AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. See attached submitted Questions and Answ ers and current Construction Wage Determination.
b. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91QF423B0002
X 9B. DATED (SEE ITEM 11)
09-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jun-2023
CODE
MICC FORT LEAVENWORTH
535 KEARNY AVE.
BLDG 338
FORT LEAVENWORTH KS 66027
W91QF4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91QF423B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
BID NOTES:
Information to Bidders:
a) Bidder’s Price.
i) The Bidder’s Coefficient is a numerical factor (decimal, i.e. 1.25, 1.30, 0.9 and etc).
ii) The price that results from the application of the Coefficient to the Government Estimate will be the Unit Price the Bidder is paid for the service under the corresponding line item. The Bidder shall develop the Coefficient after considering all the costs associated with providing the labor under the most applicable Construction Wage Determination and all materials and equipment to include profit, Overhead with General and Administrative Costs. A nonexclusive list of elements to be considered in developing the coefficient follows:
(1) Cost of required materials
(2) Cost of direct and indirect labor
(3) Contractor’s overhead and profit
(4) Subcontractor’s overhead and profit
(5) Insurance
(6) Employee payroll taxes, insurance and fringe benefits
(7) Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)
(8) All waste and excess material
(9) Equipment costs (10)Testing (11)Clean up (12)Haul-off of non-hazardous waste material from job site to an authorized waste depository.
(13)Mobilization and close out for the total contract and each task order (14)Compliance with environmental laws (overhead {indirect} costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.)
(15)Compliance with protection and safety laws (i.e., safety rails, face and clothing protection, etc.)
(16)Traffic and work site signs and barriers
(17) Project management and supervision
(18) Protection of and/or moving of government property (19)Quality control (20)Office management and equipment (21)The Contractor will supply all needed items and functions (such as forms, curing compound, vibrating tools, etc.) to insure a satisfactory and complete product.
(22)Depreciation of mobile office(s) (23)Interest associated with funding of equipment and payroll
(24) Submittal preparation
(25) Permits, licenses and fees (26)Other risks of doing business (i.e., risk of a lower than expected contract dollar value; risk of a high inflation cost if factors are bid for option years; risk of poor subcontractor performance and re-performance)
iii) Bidder’s Coefficient. As part of its bid, the Bidder may adjust his option year Coefficient to account for projected increases or decreases in the price elements set out above.
2) Award will be made to a single offeror. OFFERORS SHALL INCLUDE Coefficients for each Bid Sheet
(Base Year, Option Year #1 and Option Year #2).
a) The quantities contained on the Bid Sheet represent the Government’s best estimate of its requirements for the period of contract performance. The Contractor acknowledges that the quantity listed in the Bid Sheet at the time of competitive bidding is an estimated quantity; and the awarded contractor will only be paid for the actual quantities ordered, received and accepted by the designated Government Inspector.
The Government reserves the right to order quantities in excess of the stated estimated quantities on the Bid Sheet. However, such quantities will not exceed 100 percent of the total estimated contract dollar amount unless otherwise lawfully modified by a Contracting Officer. It is estimated that the Government’s requirements for any additional quantities of work for each numbered Bid Sheet line item will be in approximately the same proportions that each line item currently bears; however, mathematical precision is not required. The contractor shall perform work on these quantities at the same contract unit price. The Contractor’s lack of receipt of quantities in excess of the estimated quantities specified for a specific Bid Sheet line item shall not entitle the Contractor to an equitable adjustment. Nor does the Government guarantee that the overall quantities ordered shall equal the estimates contained within the Bid Sheet.
b) The word “remove” herein shall be understood to mean “remove and dispose of in a lawful manner off the installation”.
c) The word “provide” herein shall be understood to mean “furnish and install”.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Attch-1 Aspetos
Specifications
25 04-MAY-2023
Attachment 2 Attch-2 Sustainment Management Systems
3 04-MAY-2023
Attachment 3 Attch-3 Material Approval Submittal
1 04-MAY-2023
Attachment 4 Attch-4 Utility Locate Request Form
2 04-MAY-2023
Attachment 5 Attch-5 Debris Recovery Statement (DPW)
1 04-MAY-2023
Attachment 6 Attch-6 Project Specifications.pdf
625 04-MAY-2023
Attachment 7 Attch-7 Bid Sheet Roof Reqmts 2023
4 04-MAY-2023
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Attch-1 Aspetos
Specifications
25 04-MAY-2023
Attachment 2 Attch-2 Sustainment Management Systems
3 04-MAY-2023
Attachment 3 Attch-3 Material Approval Submittal
1 04-MAY-2023
Attachment 4 Attch-4 Utility Locate Request Form
2 04-MAY-2023
Attachment 5 Attch-5 Debris Recovery Statement (DPW)
1 04-MAY-2023
Attachment 6 Attch-6 Project Specifications.pdf
625 04-MAY-2023
Attachment 7 Attch-7 Bid Sheet Roof Reqmts 2023
4 04-MAY-2023
Attachment 8 Attch-8 WD_KS202030053_dtd-
14-APR-2023
7 14-APR-2023
Attachment 9 Attch-9 Q&A- Roof_IFB_23-B-0002
1 12-JUN-2023
(End of Summary of Changes)