W912P823B0028 Amendment 0002.pdf
PDF 417 KB Posted
- Attached to
- Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge Rental No. 3-2023
- Solicitation number
- W91P823B0028
About this file
This is an amendment to a solicitation for a cutterhead dredge rental in the Mississippi River, New Orleans Harbor, and various bar channels located in Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes in Louisiana. The amendment requires that prior to commencement of work in the Upper Barataria Bay Waterway, the contractor must place signage measuring approximately six feet by four feet at the project site to identify the project is being performed under the Bipartisan Infrastructure Law, as directed by the contracting officer. The sign will be provided by the government and must be erected and later removed by the contractor at no additional cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 3-2023, Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes, Louisiana (OM23032) is hereby modified to include the attached information.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0028
X 9B. DATED (SEE ITEM 11)
17-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jul-2023
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P823B0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - SF 30 CONTINUATION
The following have been added by full text:
AMENDMENT 0002
Section 35 20 23.23 19 “Hydraulic Dredging – Upper Barataria Bay Waterway Dredging Region”: After paragraph 1.4 “Aerial Photography Documentation”, add the below paragraph 1.5 “Bipartisan Infrastructure Law Project Signage Requirement”.
1.5. BIPARTISAN INFRASTRUCTURE LAW PROJECT SIGNAGE REQUIREMENT
Executive Order 14052 requires BIL (Bipartisan Infrastructure Law) project signage to be erected in the field for all projects fully or partially funded through BIL PL 117-58 legislation. Therefore, prior to commencement of work in the Upper Barataria Bay Waterway, the Contractor shall place the required signage (one sign, approximate dimensions 6 ft. X 4 ft.) at a location on the project site, as directed by the Contracting Officer or his/her authorized representative. The sign, which will identify that the work is being performed under the Bipartisan Infrastructure Law, will be provided by the Government. The sign coordinator is Timothy Lacoste at 504-862-2663. No separate payment will be made for erection of the sign and all costs in connection therewith will be considered an incidental obligation of the Contractor. Upon completion of the work, the sign shall become the property of the Contractor and shall be removed from the job site.
(End of Summary of Changes)