This document contains an amendment to a solicitation for a Very Small Aperture Terminal (VSAT) indefinite delivery indefinite quantity contract. Key details include:

  • The solicitation is for a firm fixed price IDIQ contract under Foreign Military Sales for supplies of VSAT equipment. Submissions are due by December 7, 2018 at 3pm EST and offerors should request confirmation of receipt.

  • The VSAT network will provide bandwidth to fixed sites in Iraq, with requirements for equipment operating in the KU band up to 20GHz, meeting IEEE 1662-2016 standards. Pricing is included in an updated VSATPRICE spreadsheet.

  • The contractor must have an OPSEC coordinator certified at Level II in accordance with Army Regulation 530-1, demonstrated through training certificates for the OPSE-2380 and OPSE-2390 courses. The OPSEC plan is due within 90 days of any delivery order award.

  • The solicitation answers questions from potential offerors clarifying technical and compliance requirements.

  • The Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground is the contracting agency.

AMENDMENT 0007

View the file

Other files for this federal contract opportunity

Other files attached to VERY SMALL APERTURE TERMINAL (VSAT), newest first.
File Type Posted
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
VSATPRICE_28_November_2018.xlsx XLSX spreadsheet
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
W91CRB-19-R-5001.pdf PDF
VSATPRICE.xlsx XLSX spreadsheet
VSAT_LPTA_IDIQ-1_CDRLS_18_Oct_18.pdf PDF
APPENDIX_E.docx DOCX document
APPENDIX_C.docx DOCX document
APPENDIX_A.docx DOCX document
APPENDIX_B.docx DOCX document
APPENDIX_D.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W91CRB

ACC-APG - DIVISION D (W91CRB)

6515 INTEGRITY COURT

APG, MD 21005-3013

REM D NGO

EMAIL: REM.D.NGO.CIV@MAIL.MIL

W91CRB-19-R-5001

2018NOV07

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: REM D NGO

Buyer Office Symbol/Telephone Number: CCAP SCD/(410)306-2667

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

Q 65:

Amendment 0002, Q4 states that the VSAT Hub is located in the Green Zone, Baghdad, Iraq at the Iraq Ministry of Defense Headquarters.

Are both iDirect and Vipersat hubs located in the same place? Our suppliers have indicated that they are unable to provide an accurate quotation without this information.

Answer:

Yes, both hubs are located in the same location

Q 66:

In Appendix E, there are 11 TDMA scenarios and 5 SCPC scenarios. The SCPC scenarios are all identical. Is it sufficient to present only one set of link budgets for the SCPC links (main and backup hub best, middle and worst case locations?

Answer:

Yes, that is acceptable

Q 67:

In Appendix E, link #4 and link #9 have an upstream MIR of 0 kbps but a CIR of 48 kbps. Link #10 has a MIR of 0 kbps but a CIR of 256 kbps. Can the Government please clarify this discrepancy?

Answer:

Yes, that is correct the CIR should be set to 0 (zero) on links #4, #9, #10.

Q 68:

Will the Government accept bandwidth for the fixed sites with the uplink frequency in the 13.75 Ghz to 14.5 GHz range?

Answer:

No

Q 69:

Section 4.5 of the RFQ calls for the installation to meet IEEE 1662-2008 standards. However IEEE 1662-2008 is a design guide for the design and application of power electronics in electrical power systems on ships. Will the government please clarify if a standard other than IEEE 1662-2008 was intended?

Answer:

Replace all IEEE 1662-2008 standards references in the PWS with the following:

1662-2016 - IEEE Recommended Practice for the Design and Application of Power Electronics in Electrical Power Systems

Q 70:

Excel Pricing Spreadsheet, VSATPRICE.xlsx

4 . CLIN 0004 EQUIPMENT

SLIN 0004ap thru 0004au: Descriptions do not specify required operating frequency range of test equipment.

Question: The test equipment identified in the Product/Service column comes with multiple configuration options, based on application and frequency range. Will the Government modify the descriptions to specify, at a minimum, required operating frequency range of test equipment identified in SLIN 0004ap thru 0004au?

Answer:

This equipment will be used for the KU Band Spectrum, or up to 20 GHz.

2 3

W91CRB-19-R-5001

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Q 71:

Excel Pricing Spreadsheet, VSATPRICE.xlsx

CLIN 0001 Bandwidth Fixed Sites (ah an) / (Cells H11 H16), Year 1, Year 2, Year 3, Year 4, Year 5

There appears to be an error in the spreadsheet formulas calculating Weighted Unit Price for the above referenced CLINS in the tabs for Year 1 5. Instead of multiplying the unit price by the evaluation weighting percentage, these cells multiply the unit price by the evaluation quantity. The evaluated price differs greatly due to this formula difference.

Question: Will the Government please confirm the cell formulas are calculated incorrectly and provide an updated VSATPRICE.xlsx price sheet?

Answer:

Updated spreadsheet (VSATPRICE 28 November 2018) has been loaded on FBO.

RFP/PWS Section Page # 19 Question PWS 9.4 Operations Security 9.4.1 OPSEC Plan

Reference Q&A Q 29: RFP "PWS 9.4 Operations Security 9.4.1 OPSEC Plan Pg 19 " In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1. Does Facility Security Officer qualifications satisfy the level II OPSEC coordinator requirements?

We understand The Facility Security Officer needs to be Level II OPSEC Certified in accordance with AR 530-1 in order to meet the requirements of the OPSEC Coordinator.

It is our understanding per the Interagency OPSEC Support Staff (IOSS) that the that across the board an actual Level II OPSEC

Certification is not being issued.

Q 72:

As the IOSS is not issuing Level II OPSEC Certifications required per the PWS and as clarified as being required in the Q&As, would the

Government please confirm the equivalent of the Level II OPSEC certification are the two courses (the OPSE-2380 and OPSE- 2390), and as such, it would be acceptable to submit the two certifications (2380 and 2390) and have that accepted as being Level II OPSEC Certified?

Answer:

The Government is not requiring the Facility Security Officer to be OPSEC Level 2 Certified. The offerors personnel responsible for implementing the OPSEC Plan is/are required to be OPSEC Level 2 Certified in accordance with AR 530-1. The certified personnel also serve as the OPSEC coordinator for the contract. Question and Answer #29 in Amendment 0005 to the solicitation references the Facility

Security Officer as this relates to OPSEC Level 2 Certification. The Government provided an answer for the example or scenario involving the Facility Security Officer which was posed in the question. The Governments answer to this question does not require offerors to OPSEC Level 2 certify their Facility Security Officers.

Training and certification is required for all OPSEC officers, managers, reviewers and coordinators IAW AR 530-1. The Interagency OPSEC

Support Staff (IOSS) established standards for 3 levels of OPSEC certification which may be found at:

https://www.iad.gov/ioss/department/opsec-certification-10065.cfm . The offerors designated OPSEC coordinator is required to register at this website and take the required training which will result in OPSEC Level 2 certification. In order to become level 2 certified the offeror is required to take OPSE-2380 "OPSEC Analysis" and OPSE-2390 "Program Management" Courses. Each course is two days long and taught back-to-back. Successful completion of each course results in a certification. Successful completion of both OPSE-2380 and

OPSE-2390 is considered Level 2 Certified in the Army. There is no certificate indicating OPSEC level 2 certified but a certificate from each course is required to be considered OPSEC Level 2 certified.

Q 73:

Would the Government please confirm that the required OPSEC Level II Certification is to be included with the offerors proposal response?

Answer:

The OPSEC Level 2 Certification is required to be submitted with the offerors OPSEC Plan in accordance with CDRL F001. Offerors are required to submit a training certificate from each course identified above along with the OPSEC Plan. Offerors are reminded that the

OPSEC Plan is a required deliverable with each Delivery Order and is to be submitted no later than 90 calendar days after the Delivery

Order is issued/awarded.

*** END OF NARRATIVE A0008 ***