W91QF4-21-B-0005_Amend1_MOD_Elevator Maintenance and Repair.pdf

PDF 383 KB Posted

Attached to
Solicitation-Elevator Maintenance and Repair
Solicitation number
W91QF4-21-B-0005
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. Correct time of Site Visit from 1PM Central Time to 10AM Central Time.

b. All other Terms and Conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Dec-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91QF421B0005

X 9B. DATED (SEE ITEM 11)

13-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Dec-2021

CODE

MICC FORT LEAVENWORTH

535 KEARNY AVE.

BLDG 338

FORT LEAVENWORTH KS 66027

W91QF4 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QF421B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit TE 1 - Elevator &

Chairlift Serviced

3 27-MAR-2021

Exhibit TE 3 - iWATCH Army Training for Contractors

12 28-OCT-2021

Exhibit TE 4 - FT LVN Post Map 3 28-OCT-2021 Exhibit TE 2 - Military

Correctional Complex Security & Access

7 28-OCT-2021

Attachment 1 PWS_dtd_20211108 24 08-NOV-2021 Attachment 2 Wage Determination

1986-0497 dtd 20210219

2 19-FEB-2021

Attachment 3 Elevator & Chairlift Service Bid Sheet

9 08-NOV-2021

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit TE 4 - FT LVN Post Map 3 28-OCT-2021 Exhibit TE 2 - Military

Correctional Complex Security & Access

7 28-OCT-2021

Exhibit TE 1 - Elevator & Chairlift Serviced

3 27-MAR-2021

Exhibit TE 3 - iWATCH Army Training for Contractors

12 28-OCT-2021

Attachment 1 PWS_dtd_20211108 24 08-NOV-2021 Attachment 2 Wage Determination

1986-0497 dtd 20210219

2 19-FEB-2021

Attachment 3 Elevator & Chairlift Service Bid Sheet

9 08-NOV-2021

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

52.237-1 SITE VISIT ADDENDUM

W91QF421B0005

A pre-bid conference and site visit will be held on Tuesday, January 11, 2022 at 10AM Central time.

Access to Fort Leavenworth is restricted and requires planning to ensure arrival on time. Contractors need to process through the Visitor Center to obtain access to the installation.

Please email the below Points of Contact NO LATER THAN Thursday, January 6, 2022 at 1PM Central Time to confirm attendance for the site visit:

Larissa Brown, Contract Specialist larissa.a.brown2.civ@army.mil

AND

Adana P. Quanshau, Contracting Officer adana.p.quanshau.civ@army.mil

After the pre-bid conference at the MICC Fort Leavenworth office, contractors will be guided to the work site on Fort Leavenworth, KS 66027. The Contracting Officer’s Representative will provide a walk-through of the site.

All questions shall be sent via email to the Contract Specialist listed above no later than Tuesday, January 18, 2022 at 1:00PM Central time. All questions received will be answered and posted to SAM through an amendment to the Solicitation.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .