Performance Work Statement

View the file

Other files

File Type Posted
Deluge_Q&A-_AMD_01.pdf PDF
Attachment_3_Deluge_Cost_Model_3_Year_service_FFP_TM.xlsx XLSX spreadsheet
Attachment_2_Deluge_Section_L_and_M.DOCX DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement 2 Feb 2018

1.0 INTRODUCTION

1.1 Background

The High Speed Deluge Systems located in Buildings 688, 690, 699, and 700 in the Aberdeen Area of Aberdeen Proving Ground (APG), and in Building E-1430 at the Edgewood Area of APG, MD need to be inspected and maintained to ensure operational readiness. The contractor shall furnish all labor, parts and materials for maintenance, repair, and testing of all High Speed Deluge Systems and related equipment located at buildings 688, 690, 699, and 700 at the Aberdeen Area of APG and building E-1430 at the Edgewood Area of APG, MD. The systems are to be tested in accordance with the Performance Work Statement (PWS), manufacturer’s recommendations, UFC 3-601-02, “Operation and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems”, National Fire Protection Association (NFPA) 15, “Standard for Water Spray Fixed Systems for Fire Protection”, and NFPA 25, NFPA 72, “National Fire Alarm and Signaling Code”, and DA PAM 385-64, “Ammunition and Explosives Safety Standards”.

1.2 Objective

To ensure 100% operational readiness of the five deluge systems shown below in accordance with (IAW) all directives indicated above.

· Building 688 – Two bay system consisting of 16 nozzles fed by one 30,000 gallon water storage tank*.

· Building 690 – One bay system consisting of 8 nozzles fed by one 30,000 gallon water storage tank*.

*Buildings 688 and 690 share the same water source.

· Building 699 – Eight Bay system consisting of 80 nozzles fed by two 15,000 gallon water storage tanks.

· Building 700 – Seven Bay system consisting of 46 nozzles fed by one 30,000 gallon water storage tank and a separate two bay portable system.

· Building E1430 – Two bay portable system

2.0 APPLICABLE DOCUMENTS

Unified Facilities Criteria (UFC) 3-601-02, “Operation and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems”.

National Fire Protection Association (NFPA) 15, “Standard for Water Spray Fixed Systems for Fire Protection”.

National Fire Protection Association (NFPA) 72, “National Fire Alarm and Signaling Code” Department of the Army Pamphlet (DA PAM) 385-64, “Ammunition and Explosives Safety Standards”.

Aberdeen Test Center (ATC) Policy Bulletin 3-16, “”.

3.0 SPECIFIC TASKS AND REQUIREMENTS

3.1 General

The contractor shall provide the necessary personnel, equipment, deluge system components, materials, and technical expertise to conduct the work described in this PWS. The contractor shall inspect and test the five deluge systems listed in Section 3.2 to ensure 100% system operational readiness. Performance of this contract shall result in fully operational Deluge Systems.

3.2 Task 1 - Ensure 100% Deluge System Operational Readiness (FFP)

3.2.1 Actuators, Sensors, Valves, Nozzles, Sprinklers, Piping, and Sprinkler Water Flow Alarms. The contractor shall verify that all deluge system components and alarms are in working order, and that all alarm devices generate both audible and visual signals. All “Annual” tasks indicated on Table 2-4 of UFC 3-601-02 shall be conducted.

TABLE 1. DELUGE SPRINKLER SYSTEMS INSPECTION, TESTING, AND MAINTENANCE (ITM) TASKS

Component
Task
1. Control Valves (sealed, locked, or electrically supervised)
Verify valve position.
2. Waterflow Alarm Devices
a. Operate to verify initiation and receipt of alarm.

b. Verify alarm test valve alignment and tamper switch (if sealed or electrically supervised).

3. Deluge Alarm Valve and Trim
a. Inspect the exterior of valves, gauges, trim alignment.

b. Verify valve pressure and legibility of the hydraulic nameplate.

4. Main Drain
a. Conduct a main drain test to verify supply (valve position).

b. Document static and residual pressure readings on a 3x5 tag and secure it to the system pressure gauge.

c. Compare results with results from previous main drain tests and original acceptance test.

d. Verify that the results are within acceptable limits or identify corrective measures.

5. Fire Department Connection
a. Verify accessibility and condition.

b. If caps are removed or missing, check for obstructions.

3.2.2 The contractor shall ensure water pressure and air pressure information, as well as all tamper switch indicators accurately report to the fire alarm control panel (FACP), and ensure that the alarm and or trouble indicators reset properly. Gauges shall be marked or labeled to indicate the appropriate/expected range. All “Annual” tasks indicated on Table 2-1 of UFC 3-601-02 shall be conducted.

TABLE 2. FIRE DETECTION AND ALARM SYSTEM ITM TASKS

Component
Task
1. Control Panel and Annunciator Equipment (monitored)
a. Test to verify proper receipt of alarm, supervisory, and trouble signals (inputs) and operation of notification appliances and auxiliary functions (outputs).

b. Verify that all lamps and LEDs are illuminated.

c. Load test backup batteries (when provided).

2. Initiating Devices:

Manual Fire Alarm Stations

a. Verify station is accessible (visual).

Radiant Energy Detectors (Optical Detectors)

b. Test to verify alarm initiation and receipt.

Verify no facility change that affects performance.

3. Notification Appliances and Voice Communication (telephone, speakers, horns, and strobe lights)
a. Test to verify operability.
4. Digital Alarm Transmitters and Receivers
a. Test to verify operability.

3.2.3 Full Flow Trip Testing: The contractor shall verify that the deluge systems are fully operational, and will respond as designed both automatically and manually by performing a full flow trip test with the water control valve(s) fully open. The contractor shall verify deluge system response times. The contractor shall record water pressure values and response times in accordance with NFPA 15. The contractor shall determine the time lapse between operation of the detection systems and water flow at the most remote water spray nozzles. Individual sensor response time, and flow volume of sprinklers/nozzles will be recorded and further annotated as either a pass/fail. Pass/fail shall be determined based on response time, which must be less than 100 milliseconds.

3.3 Task 2 - Reports (FFP)

3.3.1 The contractor shall provide a detailed status test report for each system IAW the template provided in Attachment 1. (CDRL 001)

3.3.2 The report shall include deficiencies found on each system during inspection and testing, to include corrective action required for 100% system readiness. The report shall include the results of full flow testing.

3.4 Task 3 - Piping and Instrumentation Diagram (FFP)

3.4.1 The contractor shall create a detailed Piping and Instrumentation Diagram (P&ID) of the Building 688 and 690 deluge systems. An example of a P&ID can be found in Attachment 2. The PI&D shall be provided to the Government in electronic format in a file format to be agreed upon between the Government and the contractor at the kickoff meeting.(CDRL-002)

3.5Emergency Repair (T&M)
3.5.1In the event any high-speed deluge becomes unserviceable, or when deficiencies are identified during inspection, the contractor will supply the government with a detailed cost estimate for repair and recertification of the system. Work may not be completed until approved by KO.(CDRL-003)
3.6Coordination and Documentation
3.6.1ATC will schedule and hold a project kickoff meeting within five (5) days of contract award. A tentative schedule for the planned work will be jointly developed at the kickoff meeting. At the meeting, the Government will provide the names of points-of-contact (POC) for each building where the contractor will be working.
3.6.2As work progresses, the contractor shall keep the ATC Contracting Officer’s Representative (COR) informed as to progress. The contractor shall inform the COR when the contractor intends to begin work at a particular building in a timely manner to minimize any impact on planned ammunition operations, and to minimize contractor down time. The COR will in turn inform the various building custodians.
3.6.3The contractor shall “check in” on a daily basis before starting work with the POC of the building(s) where contractor personnel will be working to ensure that there is minimal impact with ongoing ammunition operations, and to ensure the safety of all personnel.
3.6.4The contractor shall immediately bring problems or potential problems to the attention of the ATC Contracting Officer’s Representative (COR). Verbal reports from the contractor shall be followed up with an email to the COR within five (5) business days.

4.0 TRAINING/QUALIFICATIONS: Trained or qualified personnel shall perform Inspection, Testing, and Maintenance (ITM) and repair tasks only on the systems for which these personnel have been specifically qualified. Trained or qualified personnel may supervise other less qualified personnel in the execution of the tasks covered in this UFC. At no time shall apprentice-level craftspersons be allowed to execute the ITM tasks without a qualified supervisor on site. Trained or qualified personnel shall perform ITM and repair tasks only within the scope of their specific qualification.

Generally accepted qualifications include:

(1) General or equipment-specific qualification/endorsement provided by an equipment manufacturer for the manufacturer’s equipment, and;

(2) Craftspersons with other recognized journeyman or craftsman-level qualifications for fire protection systems, such as National Institute for Certification in Engineering Technologies (NICET) (Level III certification in Fire Alarm Systems, Inspection and Testing of Water-Based Systems, or Special Hazard Suppression Systems), or formalized labor organization-based journeyman training, or similar programs.

5.0. INSPECTION: All work to be performed will be inspected by the Government for compliance with the requirements of this PWS.

6.0 GOVERNMENT FURNISHED EQUIPMENT/INFORMATION/ACCESS

No Government Furnished Equipment will be provided for the performance of this contract.

7.0 SECURITY.

7.1 APG Installation Access. Contractor vehicles must exit and enter APG via route 715. All contractor vehicles must obtain a temporary vehicle registration at the APG visitor center by the route 715 gate before they will be allowed onto the installation.

7.2 Clearance

Contractor personnel do not need to possess a security clearance; however, temporary badges will be required for each person for access to Aberdeen Test Center. The badges shall be obtained at Building 324 on APG.

7.3 Identification and Badges

Contractor personnel shall comply with all regulations and security requirements when on-site at ATC, Aberdeen Proving Ground, to include, but not limited to, the following: presenting valid identification for government facility entrance, obtaining and using vehicle passes for all contractor-owned and/or privately owned vehicles, obeying all posted directives, and providing strict adherence to Security Forces direction in instances where Security Forces are dispatched to a particular location. Security badges will only be issued to Contractor personnel in accordance with ATC Policy Bulletin 3-16. Contractor personnel shall wear the security badge above the waist at all times while in the restricted (security) areas of APG, unless doing so constitutes a safety risk. Contractor personnel shall only display the security badge while inside the security area and ensure that it is out of sight once they exit the security area. The badge WILL NOT be used as identification to gain access to the installation or for identification off the installation. The Contractor is responsible for ensuring compliance by Contractor personnel.

7.4 Access to Government Facilities

7.4.1 ATC will provide access to government facilities as necessary with coordination between the contractor and COR. Currently, normal hours of operation for Government Ammunition Operations Division (AOD) personnel are 0630 - 1600 Monday through Thursday, and 0630 - 1500 on Friday, with no work on every second Friday (ATC adheres to a compressed schedule where every second Friday is a non-working day).

7.4.2 Deluge system Inspections and maintenance work by the contractor shall be performed between the hours of 0630 – 1600, Monday through Friday, in accordance with the normal ATC schedule. Work will not be performed on Federal holidays. Any deviations from this schedule must be coordinated in with the COR in advance. Operations in support of testing will take priority for scheduling purposes.

7.5 OPSEC

7.5.1 The contractor shall not take any photographs on-site at ATC unless such photographs have been approved by the Government in advance. Note that the use of personal imaging devices in secure areas is not permitted.

7.6 SECURITY POLICIES

7.6.1 Per Army Regulation 190-13 (The Army Physical security program), Para. 8-2.c,

(1) A check of records through the National Crime Information Center (NCIC) Interstate Identification Index (III) is the Army minimum baseline background check for entrance onto Army installations for non-CAC holders to include entrance of visitors. The FBI permits the use of NCIC III for vetting visitors to ensure the security of military installations.

7.6.2 Per DoD Directive Type Memorandum (DTM) 09-012 (Interim Policy Guidance for DoD Physical Access Control), Attachment 3, Para2.b.(4), Installation government representatives shall query the following government authoritative data sources to vet the claimed identity and to determine fitness, using biographical information including, but not limited to, the person's name, date of birth, and social security number:

(a) The National Crime Information Center (NCIC) database.

(b) The Terrorist Screening Database.

(c) Other sources as determined by the DoD Component or the local commander and/or director. These can include but are not limited to:

(1) Department of Homeland Security (E-Verify)

(2) Department of Homeland Security (U.S.VISIT)

(3) Department of State Consular Checks (non-U.S. citizen)

(4) The FVS-C

8.0 ACCOUNTING FOR CONTRACT SERVICES REQUIREMENT – ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (June 2013)

ACC-APG 5152.237-4900

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon of the DOD organization that is receiving or benefitting from the contracted services.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s Contractor Manpower Reporting website.

9.0Safety and Hazardous Materials
8.1Ammunition items and other energetic materials may be located at the buildings where the contractor is performing work. To ensure health/safety of personnel, contractor personnel shall follow any directions by AOD personnel, and all AOD rules, regulations, and guidelines pertaining to working at the buildings in this statement of work.

10.0 Period of Performance or Completion Date.

This PWS covers a base year and two additional option years. The contractor shall commence work upon award of the contract. All work shall be concluded within the following time frames after contract award.

(a) All inspections shall be concluded within 90 calendar days.

(b) Inspection reports shall be submitted within 14 calendar days after inspection of each individual system.

(c) P&ID of B688 and B690 must be submitted within 180 days of contract award (base year requirement only).

(d) Emergency repairs must be conducted within 14 calendar days.

11.0 Deliverables

The Contractor shall provide deliverables as described in this contract as well as subsequent task orders. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means.

IdentifierName
CDRL - 001Test Report for individual systems (FFP)
CDRL - 002Piping and Instrumentation Diagram (FFP)
CDRL - 003Cost estimate for emergency repairs (T&M)

Attachment 1 Report Format

B700

Bay/Rm
Zone
Water Pressure
R7404
Detect#
Trip Pressure
Response Time (milliseconds)
Counts
Pass/Fail
3
1’1

1’2

1’3

Man Pull

Inspection Notes/Recommendations:

1. Missing gauge. Replace with Model###.

2. Backup batteries need replaced. Replace with ###.

Attachment 2 Piping and Instrumentation Diagrams, B699 and B700 image2.jpeg image1.jpeg