W91QF421Q00040001_Amend1_Emergency Cleaning and Restoration RFQ.pdf
PDF 134 KB Posted
- Attached to
- Emergency Cleaning and Restoration
- Solicitation number
- W91QF4-21-Q-0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_PWS-Remediation-Restoration Services 03212020.pdf | ||
| W91QF421Q0004_CSS_Emergency Cleaning and Restoration BPA.pdf | ||
| Attachment 2_2015-5105 Wage Determination.pdf | ||
| Attachment 3 Price Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. This solicitation is amended to provide FAR 52.212-2 as full text.
b. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QF421Q0004
X 9B. DATED (SEE ITEM 11)
13-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Dec-2020
CODE
MICC FORT LEAVENWORTH
535 KEARNY AVE.
BLDG 338
FORT LEAVENWORTH KS 66027
W91QF4 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91QF421Q0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION M - EVALUATION FACTORS FOR AWARD
The following were previously included by reference and are now included by full text:
52.212-2 EVALUATION OF COMMERCIAL ITEMS
(a) Quotes for this acquisition shall be evaluated utilizing Simplified Acquisition Procedures as outlined in FAR subpart 13.106-2. This acquisition will be awarded to an offeror who is responsive to the RFQ and otherwise determined responsible, conforms to the solicitation requirements; and provides the Lowest Priced Technically Acceptable (LPTA) quote. No award shall be made by a Contracting Officer unless the price can be determined as fair and reasonable.
- Responsible Offeror: An offeror may be determined as responsible in accordance with the criteria outlined in FAR Subpart 9.104.
- Responsive Offeror: A quote is determined responsive if it contains all of the elements instructed to be provided under the 52.212-1 Instructions to Offerors.
- Price Quote: The Contracting Officer shall utilize Simplified Acquisition Procedures as stated in FAR Subpart 13.106-2 and/or portions of FAR Part 15 in order to determine fair and reasonable pricing. Further all offerors are notified that quote packages propsed that contain unbalanced pricing are subject for disqualification from award consideration.
(b) Technical Checklist: The offer’s quote will be evaluated against the requirements within the Solicitation to include the PWS and all applicable attachments on an Acceptable or Unacceptable basis. Acceptable ratings are defined as those that meet or exceed the specifications and requirements identified in the solicitation. A quote containing items that exceed requirements do not merit additional consideration for award as no tradeoffs will be considered.
(c) Past Performance: The offer will be evaluated to assess the relative risks associated with the likelihood of success to perform the requirement as indicated by both the offeror’s submitted past performance and that available within the public record. An offeror without Past Performance of a same or similar nature will be considered neutral.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .