W912P823B0028 Amendment 0001.pdf
PDF 5 MB Posted
- Attached to
- Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge Rental No. 3-2023
- Solicitation number
- W91P823B0028
About this file
This is a solicitation package for a Mississippi River, New Orleans Harbor and Various Bar Channels cutterhead dredge rental contract. The solicitation seeks bids for a dredge and attendant plant to perform maintenance dredging in Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes in Louisiana. Bids are due by August 3, 2023 at 12:30 PM CST and can be submitted electronically or in person. The contract is expected to last approximately 26 to 41 days depending on the bid lot and includes options to extend the duration. Dredging will take place in the Houma Navigation Canal and Upper Barataria Bay Waterway and involve disposal of dredged materials at designated sites. The minimum production rates required range from 792 to 3,320 cubic yards per hour depending on the size and equipment of the dredge.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Mississippi River, New Orleans Harbor, and Various Bar Channels Cutterhead Dredge No. 3-2023.
Orleans, Jefferson, Terrebonne, Plaquemines, and Lafourche Parishes, Louisiana is hereby amended as follow s:
1. Establish Bid Opening date of Thursday, 3 August 2023 at 1:30 p.m. CST via audio teleconference. See Instructions to Bidders.
2. Make changes to the solicitation as detailed in the follow ing pages.
3. Updated Instructions to Bidders.
4. Update Wage Determination.
Please Note: The Contracting Officer and Contract Specialist w ill begin dow nloading bids at 12:30 PM CST, w hich is the bid receipt cutoff time. All bids received after 12:30 PM CST on Thursday, August 3, 2023 w ill be considered late. For any questions, please contact the Contracting Officer - Veronica Garner Flint, (504) 862-1515 or the Contract Specialist - Melissa A. Vaughn, (504) 862-2762.
1. CONTRACT ID CODE PAGE OF PAGES
1 44
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0028
X 9B. DATED (SEE ITEM 11)
17-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2023
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
1. Cover Sheet, DESCRIPTION AND MAGNITUDE OF WORK: Delete the second sentence of this paragraph and replace with the following sentence: “Work will be performed in the Houma Navigation Canal and the Upper Barataria Bay Waterway.”
2. Standard Form 1442, box 10: In the 3rd paragraph, delete “between $5,000,000.00 and
$10,000,000.0” and replace with “between $10,000,000 and $25,000,000”. In the 4th paragraph, delete the second sentence and replace with the following sentence: “Work will be performed in the Houma Navigation Canal and the Upper Barataria Bay Waterway.”
3. Standard Form 1442, box 11: Delete “5 calendar days” and replace with “20 calendar days”.
4. Standard Form 1442, box 26: Change the address in this box to state: USACE, Lafayette Area Office, 100 Asma Blvd., Suite 300, Lafayette, LA 70508.
5. Project Table of Contents: Delete the below sections:
35 20 23.23 07 Hydraulic Dredging – New Orleans Harbor Dredging Region 35 20 23.23 08 Hydraulic Dredging – Algiers, IHNC, and Harvey Lock Forebays Dredging Region 35 20 23.23 15 Hydraulic Dredging – Bayou Lafourche Dredging Region 35 20 23.23 16
Hydraulic Dredging – Baptiste Collette Bar Channel Dredging Region
Also change the title of Section 35 20 23.23 19 to “Hydraulic Dredging – Upper Barataria Bay Waterway Dredging Region”.
6. Section 00010 “Bid Schedule”: Delete this section in its entirety and replace with the attached Section 00010 “Bid Schedule”.
7. Section 00700, FAR Clause 52.211-10 “Commencement, Prosecution, and Completion of Work
(Apr 1984)”: In the first sentence, delete “5 calendar days” and replace with “20 calendar days”.
8. Section 00800, paragraph 3.1 “Delivery of Plant”, subparagraph a: In the first sentence, delete “120 hours” and replace with “20 calendar days”. In the second sentence, delete “Mississippi River Mile 99 AHP” and replace with “Houma Navigation Canal, Mile 2.5”.
9. Section 01 33 00 Attachment, Submittal Register: For Item Nos. 12, 13, and 14, delete references to 35 20 23.23 15 and 35 20 23.23 16. In the Reviewer column, delete all references to NOAO.
Note: The Lafayette Area Office will be handling this contract.
10. Section 35 20 23.23, paragraph 1.1 “Scope”: In the first sentence of this paragraph, delete “27 inches” and replace with “24 inches”.
11. Section 35 20 23.23, paragraph 1.2.2 “Dredging and Option Dredging Items”: Delete the first sentence and replace with the following sentence: “All costs for a fully operated cutterhead dredge shall be included in the contract unit price per hour in the "Houma Dredging", “Houma Option Dredging”, “Barataria Bay Dredging”, and “Barataria Bay Option Dredging” items on the bidding schedule.”
12. Section 35 20 23.23, paragraph 1.2.2e “70% Pay Time Hours”, subparagraph (2): In the first sentence, delete “or movement of the dredge and attendant plant from the New Orleans Harbor
Dredging Region to the Algiers, IHNC, and Harvey Lock Forebays Dredging Region”.
13. Section 35 20 23.23, paragraph 1.2.3 “Dredge Towing Service Item”, subparagraph a: In the last sentence, delete “or when moving the dredge and attendant plant from the New Orleans Harbor Dredging Region to the Algiers, IHNC, and Harvey Lock Forebays Dredging Region”.
14. Section 35 20 23.23, paragraph 1.3.4 “Distribution of Reports”: In subparagraph (1), delete the paragraph that references the New Orleans Area Office. Note: The Lafayette Area Office will be handling this contract.
15. Section 35 20 23.23, paragraph 2.1.2 “Size and Equipment of Dredge Plant”, subparagraph c: In the first sentence, delete “58 feet” and replace with “30 feet”. In the second sentence, delete “65 feet” and replace with “30 feet”. In the third sentence, delete “325 foot” and replace with “170 foot”.
16. Section 35 20 23.23, paragraph 3.1.4 “Order of Work”: Delete subparagraph a in its entirety and replace with the following:
a. Dredging will be performed in the following order:
(1) Houma Navigation Canal Dredging Region
(2) Upper Barataria Bay Waterway Dredging Region
17. Section 35 20 23.23 Attachment “MVN Form 4267”: Delete the MVN Form 4267 dated Feb
2021 and replace with the attached MVN Form 4267 dated April 2023.
18. Section 35 20 23.23 07 “Hydraulic Dredging – New Orleans Harbor Dredging Region”: Delete this section in its entirety.
19. Section 35 20 23.23 08 “Hydraulic Dredging – Algiers, IHNC, and Harvey Lock Forebays
Dredging Region”: Delete this section in its entirety.
20. Section 35 20 23.23 15 “Hydraulic Dredging – Bayou Lafourche Dredging Region”: Delete this section in its entirety.
21. Section 35 20 23.23 16 “Hydraulic Dredging – Baptiste Collette Bar Channel Dredging
Region”: Delete this section in its entirety.
22. Section 35 20 23.23 18 “Hydraulic Dredging – Houma Navigation Canal Dredging Region”:
Delete this section in its entirety and replace with the attached Section 35 20 23.23 18 “Hydraulic Dredging – Houma Navigation Canal Dredging Region”.
23. Section 35 20 23.23 19 “Hydraulic Dredging – Barataria Bay Waterway Bar Channel Dredging
Region”: Delete this section in its entirety and replace with the attached Section 35 20 23.23 19 “Hydraulic Dredging – Upper Barataria Bay Waterway Dredging Region”.
Miss R, New Orleans Harbor and Various Bar Channels Cutterhead OM23032AMEND
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
1.2 BID FORM NOTES
1.3 BIDDING
1.4 EVALUATION OF BIDS
1.5 CONDITIONS OF CONTRACT AWARD
1.6 BIDDER QUALIFICATIONS
1.7 PRE-AWARD INSPECTION OF PLANT
1.8 OPTION ITEMS
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 00010 Page 1
SECTION 00010
BID SCHEDULE
PART 1 GENERAL
1.1 BIDDING SCHEDULES
SECTION 00010 - BIDDING SCHEDULE
MISSISSIPPI RIVER, NEW ORLEANS HARBOR AND VARIOUS BAR CHANNELS
CUTTERHEAD DREDGE NO. 3-2023
ORLEANS, JEFFERSON, TERREBONNE, PLAQUEMINES, AND LAFOURCHE PARISHES, LA
SOLICITATION NO. W912P823B0028
LOT ONE, 24 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 HOUMA DREDGING 403 HOUR
Option
HOUMA OPTION DREDGING 403 HOUR XXXXXXXX
0004 PREPARATORY WORK FOR
BARATARIA BAY - LOWER
DISPOSAL AREA
1 JOB
0005 PREPARATORY WORK FOR
BARATARIA BAY - UPPER
DISPOSAL AREA
1 JOB
0006 BARATARIA BAY DREDGING 695 HOUR
Option
BARATARIA BAY OPTION
DREDGING
695 HOUR XXXXXXXX
0008 DREDGE TOWING SERVICE 45 MILE
Option
BIRD NESTING PREVENTION
AND AVOIDANCE MEASURES
70 DAY
TOTAL: LOT ONE BID
*SEE BID FORM NOTES FOLLOWING LAST BID LOT
SECTION 00010 Page 2
SECTION 00010 - BIDDING SCHEDULE
MISSISSIPPI RIVER, NEW ORLEANS HARBOR AND VARIOUS BAR CHANNELS
CUTTERHEAD DREDGE NO. 3-2023
ORLEANS, JEFFERSON, TERREBONNE, PLAQUEMINES, AND LAFOURCHE PARISHES, LA
SOLICITATION NO. W912P823B0028
LOT TWO, 24 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITH SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 HOUMA DREDGING 351 HOUR
Option
HOUMA OPTION DREDGING 351 HOUR XXXXXXXX
0004 PREPARATORY WORK FOR
BARATARIA BAY - LOWER
DISPOSAL AREA
1 JOB
0005 PREPARATORY WORK FOR
BARATARIA BAY - UPPER
DISPOSAL AREA
1 JOB
0006 BARATARIA BAY DREDGING 491 HOUR
Option
BARATARIA BAY OPTION
DREDGING
491 HOUR XXXXXXXX
0008 DREDGE TOWING SERVICE 45 MILE
Option
BIRD NESTING PREVENTION
AND AVOIDANCE MEASURES
49 DAY
TOTAL: LOT TWO BID
SECTION 00010 Page 3
MISSISSIPPI RIVER, NEW ORLEANS HARBOR AND VARIOUS BAR CHANNELS
CUTTERHEAD DREDGE NO. 3-2023
ORLEANS, JEFFERSON, TERREBONNE, PLAQUEMINES, AND LAFOURCHE PARISHES, LA
SOLICITATION NO. W912P823B0028
LOT THREE, 27 IN. INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 HOUMA DREDGING 300 HOUR
Option
HOUMA OPTION DREDGING 300 HOUR XXXXXXXX
0004 PREPARATORY WORK FOR
BARATARIA BAY - LOWER
DISPOSAL AREA
1 JOB
0005 PREPARATORY WORK FOR
BARATARIA BAY - UPPER
DISPOSAL AREA
1 JOB
0006 BARATARIA BAY DREDGING 500 HOUR
Option
BARATARIA BAY OPTION
DREDGING
500 HOUR XXXXXXXX
0008 DREDGE TOWING SERVICE 45 MILE
Option
BIRD NESTING PREVENTION
AND AVOIDANCE MEASURES
50 DAY
TOTAL: LOT THREE BID
SECTION 00010 Page 4
MISSISSIPPI RIVER, NEW ORLEANS HARBOR AND VARIOUS BAR CHANNELS
CUTTERHEAD DREDGE NO. 3-2023
ORLEANS, JEFFERSON, TERREBONNE, PLAQUEMINES, AND LAFOURCHE PARISHES, LA
SOLICITATION NO. W912P823B0028
LOT FOUR, 30 IN. OR GREATER INSIDE DIAMETER (ID) PUMP DISCHARGE WITHOUT
SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 HOUMA DREDGING 209 HOUR
Option
HOUMA OPTION DREDGING 209 HOUR XXXXXXXX
0004 PREPARATORY WORK FOR
BARATARIA BAY - LOWER
DISPOSAL AREA
1 JOB
0005 PREPARATORY WORK FOR
BARATARIA BAY - UPPER
DISPOSAL AREA
1 JOB
0006 BARATARIA BAY DREDGING 405 HOUR
Option
BARATARIA BAY OPTION
DREDGING
405 HOUR XXXXXXXX
0008 DREDGE TOWING SERVICE 45 MILE
Option
BIRD NESTING PREVENTION
AND AVOIDANCE MEASURES
41 DAY
TOTAL: LOT FOUR BID
SECTION 00010 Page 5
MISSISSIPPI RIVER, NEW ORLEANS HARBOR AND VARIOUS BAR CHANNELS
CUTTERHEAD DREDGE NO. 3-2023
ORLEANS, JEFFERSON, TERREBONNE, PLAQUEMINES, AND LAFOURCHE PARISHES, LA
SOLICITATION NO. W912P823B0028
LOT FIVE, 30 IN. OR GREATER INSIDE DIAMETER (ID) PUMP DISCHARGE WITH
SUBMERGED PUMP
Bid Item
DESCRIPTION Estimated Quantity
Unit Unit Price
Total Price
0001 MOBILIZATION AND
DEMOBILIZATION
1 JOB
0002 HOUMA DREDGING 165 HOUR
Option
HOUMA OPTION DREDGING 165 HOUR XXXXXXXX
0004 PREPARATORY WORK FOR
BARATARIA BAY - LOWER
DISPOSAL AREA
1 JOB
0005 PREPARATORY WORK FOR
BARATARIA BAY - UPPER
DISPOSAL AREA
1 JOB
0006 BARATARIA BAY DREDGING 325 HOUR
Option
BARATARIA BAY OPTION
DREDGING
325 HOUR XXXXXXXX
0008 DREDGE TOWING SERVICE 45 MILE
Option
BIRD NESTING PREVENTION
AND AVOIDANCE MEASURES
33 DAY
TOTAL: LOT FIVE BID
SECTION 00010 Page 6
1.2 BID FORM NOTES
a. Bidders shall bid on all items including optional items (see "Evaluation of Options" FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
b. Bidders shall use the Item No. 0002 unit price to compute the Option Item No. 0003 total price, and the Item No. 0006 unit price to compute the Option Item No. 0007 total price.
c. Any bid may be rejected if the Contracting Officer or his/her authorized representative determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (see "Rejection of Individual Bids" FAR 14.404-2).
d. THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued after verification of acceptable performance and payment bonds. Within 48 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Administrative Contracting Officer or his/her authorized representative. Physical work cannot start until the Resident Management System is set-up, the Accident Prevention Program and other required submittals have been submitted and approved, and all preliminary meetings called for under the contract have been conducted.
e. RAPID VENDOR PAYMENT: See the following web based instructions for the submission of invoices:
www.mvn.usace.army.mil/Business-With-Us/Contracting/Rapid-Vendor-Payment.aspx
f. The unit "job" is a one-time payment for work performed. "Job" is synonymous with the previously used term "lump sum".
1.3 BIDDING
a. The bidder shall select only one bid lot, determined by the class of dredge intended to be used. Bids which are submitted on an inappropriate bid lot will be declared non-responsive.
b. Bidders shall furnish unit prices for all items listed on the schedule of bid items that require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items but does furnish an extended total or an estimated amount for such items, the Government will deem the unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
ESTIMATED AMOUNT FOR ANY REQUIRED ITEM, THE BID WILL BE DECLARED
NON-RESPONSIVE.
1.4 EVALUATION OF BIDS
a. To provide fair competition between dredges of dissimilar sizes and production rates, the hourly dredging quantities have been determined based on the estimated quantity of shoal material to be removed and the nominal production rate of the dredge in each bid lot. The production
SECTION 00010 Page 7 rates shown in the chart in the paragraph entitled "Minimum Production Rate Requirements" located in the Dredging Region Section(s) were used to make this determination.
b. The nominal dredge production rates listed in this solicitation were conservatively estimated based on an average "Standard" cross-sectional quantity of material for this solicitation's dredging regions, which have variable and dynamic shoaling conditions. It is the bidder's responsibility to make its own assessment of the actual dredging conditions in order to prepare a bid for this work.
c. Award will be made to that responsible bidder presenting the lowest priced responsive bid in response to this solicitation, regardless of the Bid Lot used.
d. The hourly quantities for the Dredging and Option Dredging Items shown on the bid lots are 100% pay time hours. The actual calendar duration of the contract may vary as a result of fractional pay time.
Refer to Section 35 20 23.23, paragraph entitled "Dredging and Option Dredging Items", for additional information.
1.5 CONDITIONS OF CONTRACT AWARD
a. Award will be made as a whole to one bidder. The dredge and attendant plant offered in the bidding schedule shall be complete with full operating personnel and in operating status for the contract period. EM 385-1-1, Section 19, "Floating Plant and Marine Activities" shall be complied with at all times. NOTE: All work under these specifications shall be performed in accordance with the provisions of EM 385-1-1 "Army Corps of Engineers Safety and Health Requirements Manual", latest edition.
b. The Government may award the contract at the total bid price, comprised of the base items and option item(s); however, the Government is not obligated to exercise any option item(s).
c. The number of hours stated in the bidding schedule is an estimated quantity. The dredge and attendant plant will be retained for an approximate number of days shown in the table below starting no later than 20 calendar days after issuance of the Notice to Proceed.
APPROXIMATE DREDGE
CONTRACT DURATION
Bid Lot Approx. Number of Days for Item 0002
Approx. Number of Days for
Option Item 0003
Approx. Number of Days for Item 0006
Approx. Number of Days for
Option Item 0007
1 26 26 44 44
2 23 23 35 35
3 21 21 35 35
4 17 17 31 31
5 15 15 27 27
SECTION 00010 Page 8
The time required for completion of the contract shall be established as the sum of the calendar days listed in the columns entitled "Approx.
Number of Days for Item 0002" and "Approx. Number of Days for Item 0006" for the applicable bid lot. In the event all Option Items are fully exercised under the terms of the contract, the time required for completion of the contract shall be extended by the sum of the calendar days listed in the columns entitled "Approx. Number of Days for Option Item 0003" and "Approx. Number of Days for Option Item 0007" for the applicable bid lot. In the event an Option Item is partially exercised, the contract completion date shall be extended using the following formula:
[(partial option hours exercised)/(option hours listed in bid schedule for applicable bid lot)] x calendar days listed in the column entitled "Approx. Number of Contract Days for Option Item 0003" (or whichever Option Item is applicable) for the applicable bid lot
d. The bidder shall be capable of providing for assignment of the dredge and all attendant plant, complete and in full operating condition in all respects, and to commence dredging no later than 20 calendar days after issuance of the Notice to Proceed.
1.6 BIDDER QUALIFICATIONS
a. Before the Government will award a contract based on this solicitation, the apparent low bidder shall establish that it is responsible and entitled to award of the contract, by certifying that its dredge meets the appropriate production rate for the dredging region, as listed in the chart in the paragraph entitled "Minimum Production Rate Requirements" located in the Dredging Region Section(s). The dredge must have performed at, or above, the listed production rate for at least 85 percent of the total contract duration, on any contracts that are used to prove plant capability, within three years prior to the bid opening date of this solicitation. Failure to establish the dredge's capability to meet the required production rate will result in a finding of non-responsibility.
b. A bidder may be rejected as non-responsible if it cannot show the necessary capital, experience, or equipment needed to perform the work described under this solicitation (see "Responsible Prospective Contractors" FAR Subpart 9.1). The bidder must also show that the dredge and attendant plant are not already obligated for the performance of other work which would delay commencement, performance, and completion of the solicited work, and must show that delivery of the dredge and attendant plant to the site of work can be made within the time allowed in the specifications.
c. Bidders must register in the System for Award Management (SAM) database in accordance with FAR 52.204-7-OCT 2018.
1.7 PRE-AWARD INSPECTION OF PLANT
a. The apparent low bidder shall make the dredge and attendant plant available for inspection, to determine compliance with these specifications, as soon as practicable after bids are opened, and prior to contract award. If deficiencies are found during the inspection, the bidder will be notified in writing, which may be transmitted by email or facsimile. Upon receipt of such notice, the bidder shall correct all deficiencies at least two calendar days in advance of the
SECTION 00010 Page 9 projected contract award date.
b. Two calendar days before the projected award date, or upon notification by the bidder that the deficiencies have been corrected, a Government representative will re-inspect the dredge and attendant plant. If at that time the dredge and attendant plant do not meet the requirements of these specifications, the bidder will be rejected as non-responsible.
c. The Government may choose to waive the pre-award inspection if the projected contract award date is less than five calendar days after the bid opening date. Waiver of the pre-award inspection does not relieve the bidder from the requirement to provide a dredge and attendant plant in full compliance with the specifications.
1.8 OPTION ITEMS
a. The Government may require the delivery of, in whole or part, any Option Items. The Government may exercise an Option Item by written notice to the Contractor. If the Government activates the Option Item, the activation will occur while the Contractor's equipment is in the work vicinity as described in the applicable Dredging Region Section(s). If Option Dredging Item work is exercised, it shall be performed as a continuance of Dredging Item work, which shall be activated first.
b. No additional mobilization/demobilization will be paid to the Contractor for Option Item work performed within the work region. The Contractor shall commence performance of optional work no more than three calendar days after the time the Contractor receives the Government's Notice to Proceed with the optional work.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 00010 Page 10
FROM:
NAME AND TYPE [ ]
TYPE (walking, carriage, wires): [ ]
DREDGE PUMP, HP CUTTER, HP DIPPER OR BUCKET
OTHER TOTAL SHIFTS PER DAY
AUTHORIZED
DIMENSIONS
> WIDTH OF SWING
> WIDTH OF SWING
C/L STATIONS > WIDTH OF SWING
GMS/liter GMS/liter
TYPE
TYPE
MM TYPE
AMOUNT
AVERAGE WIDTH OF CUT (SWING) FEET
TOTAL ADVANCE THIS PERIOD FEET
TOTAL ADVANCE PREVIOUS TO THIS PERIOD FEET BOOSTER (in line) :
TOTAL ADVANCE TO DATE FEET
TOTAL LENGTH OF DISCHARGE PIPE: *SEE REVERSE SIDE HANDLING PIPE LINES HPL
AVERAGE LIFT FEET HANDLING ANCHOR LINES HAL
AVERAGE PUMP SPEED RPM CLEARING PUMP AND PIPE LINE CPPL
AVERAGE GROSS CY'S DREDGED PER PUMP HOUR CY/HR CLEARING CUTTER OR SUCTION HEAD CCSH
AVERAGE NET CY'S DREDGED PER PUMP HOUR CY/HR WAITING FOR SCOWS WFS
LF/HR TO AND FROM WHARF OR ANCHORAGE TFWA
CHANGING LOCATION OF PLANT ON JOB CLPJ
CUBIC YARDS REMOVED LOSS DUE TO OPPOSING NATURAL ELEMENTS LDNE
LOSS DUE TO PASSING VESSELS WVP
(1) CREDITED (pay place) SHORE LINE AND SHORE WORK SLSW
(2) GROSS (computed amount) WAITING FOR BOOSTER WFB
MINOR OPER. REPAIRS (explain in remarks) MOR
(1) CREDITED (pay place) WAITING FOR ATTENDANT PLANT WAP
(2) GROSS (computed amount) PREPARATION AND MAKING UP TOW PMUT
TRANSFERRING PLANT BETWEEN WORKS TPBW
(1) CREDITED (pay place) LAY TIME OFF SHIFT AND SATURDAYS LTOSS
(2) GROSS (computed amount) SUNDAYS AND HOLIDAYS SH
FIRE DRILL FD
MISCELLANEOUS (explain in remarks) MISC
TOTAL NON-EFFECTIVE WORKING TIME
DREDGE
TENDER #1
TENDER #2
SKIFF
CREW PCT OF TOTAL TIME IN PERIOD
SURVEY
BARGES
CRANE BARGE MAJOR REPAIRS AND ALTERATIONS
IDLER BARGE CESSATION
CUTTER-TYPE COLLISIONS
SPUD LENGTH MISCELLANEOUS (explain in remarks)
NUMBER OF TOTAL LOST TIME
INSPECTIONS PERCENTAGE OF TOTAL TIME
( ) NO
TOTAL TIME IN PERIOD
( ) YES
Version: April 2023 (Signature and Remarks required on reverse side)
DATE OR PERIOD
DREDGE TYPE:
cu. yds. cap.
BUCKET
CUTTERHEAD
DIPPER
DUSTPAN
RANGES - RT, CL, LT
HIRED LABOR
TOTAL NUMBER OF DAYS ON
WHICH WORK WAS DONE:
(not chargeable to cost of work)
GRAIN SIZE
MINIMUM
GAGE LOCATION
MAXIMUM
PROJECT
AND
ASSIGNMENT
DEPTHWIDTH
DUSTPAN SUCTION PIPE JET, HP
RANGES - RT, CL, LT
RANGES - RT, CL, LT
THRU: TO:
inch inside diameter discharge
REPORT NO.
SHOREDREDGE
WORK SCHEDULE
COMPLETION
CHARACTER
OF
MATERIAL
(leave blank if grab samples aren't taken)
(chargeable to cost of work)
CONTRACT OR
ORDER
NUMBER
WEATHER
CONDITION miles
AVERAGE
DEPTH
RIVER
STAGE
MM
NUMBER
BEFORE DREDGING
VISUAL MATERIAL
CLASSIFICATION
CHANNEL
CONDITION
ABSOLUTE DENSITY VOIDS RATIOIN PLACE DENSITY
ITEM
NO. OF TIMES
MVN FORM 4267
AVERAGE LINEAR FOOT PER HOUR
CONTRACT USE
ONLY
TOTAL EFFECTIVE AND NON-EFFECTIVE
ITEM
BY DIV & OCE PERSONNEL
ATTENDANT PLANT
HOURS
(If "YES", explain under remarks on back)
BY DISTRICT PERSONNEL
HAS ANYTHING DEVELOPED WHICH MIGHT LEAD TO A
CHANGE ORDER OR CLAIM?
TIME
NAME OR NUMBER
AMOUNT PREVIOUSLY REPORTED:
TOTAL AMOUNT DREDGED TO DATE:
PCT. OF NON-EFFECTIVE TIME
LOST TIME
REPORTS CONTROL SYMBOL
ENGCW-0-13
DAYS PER WEEK
PROPULSION
REPORT OF OPERATIONS -- PIPELINE, DIPPER OR BUCKET DREDGES
DAILY[ ] [ ] [ ]NEW WORK
MAINTE-
NANCE [ ] [ ] ANNUAL
CHARACTER OF
REPORT
DREDGE
IDLER BARGE USED (Yes/No):
PUMP
DISCHARGE
SIZE
DREDGE ADVANCE MECHANISM
PUMPING OR DREDGING
PCT. OF EFFECTIVE TIME
AFTER DREDGING
VISIBILITY
UNIT QUANTITY
(chargeable to cost of work)
AMOUNT DREDGED THIS PERIOD:
DISTRIBUTION OF TIMEWORK PERFORMED
EFFECTIVE WORKING TIME
NON-EFFECTIVE WORKING TIME
(chargeable to cost of work)
WIND (maximum velocity & direction)
BEFORE DREDGING
CONTRACTOR
AFTER DREDGING
AMOUNT
MINIMUM SOUNDING
OVERDEPTH
NUMBER OF
CREWMEMBERS
TIMETIME
(clear, cloudy, rain, snow, and fog)
LOCATION
(INCLUDE STATIONS
NUMBERS)
Section 35 20 23.23 ATTACHMENT
MVN Form 4267
FLOATING Marsh Trackhoes-30' Skidder Barges
PONTOONS Marsh Trackhoes-60'
Metal Metal Metal Marsh Buggies Breast
PVC PVC PVC Dozers Head
Flexifloat Other Other Front End Loaders Line
TOTAL LF Air Boats Other
ATV's
ELBOWS Stiff Y-Valves
Swivel Spreaders
SHORE DATE DATE TOTAL TOTAL TOTAL VISUAL MATERIAL
CONNECTION START FINISH GROSS CYS CREDITED CYS ACREAGE CLASSIFICATION
100% 70% 35% 0% 0% - MISC (Mob) TOTAL
BASE HRS
OPTION HRS
PREVIOUS HRS
TOTAL HRS
GAL.
GAL.
LBS.
GAL.
NAME: NAME: NAME:
TITLE: TITLE: TITLE:
Version: April 2023
INSIDE DIAMETER OF DISHARGE PIPE, IN
MVN FORM 4267
ANCHORS
DISPOSAL AREA SUMMARY
COORDINATE
TIME BREAKDOWN
TODAY QUANTITY PREVIOUS QUANTITY
OPERATING SUPPLIES
QUANTITY TO DATE
LUBRICANT (oil)
RECOMMENDED BY (Name, title, and signature) APPROVED BY (Name, title, and signature)
REMARKS:
SHORE AMOUNTSUBMERGEDAMOUNT AMOUNT
REMARKS
LUBRICANT (grease)
SUMMARY OF DREDGE DISCHARGE PIPELINE, DISPOSAL AREAS and TIME BREAKDOWN
SUBMITTEDED BY (Name, title, and signature)
ATTENDANT PLANT
DREDGE DISCHARGE PIPELINE DISPOSAL AREA EQUIPMENT ANCHORING SYSTEMS
NAME/LOCATION
FUEL (diesel)
WATER
TOTAL COMBINED
DISCHARGE, LF
Section 35 20 23.23 ATTACHMENT
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23.23 18
HYDRAULIC DREDGING - HOUMA NAVIGATION CANAL DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.2.1 Non-Standard Dredging Conditions
1.3 EXISTING STRUCTURES OR UTILITIES
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 DREDGING
3.1.1 Dredging Region
3.1.1.1 Houma Navigation Canal
3.1.2 Dredge Discharge Pipeline
3.1.3 Before and After Disposal Surveys
3.1.4 Before and After Dredging Cross Sections
3.1.5 Survey Data
3.1.6 Previous Dredging Contracts
3.2 MINIMUM PRODUCTION RATE REQUIREMENTS
3.3 HORIZONTAL AND VERTICAL CONTROL POINTS
ATTACHMENTS:
Houma Navigation Canal, Terrebonne Bay Maintenance Dredging Plates
SECTION 35 20 23.23 18 Page 1
SECTION 35 20 23.23 18
HYDRAULIC DREDGING - HOUMA NAVIGATION CANAL DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
This section details specific requirements, which are in addition to the general requirements set forth in the specifications, for the Houma Navigation Canal Dredging Region. The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all work required for dredging in the specified dredging region, except for those measures set forth in other technical portions of the specifications.
1.2 MEASUREMENT AND PAYMENT
All costs for the work covered under this section shall be included in the contract unit price per hour in the "Houma Dredging" and "Houma Option Dredging" items on the bidding schedule.
1.2.1 Non-Standard Dredging Conditions
The following conditions will be considered non-standard:
a. Those conditions described in Section 35 20 23.23, paragraph entitled "Dredging in Non-Standard Reaches and Conditions".
b. Any locations within Houma Navigation Canal where the dredging template yields less than a 150 foot swing width.
1.3 EXISTING STRUCTURES OR UTILITIES
The structures or utilities listed below are known to be located within the dredging region.
Structure or Utility
Owner Information Approximate C/L Station
Elevation (feet MLG)
2.5-inch Oil Pipeline 2.5-inch Gas Pipeline 3-inch Gas Pipeline
Chevron 100 Northpark Blvd Covington, LA 70433
Mr. Ryan Rivault 985-714-1875 (Cell) 985-773-1754 (Office) ryan.rivault@chevron.com
Ms. Erin Dunaway 985-773-6554 (Office) erin.dunaway@chevron.com
1397+20 -23.0
SECTION 35 20 23.23 18 Page 2
Structure or Utility
Owner Information Approximate C/L Station
Elevation (feet MLG)
8-inch Pipeline (abandoned in-place)
Talos Energy (Stone Energy) 3861 Ambassador Caffery Pkwy Suite 200 Lafayette, LA 70503
Mr. Codi Fontenot 337-521-2162 (Office) 337-258-3763 (Cell) codi.fontenot@talosenergy.com
333 Clay St. #3300 Houston, TX 77002 713-328-3000
1494+99 -30.0
8-inch Pipeline 16-inch Pipeline 20-inch Pipeline
Hilcorp 1111 Travis St.
Houston, TX 77002
Mr. Bryan Beresik 346-237-2060 bberesik@hilcorp.com
Mr. Chad Terrebonne 985-594-1306 cterrebonne@hilcorp.com
1614+84 1615+35 1615+87
-26.0 -26.0 -25.0
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 DREDGING
3.1.1 Dredging Region
3.1.1.1 Houma Navigation Canal
a. The authorized dimensions for Houma Navigation Canal are -16 feet Mean Lower Low Water (MLLW) by 150 feet bottom width from approximate Mile 10.5 (Station 1397+97) to Mile 2.5 (Station 1817+50). The Contracting Officer or his/her authorized representative may issue dredging assignments for all or portions of this dredging region. Each dredging assignment will define the dredging template to be dredged by the Contractor. The dredging template will include the swing width, the side slope, and the specified elevation. The specified elevation in the dredging assignment will not exceed 3 feet below the authorized elevation and may be specified above the authorized dimensions when determined to be beneficial to the Government.
Dredging assignments are expected to fall between approximate Mile 10.5 and Mile 2.5.
b. Disposal of dredged material shall be at the Government's direction.
Approved disposal sites are the single point discharge (SPD) location at Mile 7.9 and the open water disposal site approximately 1500 feet west of
SECTION 35 20 23.23 18 Page 3 the channel centerline, as shown on the Houma Navigation Canal, Terrebonne Bay Maintenance Dredging Plates.
3.1.2 Dredge Discharge Pipeline
The Contractor shall provide 16,000 feet of serviceable floating or submerged pipeline and all associated equipment as directed by the Government. See Section 35 20 23.23, paragraph entitled "Dredge Discharge Pipeline", for additional information regarding pipeline requirements.
3.1.3 Before and After Disposal Surveys
The Contractor shall perform before and after disposal surveys at each disposal discharge location. The "Before" discharge surveys shall be taken as close as possible to the start of discharge operations and shall cover the anticipated limits of disposal. The "After" discharge surveys shall be taken as soon as possible after discharge operations have ceased and shall adequately cover the entire limits of disposal.
All surveys shall be tied/referenced to the centerline of the channel. All notes resulting from these surveys shall be presented to the Contracting Officer's Representative. The before and after disposal surveys shall be furnished to the Government in CAD and PDF formats including plan and section views. Survey data shall also be provided in ASCII XYZ format (easting, northing, elevation). All survey data shall be referenced to NAD83, State Plane Coordinates, LA South 1702 horizontally and MLLW vertically. All disposal surveys shall be submitted and accepted before final payment is made to the Contractor. In addition, the before and after disposal surveys shall be submitted to Mr. Jeff Corbino electronically at Jeffrey.M.Corbino@usace.army.mil.
3.1.4 Before and After Dredging Cross Sections
In addition to the requirements in Section 35 01 50.73, paragraph entitled "Before and After Dredging Cross Sections", the before and after dredging cross sections of the channel shall be taken at approximately 200-foot intervals along the channel, as well as at all utility crossings and at all P.C.'s, P.T.'s, P.I.'s, and P.O.T.'s.
3.1.5 Survey Data
In addition to the requirements in Section 35 01 50.73, paragraph entitled "Survey Data", the Contractor shall promptly plot the channel cross sections on a scale of 1 inch = 30 feet horizontal and 1 inch = 5 feet vertical.
3.1.6 Previous Dredging Contracts
Dredging occurs annually or near annually within segments of this dredging region. Contact the contract personnel listed at the beginning of the specifications for information regarding previous dredging contracts.
3.2 MINIMUM PRODUCTION RATE REQUIREMENTS
a. The following charts show the minimum production rates the dredge must perform at as specified in Section 35 20 23.23, paragraph entitled "Required Production and Dredging Tolerances".
SECTION 35 20 23.23 18 Page 4
HOUMA NAVIGATION CANAL MINIMUM PRODUCTION RATE TABLE #1
(4w+16s)/27 < cross-sectional quantity < (6.5w+42.25s)/27
Size of Dredge Pump Discharge (inches)
Submerged Pump
Minimum Output (cy/hr)
24 No 1087
24 Yes 1250
27 No 1460
30 or greater No 2099
30 or greater Yes 2656
HOUMA NAVIGATION CANAL MINIMUM PRODUCTION RATE TABLE #2
Cross-sectional quantity > (6.5w+42.25s)/27
Size of Dredge Pump Discharge (inches)
Submerged Pump
Minimum Output (cy/hr)
24 No 1359
24 Yes 1562
27 No 1825
30 or greater No 2624
30 or greater Yes 3320
b. If a dredge's submerged pump becomes inoperable and the Contractor elects to continue dredging, then the Contractor will be allowed to operate without the submerged pump provided the specifications have a bid lot for that size dredge without a submerged pump and provided the dredge meets the minimum production rate shown on the chart above and as specified in Section 35 20 23.23, paragraph entitled "Required Production and Dredging Tolerances". For a dredge with an inoperable submerged pump, the new unit price per hour for "Houma Dredging" and "Houma Option Dredging" shall be computed as follows:
New unit price per hour = (Original Base Item Estimated Quantity)x(Original Base Item Unit Price) Estimated Quantity From Base Item Bid Schedule of Applicable Bid Lot for the Same Size Dredge Without a Submerged Pump
The remaining hours, if any, on the Basic Payment Items will be prorated so that payments available to the Contractor under Option Payment Items will be unchanged. Option dredging payment hours will also be prorated
SECTION 35 20 23.23 18 Page 5 separately, so that the total payments available to the Contractor for exercised options remain unchanged.
3.3 HORIZONTAL AND VERTICAL CONTROL POINTS
Horizontal and vertical control points are shown on the plates attached at the end of this section.
SECTION 35 20 23.23 18 Page 6
INSIDE THE PLAN AREA, POLYCONIC PROJECTION - 1983 NORTH
AMERICAN DATUM IS SHOWN BY SOLID TICKS AND LAMBERT
CONFORMAL CONIC PROJECTION GRID IS SHOWN BY DASHED TICKS.
SEE PLATE 4.
1. FOR GENERAL NOTES,
NOTES:
BOTTOM EDGE OF CUT
BOTTOM EDGE OF CUT
CURVE DATAPIPELINE EL. -30.0' M.L.G.
C O
A S T
A L
P L
C
O M P A
N Y
(E
L
P A S
O
C
O R P O R
A T
IO
N
P R
O P O S E
D
C R
U D E
O
IL
P L
P R
O P O S E
D
B
U R
IA
L
P T
H
A C R
O S S
P E T
IT
C
A
IL
L O
U
(M
IN
IM
U M
B E
N E
A
M U
D
L
IN
E
= 18°40'25"
D = 00°28'46"
T = 1965.13'
R = 11952.10'
L = 3895.408'
T a m b o ur C ut o f f
M I L
E
.5
2-1/2" OIL LINE
2-1/2" & 3" GAS LINES
EL. -23.0' M.L.G.
CHEVRON
2-1/2" GAS LINES
3" GAS LINE
EL. -23.0' M.L.G.
CHEVRON
WELL
CHEVRON SLIP AND
BAY
LONG
W
ELSH
M
IL
E
CL CHANNEL
HOUMA NAVIGATION CANAL
P E
T I T
COUTEAU
CURVE DATA
P E
T I T
BAY
C A I L
L O
U
Az. 329° 11' 12.00" ( Geodetic )
SOUTHERN NATURAL GAS
6" PIPELINE EL -27.0' M.L.G.
M
IL
E
TENN. GAS P/L CO. 24"
PIPELINE EL. -30.0' M.L.G.
TENN. GAS P/L CO. 24"
PIPELINE EL. -24.0' M.L.G.
TENN. GAS P/L CO. 24"
PIPELINE EL. -20.0' M.L.G.
PLAINS PIPELINE, LP
PIPELINE EL. -50.0' MLG
WAITING ON AS-BUILT
P .T .1
.2
X ,4
,7
Y ,6
= 18°40'25"
D = 00°28'46"
T = 1965.13'
R = 11952.10'
L = 3895.408'
P .C
.8
P .T
.2
X
,4
,6
Y
,1
B A
Y O
U
C O
A S T
A L
P L
C
O M P A
N Y
(E
L
P A S
O
C
O R P O R
A T
IO
N
P R
O P O S E
D
C R
U
P L
P R
O P O S E
D
B
U R
IA
P
R
O S S
P E T
IT
C
A
IL
L O
U
(M
IN
IM
U M
B E
N E
A
U
D
L
IN
E
Coco drie
Little
BUMP PHOTOGRAPHY FLOWN IN 2022.
N
B A
Y
NEW ORLEANS DISTRICT
D
2 3
C
4 5
A
B
®of Engineers
US Army Corps
PLATE
E
R R
E B
O N
N E
P A
R
IS
H L
A
C /L
S T
A
M
IL
E
.5
T
O C
/L S
T A
M
IL
E
.5
N
O N
-C O
N T
IN
U
O U
S P
L A
N
H O
U M
A N
A V
IG
A
T
IO
N C
A N
A L
T
E R
R E
B O
N N
E B
A Y
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
Az. 309° 46' (Geo detic)
T E R R E B O N N E
P A R I S H, L A.
T E R R E B O N N E
P A R I S H, L A.
O a k
B a y o u
B a yo u
C
S
A
P .T
L A
P P
R O
X
L I
M I
F
R
E D
G I N
P
A
T E
M A
T
P R
O
A P
P R
O
BOTTOM EDGE OF CUT
BOTTOM EDGE OF CUT
T = 2078.47'R = 7620.91'L = 4058.24'
D = 00°45'07"
= 30°30'39"
INSIDE THE PLAN AREA, POLYCONIC PROJECTION - 1983 NORTH
AMERICAN DATUM IS SHOWN BY SOLID TICKS AND LAMBERT
CONFORMAL CONIC PROJECTION GRID IS SHOWN BY DASHED TICKS.
INSIDE THE PLAN AREA, POLYCONIC PROJECTION - 1983 NORTH
AMERICAN DATUM IS SHOWN BY SOLID TICKS AND LAMBERT
CONFORMAL CONIC PROJECTION GRID IS SHOWN BY DASHED TICKS.
BUMP PHOTOGRAPHY FLOWN IN 2022.
M I L
E
REAR LIGHT
Y= 258,427
Az. 309° 46' ( Ge odetic
CONTAINMENT
DIKEEXISTING
RANGE "A"
X= 3,508,674
T a m b o ur C ut o f f
REAR LIGHT
Y= 258,427
#20
BUOY
CONTAINMENT
DIKE
BAY CHALAND ISLAND
EXISTING
M I L
E
M I L
E
RANGE "A"
X= 3,508,674
HOUMA NAVIGATION CANAL
TALOS ENERGY RANGE "B"
FRONT LIGHT
BUOY #18
RANGE "A"X= 3,511,098
FRONT LIGHTRANGE "B"
FRONT LIGHT
BN #19
BN #17
M I L
E
RANGE "A"
Y= 251,689
X= 3,511,866Y= 250,562
D I S
P O
S A
L
I N
N
M
W
ELSH
X=3507617
Y=252118 S T
A .3
L breach breach breach breach breach breach
8" PIPELINE EL. -30' M.L.G.
breach breach breach breach breach breach
C/L STA 1494+99 (ABANDONED)
breach breach emergent mtl.
X= 3,509,76 breach breach
N
1552+69.80 C/
LP.C.
B A
Y
NEW ORLEANS DISTRICT
D
2 3
C
4 5
A
B
E
R R
E B
O N
N E
P A
R
IS
H L
A
C /L
S T
A
M
IL
E
.5
T
O C
/L S
T A
M
IL
E
.5
N
O N
-C O
N T
IN
U
O U
S P
L A
N
H O
U M
A N
A V
IG
A
T
IO
N C
A N
A L
T
E R
R E
B O
N N
E B
A Y
M A
IN
T
E N
A N
C E
D R
E D
G
Y= 252,302
1. FOR GENERAL NOTES, SEE PLATE 4.
NOTES:
M A
T
N
E
P L
A T
E
M A
T
N
E P
L A
T E
CURVE DATA
SPD MI. 7.9
INSIDE THE PLAN AREA, POLYCONIC PROJECTION - 1983 NORTH
AMERICAN DATUM IS SHOWN BY SOLID TICKS AND LAMBERT
CONFORMAL CONIC PROJECTION GRID IS SHOWN BY DASHED TICKS.
BUMP PHOTOGRAPHY FLOWN IN 2022.
A P
P R
O
A P
P R
O X
NOTES:NOTES:
1. FOR GENERAL NOTES, SEE PLATE 4.
BOTTOM EDGE OF CUT
BOTTOM EDGE OF CUT
BOTTOM EDGE OF CUT BOTTOM EDGE OF CUT
M I L
E
D I S
P O
S A
L I N
N
M
TERREBONNE BAY
Az. 340° 12' ( Geodetic )
TERREBONNE BAY
Y= 249 ,032
REAR LIGHT
RANGE "B"
X= 3,5 11,098
BN #17
M I L
E
Y= 249 ,032
REAR LIGHT
RANGE "B"
X= 3,514,958
HOUMA NAVIGATION CANAL
Y= 251 ,689
Y= 25 0,562
Y= 248,034
20" PIPELINE EL. -25.0' M.L.G.
16" PIPELINE EL. -26.0' M.L.G.
8" PIPELINE EL. -26.0' M.L.G.
Az. 340° 12' ( Geodetic )
I L
E
INNER LIMIT OF DISPOSAL
Az. 340° 12' ( Geodetic )
M I L
E
S T
A .3
L
N
HILCORP
NEW ORLEANS DISTRICT
D
2 3
C
4 5
A
B
E
R R
E B
O N
N E
P A
R
IS
H L
A
C /L
S T
A
M
IL
E
.5
T
O C
/L S
T A
M
IL
E
.5
N
O N
-C O
N T
IN
U
O U
S P
L A
N
H O
U M
A N
A V
IG
A
T
IO
N C
A N
A L
T
E R
R E
B O
N N
E B
A Y
M A
IN
T
E N
A N
C E
D R
E D
G
Az. 340°12'(Geodetic)
A
T
A
T E
M A
T
N
EP
L
A T
E
X= 3,5 12,08
61593+ 28.04
P.T.
X= 3,5 12,08
DISTRICT, ATCHAFALAYA RIVER & FLOODWAY, FOR HYDROGRAPH DATA.
CONTRACT. FOR GAGES 76305 & 88450, REFER TO WWW.RIVERGAGES.COM, NEW ORLEANS
THESE GAGES SHALL BE USED TO ESTABLISH VERTICAL CONTROL FOR THIS
(ADD 0.22' TO ADJUST TO MLLW)
0.0' GAGE DATUM = -0.18' NAVD88 (OPUS) = 0.22' MLLW (2012-2016) = 1.22' MLG
GAGE COORDINATES: N 29 11 13.3, W 90 36 33.6
FRONT RANGE (GAGE ID = 88455) IS A STAFF GAGE SET ON WEST SIDE OF USCG TOWER.
(ADD 0.51' TO ADJUST TO MLLW)
0.0' GAGE DATUM = 0.11' NAVD88 (OPUS) = 0.51' MLLW (2012-2016) = 1.51' MLG
GAGE COORDINATES: N 29 05 29.00, W 90 32 18.00
SIDE OF TIMBALIER ISLAND.
TIMBALIER ISLAND (GAGE ID = 88450) IS A STAFF GAGE ATTACHED TO DOCK ON BAY
(ADD (-)0.12' TO ADJUST TO MLLW)
0.0' GAGE DATUM = -0.52' NAVD88 (OPUS) = -0.12' MLLW (2012-2016) = 0.88' MLG
GAGE COORDINATES: N 29 15 15.30, W 90 39 48.70
COCODRIE BAYOU AT THE END OF HWY. 56 AT COCODRIE, LA 500 FEET WEST OF HWY END.
TO THE LOUISIANA LAND AND EXPLORATION BOAT DOCK ON THE NORTH BANK OF LITTLE
BAYOU PETIT CAILLOU AT COCODRIE (GAGE ID = 76305) IS A STAFF GAGE ATTACHED
VERTICAL CONTROL:
Y
,1
BOTTOM EDGE OF CUT
BOTTOM EDGE OF CUT
A P
P R
O X
M I L
E
5. THE SPD SHOWN ON THE PLATE REPRESENTS A "SINGLE POINT DISCHARGE" LOCATION.
VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO DREDGING IN THE AREA.
4. THE LOCATIONS, ALIGNMENTS AND CLEARANCES OF ALL PIPELINES SHALL BE
3. ALL AZIMUTHS ARE MEASURED FROM 0 DEGREES NORTH (GEODETIC).
2. SIDE SLOPES FOR ALL DREDGE CUTS ARE: 1V on 2H.
STATIONS 1397+97 to 1817+50 = 150'.
1. BOTTOM WIDTH FOR DREDGE CUT IS AS FOLLOWS:
NOTES:
HOUMA NAVIGATION CANAL
INNER LIMIT OF DISPOSAL
M I L
E
.5
M I L
E
M I L
E
M I L
E
N
NEW ORLEANS DISTRICT
D
2 3
C
4 5
A
B
E
R R
E B
O N
N E
P A
R
IS
H L
A
C /L
S T
A
M
IL
E
.5
T
O C
/L S
T A
M
IL
E
.5
N
O N
-C O
N T
IN
U
O U
S P
L A
N
H O
U M
A N
A V
IG
A
T
IO
N C
A N
A L
T
E R
R E
B O
N N
E B
A Y
M A
IN
T
E N
A N
C E
D R
E D
G
CHANNELLC
A
T
N
E
P L
A T
E
P .T
L
L I
M
E D
G I N
G
A P
P R
O X
P .C
.5
X
,5
,3
BUMP PHOTOGRAPHY FLOWN IN 2022.
INSIDE THE PLAN AREA, POLYCONIC PROJECTION - 1983 NORTH
AMERICAN DATUM IS SHOWN BY SOLID TICKS AND LAMBERT
CONFORMAL CONIC PROJECTION GRID IS SHOWN BY DASHED TICKS.
INSIDE THE PLAN AREA, POLYCONIC PROJECTION - 1983 NORTH
AMERICAN DATUM IS SHOWN BY SOLID TICKS AND LAMBERT
CONFORMAL CONIC PROJECTION GRID IS SHOWN BY DASHED TICKS.
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23.23 19
HYDRAULIC DREDGING - UPPER BARATARIA BAY WATERWAY DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
1.2 MEASUREMENT AND PAYMENT
1.2.1 Base Item: Preparatory Work For Barataria Bay - Lower Disposal
Area
1.2.2 Base Item: Preparatory Work For Barataria Bay - Upper Disposal
Area
1.2.3 Option Item: Bird Nesting Prevention and Avoidance Measures
1.2.4 Non-Standard Dredging Conditions
1.3 EXISTING STRUCTURES OR UTILITIES
1.4 AERIAL PHOTOGRAPHY DOCUMENTATION
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 DREDGING
3.1.1 Upper Barataria Bay Waterway Dredging Region
3.1.2 Disposal of Dredged Material
3.1.3 Dredge Discharge Pipeline
3.1.4 Before and After Disposal Surveys
3.1.5 Before and After Dredging Cross Sections
3.1.6 Survey Data
3.2 COLONIAL NESTING BIRDS
3.2.1 General
3.2.2 Implementation and Reporting
3.2.3 No Work Distances
3.2.4 Bird Nesting Prevention and Avoidance Measures
3.2.5 Discovery of Bird Nests at the Work Site
3.3 PREVIOUS DREDGING CONTRACTS
3.4 MINIMUM PRODUCTION RATE REQUIREMENTS
3.5 HORIZONTAL AND VERTICAL CONTROL POINTS
ATTACHMENTS:
Upper Barataria Bay Waterway Maintenance Dredging Plates
SECTION 35 20 23.23 19 Page 1
SECTION 35 20 23.23 19
HYDRAULIC DREDGING - UPPER BARATARIA BAY WATERWAY DREDGING REGION
PART 1 GENERAL
1.1 SCOPE
This section details specific requirements, which are in addition to the general requirements set forth in the specifications, for the Upper Barataria Bay Waterway Dredging Region. The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all work required for dredging in the specified dredging region, except for those measures set forth in other technical portions of the specifications.
1.2 MEASUREMENT AND PAYMENT
All costs for the work covered under this section shall be included in the contract unit price per hour in the "Barataria Bay Dredging" and "Barataria Bay Option Dredging" items on the bidding schedule except for Base Item "Preparatory Work For Barataria Bay - Lower Disposal Area", Base Item "Preparatory Work for Barataria Bay - Upper Disposal Area", and Option Item "Bird Nesting Prevention and Avoidance Measures". Once dredging operations are complete in the Barataria Bay Channel, all costs associated with the final demobilization of the Contractor's plant and equipment shall be included in the contract job price in the "Mobilization and Demobilization" item on the bidding schedule.
1.2.1 Base Item: Preparatory Work For Barataria Bay - Lower Disposal Area
All costs associated with the towing of the dredge and attendant plant from the Houma Navigation Canal Dredging Region to the Upper Barataria Bay Waterway Dredging Region starting from the time material stops flowing out of the discharge pipeline in the Houma Navigation Canal, all costs associated with the mobilization of any dredge plant required for the Upper Barataria Bay Waterway Dredging Region that is in excess of what was required at the Houma Navigation Canal Dredging Region, and all costs associated with preparing for disposal in the Lower Disposal Area shall be included in the job price in the "Preparatory Work For Barataria Bay - Lower Disposal Area" item on the bidding schedule. It is the Government's intent for dredging operations to commence in the upper reach of the Barataria Bay Waterway prior to the dredge working in the Entrance "Y" location near the Gulf Intracoastal Waterway.
1.2.2 Base Item: Preparatory Work For Barataria Bay - Upper Disposal Area
All costs associated with preparing the Upper Disposal Area for placement of dredged material shall be included in the job price in the "Preparatory Work For Barataria Bay - Upper Disposal Area" item on the bidding schedule.
This includes all operations necessary to create the access corridors needed for dredged material placement and all costs associated with the creation or refurbishment of earthen dikes, if they are needed to prevent dredged material from flowing outside of the disposal area limits shown on the plate.
SECTION 35 20 23.23 19 Page 2
1.2.3 Option Item: Bird Nesting Prevention and Avoidance Measures
All costs associated with Bird Nesting Prevention and Avoidance Measures shall be included in the contract unit price per day in the "Bird Nesting Prevention and Avoidance Measures" option item on the bidding schedule.
Pay time for this option item will be measured by the day. A day of performing the bird nesting prevention measures is defined as beginning at 0000 hours and ending at 2400 hours. Portions of a day when the nest prevention measures are required will be considered as a full day. Nest prevention measures shall be performed as described in the paragraph entitled "Bird Nesting Prevention and Avoidance Measures". Price and payment shall constitute full compensation for furnishing all equipment, labor, materials, supplies, supervision, removal of nest prevention measures, and all operations incidental thereto.
1.2.4 Non-Standard Dredging Conditions
The following conditions will be considered non-standard:
a. Those conditions described in Section 35 20 23.23, paragraph entitled "Dredging in Non-Standard Reaches and Conditions".
b. Any location within the Upper Barataria Bay Channel where the dredging template yields less than a 125 foot swing width.
1.3 EXISTING STRUCTURES OR UTILITIES
The structures or utilities listed below are known to be located within or near the dredging region.
Upper Reach Structure or Utility
Owner Information Approximate C/L Station
Elevation (feet MLG)
18" Waterline Jefferson Parish Public Utility
1221 Elmwood Park Blvd Suite 909 Jefferson, LA 70123 Mr. Sidney Bazley 504-736-6744 SBazley@jeffparish.net
Runs parallel to channel
Unknown
12" Waterline Jefferson Parish Public Utility (see above)
1608+37.72 Unknown
16" Waterline to Grand Isle
Jefferson Parish Public Utility (see above)
Runs parallel to channel
Unknown
SECTION 35 20 23.23 19 Page 3
Utility
Owner Information Approximate C/L Station
Elevation (feet MLG)
13.8kV submerged cable
Entergy Louisiana, Inc.
Mr. Terry Thompson 985-850-1253 TThomps@entergy.com
1593+68.00 -18.0' MLG
12" Pipeline Shell
Mr. Damian Cambre 504-465-6878(ofc) 225-380-9089(cell) damian.cambre@shell.com
1587+55.85 -21.0' MLG
12" Pipeline Shell (see above)
1584+28.85 Unknown
16" Chalmette Liquids Propylene Pipeline
Enbridge Midcoast Energy
Mr. Mike Brock 903-431-9993 mikeb@sulphurriver.com
1549+31.50 -17.0' MLG
16" Montegut-Gloria Natural Gas Pipeline
Koch Pipeline P.O. Box 1229 Kenner, LA 70062
1548+37.20 Unknown
24" Crude Oil…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .