")31 00 00EarthworkCUYD$0.00100$ - 0
73Rip-Rap (D50)(6")31 00 00EarthworkCUYD$0.00100$ - 0
74Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD$0.00150$ - 0
75Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$0.004$ - 0
76Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$0.004$ - 0
77Geotextile Separation Fabric31 05 19GeosyntheticsSQYD$0.003,500$ - 0
78Core Drill (4”) Pavement SamplingN/AN/AEACH$0.0010$ - 0
79In-Situ Soil Sampling and Testing for soil classificationEACH$0.008$ - 0
80Replace Asphalt Incidental to Work32 12 16HMACUFT$0.00100$ - 0
81Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.0012,734$ - 0
82Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.0021,223$ - 0
83Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.0062,451$ - 0
84Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT$0.0083,268$ - 0
85Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT$0.00817$ - 0
86Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT$0.00734$ - 0
87Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT$0.00685$ - 0
88Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
89Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
90Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
91Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$0.0016$ - 0
92Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$0.0016$ - 0
93Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH$0.0031$ - 0
94Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.003$ - 0
95Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.007$ - 0
96Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.0025,338$ - 0
97Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT$0.005,068$ - 0
98Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT$0.00706$ - 0
99Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT$0.00639$ - 0
100Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT$0.00605$ - 0
101Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
102Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
103Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
104Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.003$ - 0
105Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.006$ - 0
106Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT$0.00585$ - 0
107Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT$0.00554$ - 0
108Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT$0.00543$ - 0
109Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
110Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
111Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
112Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$0.0016$ - 0
113Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$0.0016$ - 0
114Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.0031$ - 0
115Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.003$ - 0
116Inset Pavement Markings33 17 23Pavement MarkingsSQFT$0.00250$ - 0
117Pavement Marking Removal33 17 23Pavement MarkingsSQFT$0.003,000$ - 0
118Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
119Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH$0.004$ - 0
120Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH$0.0010$ - 0
121Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT$0.0030$ - 0
122Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH$0.0020$ - 0
123Construct 6" Corrugated HDPE Subdrain33 40 00Storm Drainage UtilitiesLNFT$0.00300$ - 0
124Construct 8" Corrugated HDPE Subdrain33 40 00Storm Drainage UtilitiesLNFT$0.00300$ - 0
125Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.00250$ - 0
126Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.00300$ - 0
127Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.00200$ - 0
128Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.0075$ - 0
129Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$0.0050$ - 0
130Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00250$ - 0
131Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00200$ - 0
132Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00150$ - 0
133Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00125$ - 0
134Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT$0.00100$ - 0
135Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT$0.0080$ - 0
136Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.004$ - 0
137Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.004$ - 0
138Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
139Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
140Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
141Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH$0.002$ - 0
142Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD$0.00500$ - 0
143Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD$0.00750$ - 0
144Trench Box (8' Tall)31 00 00EarthworkWKLY$0.0020$ - 0
145Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT$0.0040$ - 0
146Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
147Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
148Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH$0.005$ - 0
149Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH$0.0040$ - 0
150Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH$0.0040$ - 0
151Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH$0.0024$ - 0
152Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT$0.0040$ - 0
153Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT$0.0040$ - 0
154Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$0.0060$ - 0
155Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$0.0020$ - 0
156TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$0.0080$ - 0
157Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH$0.00100$ - 0
158Fence Posts (Metal)(2")32 31 13FencingEACH$0.0025$ - 0
159Fence Fabric, Chain-Link32 31 13FencingSQYD$0.00150$ - 0
1603 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT$0.00400$ - 0
161Fence Gate, Single Swing (4' Width) with Gate Posts32 31 13FencingEACH$0.005$ - 0
162Fence Gate, Single Swing (6' Width) with Gate Posts32 31 13FencingEACH$0.005$ - 0
163Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH$0.0010$ - 0
164Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT$0.00500$ - 0
165Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH$0.0015$ - 0
166Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH$0.00250$ - 0
167Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH$0.00400$ - 0
168New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT$0.00100$ - 0
169Replace CMU04 20 00Unit MasonryEACH$0.001,200$ - 0
170Repointing Brick Masonry04 20 00Unit MasonryLNFT$0.002,500$ - 0
171Repointing Stone Masonry04 20 00Unit MasonryLNFT$0.001,500$ - 0
172Repointing Concrete Masonry04 20 00Unit MasonryLNFT$0.002,500$ - 0
173Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH$0.0024$ - 0
174Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$0.00500$ - 0
175Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$0.00500$ - 0
176Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$0.0050$ - 0
177Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$0.0050$ - 0
178Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT$0.0050$ - 0
179Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT$0.0050$ - 0
180Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT$0.00250$ - 0
181Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT$0.0010$ - 0
182Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT$0.005$ - 0
183Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT$0.00100$ - 0
184Concrete Chimney Crown04 20 00Unit MasonryCUFT$0.0030$ - 0
185Man Lift01 35 26Government Safety RequirementsDAY$0.0025$ - 0
186Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF$0.0020$ - 0
187Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF$0.0050$ - 0
188Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF$0.0050$ - 0
189Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT$0.00200$ - 0
190Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00700$ - 0
191Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00200$ - 0
192Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00700$ - 0
193Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00100$ - 0
194Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00500$ - 0
195Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$0.00100$ - 0
196Remove and Replace Permeable Concrete Pavers Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00500$ - 0
197New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00300$ - 0
198New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$0.00105$ - 0
199New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$0.00200$ - 0
200New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$0.0030$ - 0
201New Permeable Concrete Pavers Vehicle over 100 SF32 16 15Unit PaversSQFT$0.008,500$ - 0
202Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH$0.002$ - 0
203Conduit, galvanized, 1" diameterN/AN/ALNFT$0.00200$ - 0
204Clearing Vegetation31 11 00Clearing and GrubbingACRE$0.005$ - 0
205Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE$0.003$ - 0
206Silt Fence01 57 19Temporary Environmental ControlsLNFT$0.00200$ - 0
207Biodegrable Log01 57 19Temporary Environmental ControlsLNFT$0.0050$ - 0
208Filter Sock01 57 19Temporary Environmental ControlsLNFT$0.00500$ - 0
209Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$0.00300$ - 0
210Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$0.0050$ - 0
211Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD$0.00500$ - 0
212Sodding32 92 23SoddingSQYD$0.00300$ - 0
213Professional Concrete EngineeringHR$0.0032$ - 0
214Fine Grading +/- 1/2" AVG.SQYD$0.00300$ - 0
215Concrete Pump (85CY/Day)DY$0.004$ - 0
216Water Stop For Concrete Pool - New Construction JointLNFT$0.00200$ - 0
217Water Stop For Concrete Pool - New To Existing Construction Joint (Perimeter)LNFT$0.00100$ - 0
218Pool Drain Box, Frame & GrateEACH$0.003$ - 0
219Pool Drain Piping (8" SCH 80 PVC & 6 Fittings)LNFT$0.0050$ - 0
220Pool Grounding (10' Copper Ground Rods & Wire W/CAD Weld - 20' Spacing)EACH$0.0050$ - 0
221Pool Concrete Coating & Markings (3 Coats On New Concrete )SQFT$0.00300$ - 0
222Demo & Dispose Brick (No Replacement, No Salvage for Later Use)04 20 00Unit MasonryEACH$0.002,500$ - 0
223Install New 4" Brick (No Removal)04 20 00Unit MasonrySQFT$0.00200$ - 0
224Demo and Salvage BrickSQFT$0.001,600$ - 0
SUBTOTAL$0.00$0.00
Work Inside Controlled Prisons markup10%Work inside USDB or JRCF?No$0.00
Sub-Total$0.00
225Payment & Performance Bond - On Task Order at or over $35,000.00%3%$ - 0$ - 0
226Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $0.00

OPTION YEAR #2

OPTION YEAR #2
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREUNIT PRICEQUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00500$ - 0
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00400$ - 0
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0010$ - 0
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0030$ - 0
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.003,000$ - 0
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0020$ - 0
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0050$ - 0
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00200$ - 0
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$0.0010$ - 0
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$0.0030$ - 0
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$0.00100$ - 0
19New Pervious PCCP SurchageSQYD$0.003,200$ - 0
20Color Staining of PCCPSQYD$0.00750$ - 0
21Concrete Pavement Seal 100 to 1000 Square YardsSQYD$0.00750$ - 0
22Concrete Pavement Seal over 1000 Square YardsSQYD$0.002,000$ - 0
23New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$0.00250$ - 0
24Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$0.00250$ - 0
25New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.00150$ - 0
26Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.00500$ - 0
27New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0020$ - 0
28Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0060$ - 0
29New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0020$ - 0
30Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$0.0060$ - 0
31New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.00150$ - 0
32Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
33New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.005$ - 0
34Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$0.0020$ - 0
35Falsework for Elevated SlabN/AN/ASQFT$0.00200$ - 0
36Concrete Wall03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
37Concrete Footer03 30 00Cast-in-Place ConcreteCUYD$0.0050$ - 0
38New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$0.00150$ - 0
39Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$0.00200$ - 0
40New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$0.005$ - 0
41Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$0.0010$ - 0
42Capillary Water Barrier (4")03 30 00
31 00 00Cast-in-Place Concrete EarthworkSQYD$0.00200$ - 0
43Vaper Barrier03 30 00
31 00 00Cast-in-Place Concrete EarthworkSQYD$0.00200$ - 0
44Flowable Fill ConcreteN/AN/ACUYD$0.0030$ - 0
45Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$0.0012,500$ - 0
46Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$0.00500$ - 0
47Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD$0.00810$ - 0
48Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$0.004,200$ - 0
49Colored Concrete (Concrete Dye Surcharge)N/ANO BIDCUYD$0.00100$ - 0
50Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD$0.00500$ - 0
51Saw Cut Concrete or Asphalt 4" ThickN/AN/ALNFT$0.00900$ - 0
52Saw Cut Concrete or Asphalt 6" ThickN/AN/ALNFT$0.00600$ - 0
53Saw Cut Concrete or Asphalt 8" ThickN/AN/ALNFT$0.00400$ - 0
54Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.003,000$ - 0
55Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.00500$ - 0
56Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$0.0050$ - 0
57New handrail (<30" above ground)05 52 00Metal RailingsLNFT$0.00150$ - 0
58Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT$0.00100$ - 0
59New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$0.00200$ - 0
60Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$0.0050$ - 0
61Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD$0.00100$ - 0
62Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD$0.00250$ - 0
63Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD$0.00600$ - 0
64Common Excavation31 00 00EarthworkCUYD$0.001,500$ - 0
65Common Excavation (Government Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
66Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
67Embankment31 00 00EarthworkCUYD$0.00120$ - 0
68Embankment (Contractor Furnished)31 00 00EarthworkCUYD$0.00250$ - 0
69Salvage Topsoil31 00 00EarthworkSQYD$0.001,000$ - 0
70Topsoil (Government Furnished)31 00 00EarthworkCUYD$0.001,500$ - 0
71Rock Excavation31 00 00EarthworkCUYD$0.00250$ - 0
72Rip-Rap (D50)(4")31 00 00EarthworkCUYD$0.00100$ - 0
73Rip-Rap (D50)(6")31 00 00EarthworkCUYD$0.00100$ - 0
74Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD$0.00150$ - 0
75Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$0.004$ - 0
76Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$0.004$ - 0
77Geotextile Separation Fabric31 05 19GeosyntheticsSQYD$0.003,500$ - 0
78Core Drill (4”) Pavement SamplingN/AN/AEACH$0.0010$ - 0
79In-Situ Soil Sampling and Testing for soil classificationEACH$0.008$ - 0
80Replace Asphalt Incidental to Work32 12 16HMACUFT$0.00100$ - 0
81Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.0012,734$ - 0
82Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.0021,223$ - 0
83Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.0062,451$ - 0
84Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT$0.0083,268$ - 0
85Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT$0.00817$ - 0
86Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT$0.00734$ - 0
87Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT$0.00685$ - 0
88Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
89Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
90Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
91Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$0.0016$ - 0
92Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$0.0016$ - 0
93Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH$0.0031$ - 0
94Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.003$ - 0
95Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.007$ - 0
96Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.0025,338$ - 0
97Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT$0.005,068$ - 0
98Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT$0.00706$ - 0
99Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT$0.00639$ - 0
100Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT$0.00605$ - 0
101Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$0.0011$ - 0
102Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$0.0021$ - 0
103Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$0.006$ - 0
104Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$0.003$ - 0
105Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH$0.006$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .