This document is an amendment to Solicitation W91QF4-24-B-0003 for the Grant Park Renovation project. The amendment adds questions and answers for clarification, extends the solicitation closing date from August 7, 2024 to August 8, 2024 at 2:00 PM CT, and adds a revised drawing dated June 28, 2024. All other terms and conditions remain unchanged.

The solicitation is being conducted using sealed bidding procedures under FAR Part 14. Award will be made to the lowest priced, responsible bidder whose bid conforms to the IFB requirements. Bid submissions must include a bid guarantee, pricing, responsibility documentation such as bonding capacity and financial references, and updated SAM representations and certifications. Bids must be submitted by August 8, 2024 at 2:00 PM CT. The contracting officer will determine contractor responsibility and price reasonableness prior to award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Reason for this amendment is:

a. Add Questions & Answ ers for claritif ication in response to submitted questions from contractors.

b.Extend solicitation from 7 August 2024 to 8 August 2024 at 2:00 PM.

c.Add Revised Draw ing dated 20240628

d. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91QF424B0003

X 9B. DATED (SEE ITEM 11)

03-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2024

CODE

MICC FORT LEAVENWORTH

535 KEARNY AVE.

BLDG 338

FORT LEAVENWORTH KS 66027

W91QF4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QF424B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Aug-2024 02:00 PM to 08-Aug-2024 02:00 PM.

SECTION G - CONTRACT ADMINISTRATION DATA

The following have been modified:

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

See paragrapth (B) below.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Construction – W90F2S

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0490

Issue By DoDAAC W91QF4

Admin DoDAAC** W91QF4

Inspect By DoDAAC W90F2S

Ship To Code W90F2S

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

WAWF Acceptor – Jeff Heim – jeff.heim1.civ@army.mil – 913-684-8924

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Contract Specialist – Chester Serviora – chester.l.serviora.civ@army.mil – 913-684-1643

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO BIDDERS

L.1. OFFER BID, PREPARATION INSTRUCTIONS, AND CONTENT

The following instructions prescribe the format for the bid and describe the approach for the development and presentation of bid data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and evaluation of bids. In the sealed bidding procedures, the price alone will determine the “Apparent Low Bid”; however, the submission of a low bid does not in and of itself determine responsibility of a bidder and therefore it is necessary to require additional information in order that the Contracting Officer may make an award based on the lowest overall priced responsible bidder.

L.2. BID SUBMISSION

a. All bids submitted shall have the Invitation for Bid (IFB) number and Contract Specialist name clearly identified on the outermost container for reference and routing purposes.

b. All questions concerning the IFB shall be submitted to the attention of Mr. Chester L. Serviora via e-mail at chester.l.serviora.civ@army.mil not later than Tuesday July 30th, 10:00 A.M. CST 2024.

c. The sealed Bids are due by Thursday August 8th, 2:00 P.M. CST 2024.

d. Bids shall be submitted prior to the closing date and time to the below listed address:

Mission Installation Contracting Command (MICC) ATTN: Mr. Chester L. Serviora 535 Kearny Avenue, Bldg #338

Fort Leavenworth, KS 66027

e. Bidder’s submission shall be clearly marked IFB W91QF4-24-B-0003 and consist of the below listed documents. While each document may be connected with paper clips or in document holder with dividers for organizational purposes; the information on each document shall be its own separate document and in the organized in the order in a sealed package or document holder as shown below:

TAB # TITLE

(Hard Copy Binders Only)

1 IFB Documents (Signed SF 1442 & SAM Representations & Certifications)

2 Bid Guarantee

3 Section B – Priced CLINs with total including bond

4 Responsibility Documents (Bonding Capacity and Financial Reference)

f. Electronic bids via e-mail or fax will not be accepted. Bids shall be mailed through a commercial/Government carrier or hand carried.

g. Bids may be hand carried however, due to security protocols for base entry, bidders may experience lengthy delays prior entry. Delays caused by traffic congestion or security procedures shall not entitle bidders to additional time to submit their bid. Timely delivery is defined as bid package reaching the possession of the Contracting Officer prior to the date and time of the bid opening. Receipt of bid packages by security personnel or other Government employees does not constitute fulfillment of timely delivery. All bids received in the Contracting Officer’s hands after the date and time set for the receipt of bids shall be considered late.

L.3. SUBMISSIONS OF BID CONTENT

TAB #1 – Invitation for Bid (IFB) Documents:

a. Standard Form (SF) 1442, Solicitation, Offer, and Award (Construction, Alteration or Repair): The bidder is cautioned that the SF 1442 must contain an original signature on the form. The contractor shall acknowledge any amendments to the IFB in accordance with the instructions on the SF 1442. The bidder shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your submission and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

b. Representations, Certifications, and Other Statements of Bidders: Bidder’s Representations and

Certifications must be updated and current through the offeror’s SAM registration which may be obtained at https://www.sam.gov. The bidder shall provide an affirmative statement that the SAM registration is current within 12 months of bid submission and includes NAICS Code 236220, “Commercial and Institutional Building Construction.” It is the bidder’s responsibility to ensure that the information provided in each representation and certification is completed truthfully and completely. Failure of a bidder to complete their online representations and certifications prior to the due date of the IFB will result in their submission being deemed non-responsive and eliminated from consideration of the award.

TAB #2 – Bid Guarantee: The offeror (bidder) shall furnish a hardcopy bid guarantee in the form of a firm commitment, such as a bid bond, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds, or notes of the United States in accordance (reference FAR Clause 52.228-1).

TAB #3 – Bid Sheet Cover Page (Total Amount): This page shall include the total dollar amount of the bid broken up Contract Line-Item Number (CLIN). All filled in CLINs will show the grand total of the bid amount.

TAB #4 – Responsibility Documents: Contractor responsibility documents shall be submitted as shown below.

a. Bonding Capacity: The bidder shall submit information showing maximum available bonding capacity and bonding costs with verification from the Securities or Bonding Company (to be completed by Surety Company and submitted by bidder). The information shall include the bonding limit for a single project, aggregate amount, and current available bonding.

b. Financial Reference: Provide a financial reference from a material and/or equipment supplier that can attest to payment history. Include Company Name of Bidder, Point of Contact (POC) for Business, Phone Number of POC and associated Account Number.

SECTION M - EVALUATION FACTORS FOR AWARD

FACTORS FOR EVALUATION

M.1. BASIS OF AWARD

The Grant Park Restoration shall be awarded utilizing Sealed Bidding Procedures in accordance with Federal Acquisition Regulation (FAR) Part 14, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids; will be most advantageous to the Government, considering only price and the price related factors included in the invitation (FAR Subpart 14.101 e).

M.2. EVALUATION FACTORS FOR AWARD: To be considered for award, a bid must comply in all material respects with the invitation for bids. Such compliance enables bidders to stand on an equal footing and maintain integrity of the sealed bidding system (Subpart 14.301). Once an “Apparent Low Bid” has been selected, the bid submission will be examined to ensure that it completely addresses all of the requirements listed in Section L of the

IFB.

a. The Contracting Officer will determine that a prospective contractor is responsible (Subpart 9.1) and that the prices submitted for the bid are fair and reasonable before awarding the contract. The price analysis techniques in 15.404-1 (b) may be used as guidelines as provided for in Subpart 14.408-2.

b. The Government may determine that an offer is unacceptable if it is determined that the proposed bid is materially unbalanced and/or assembled to give the appearance of reasonableness in an effort to gain award, as defined under FAR Subpart 15.404-1 (g).

c. The otherwise lowest-priced responsible bidder may be required to confirm/validate its price on an element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.

M.3 NON-RESPONSIVE BID SUBMISSIONS

a. All items specified in Section L.3. – Submissions of Bid Content shall be included in the bidder’s Invitation for Bid package to be considered responsive.

b. Bidders initially determined to be the “Apparent Low Bid” of a sealed bid process that possess material omission(s) may cause the bid submission to be rejected as “non-responsive”.

(End of Summary of Changes)