DD1423_A001_-_A013.pdf
PDF 284 KB Posted
- Solicitation number
- W91B4N-16-R-0005
About this file
DD1423 A001 - A013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91B4N-17-R-0005.pdf | ||
| ATTACHMENT_0002_-_Region_Corps_Map.pdf | ||
| ATTACHMENT_0003_-_Past_Performance_Questionnaire.pdf | ||
| ATTACHMENT_0001_-_MOD_RFDOP_Pricing_Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0008 A TDP TM OTHER DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
POL SUPPORT FOR MOD W91B4N-17-R-0005 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 DELIVERY TICKET
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A 4.4.3 CSTC-A EF5.1.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO
8. APP CODE
N/A
REQUIRED
A
SEE BLK 16 ASREQ
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
TBD
a. ADDRESSEE
Draft
b. COPIES
Final
Reg Repro
16. REMARKS
BLK 10: Contractor shall submit one (1) delivery ticket for each delivery.
BLK 12: Due 10 days after contract award.
BLK 14: Contractor format. Shall adhere to the requirements within the Statement of Work. Should be submitted in PDF by email to applicable addressees.
The Government shall have (5) days for review and acceptance/rejection. The Government shall process payment upon acceptance.
PCO 1
PJM 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
DRIVER RECORD
15. TOTAL
0 2 0
A002
4. AUTHORITY (Data Acquisition Document No.)
7. DD 250 REQ
NO
8. APP CODE
N/A
16. REMARKS
9. DIST STATEMENT
10. F
11. AS
BLK 12: Contractor shall submit upon Go
BLK 14: Contractor format. Shall adhere t Work. Should be submitted in PDF by e
The Government shall confirm receipt wit
G. PREPARED BY
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page 1 of 6 Pages Adobe Professional 8.0
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
TOTAL PRICE
Reset
3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
4.4.6 CSTC-A EF5.1.2
EQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ASREQ SEE BLK 16
OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE
SUBMISSION
TBD
PCO
vernment's request. PJM o the requirements within the Statement of ail to applicable addressees.
hin 2 days.
Reg
Repro
H. DATE I. APPROVED BY
0 2
J. DATE
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-2 (BACK), AUG 96
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0008 A TDP TM OTHER DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
POL SUPPORT FOR MOD W91B4N-17-R-0005 TBD
A003 QUALITY CONTROL PLAN (QCP)
N/A 4.5.1 CSTC-A EF5.1.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO
8. APP CODE
ONE/R See BLK 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
R/ASR
Reg Repro
16. REMARKS
BLK 12: Due 10 days after contract award.
BLK 14: Contractor format. Shall adhere to the requirements within the Statement of Work. Should be submitted in PDF by email to applicable addressees.
The Government shall have 15 days for review and acceptance/rejection.
PCO 1 1
PJM 1 1
MoCI CERTIFICATIO
2 2 0
A004
7. DD 250 REQ
NO
8. APP CODE
N/A
16. REMARKS
BLK 12: Contractor shall certify that all P contaminants and will provide Ministry of quality as required.
BLK 14: MoCI Certification of Fuel Qual applicable addressees.
The Government shall have 2 days for rev
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page 2 of 6 Pages
TOTAL PRICE
Reset
N OF FUEL QUALITY
4.5.1 CSTC-A EF5.1.2
EQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ASREQ SEE BLK 16
OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE
SUBMISSION
ASREQ
PCO
OL products shipped shall be free of PJM Commerce & Industry MoCI certification of fuel
ty. Should be submitted in PDF by email to
Reg ew and acceptance/rejection.
15. TOTAL 0 2 0
H. DATE I. APPROVED BY J. DATE
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0008 A TDP TM OTHER DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
POL SUPPORT FOR MOD W91B4N-17-R-0005 TBD
A005 BATCH QUALITY CONTROL DOCUMENTS
N/A 4.6.2 CSTC-A EF5.1.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO
8. APP CODE
MTHLY SEE BLK 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
MTHLY
Reg Repro
BLK 12: Due to the Government monthly with submission of invoices.
BLK 14: Applicable refinery format is acceptable. Shall be submitted in PDF by email to applicable addressees.
The Government shall have five (5) days for review and acceptance/rejection. The Government shall process payment upon acceptance.
MAINTENANCE REC
A006
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. F
S
8. APP CODE
N/A
16. REMARKS
A 11. AS
BLK 10: Shall be submitted to Governme
BLK 14: Contractor format is acceptable.
by email to applicable addressees.
The Government shall confirm receipt wit
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page 3 of 6 Pages
TOTAL PRICE
Reset
ORDS
4.7.1 CSTC-A EF5.1.2
EQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
EE BLK 16 ASREQ
OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE
SUBMISSION
ASREQ
PCO
nt upon request. PJM
Shall be in English. Shall be submitted in PDF hin two (2) days of submission.
Reg
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0008 A TDP TM OTHER DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
POL SUPPORT FOR MOD W91B4N-17-R-0005 TBD
A007 VEHICLE LIST
N/A 4.7.3 CSTC-A EF5.1.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO
8. APP CODE
MNTHLY SEE BLK 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
MNTHLY
Reg Repro
BLK 14: Contractor format is acceptable. Shall be submitted IAW the Statement of Work.
Shall be submitted in PDF by email to applicable addressees.
DAILY DELIVERY R
A008
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. F
S
8. APP CODE
N/A
16. REMARKS
BLK 10: Shall be submitted daily by 2000
BLK 12: Shall be submitted upon Delivery Order.
BLK 14: Contractor format is acceptable. S Statement of Work. Shall be submitted in P
The Government shall have one (1) day
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page 4 of 6 Pages
TOTAL PRICE
Reset
PORT
CSTC-A EF5.1.2
EQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
EE BLK 16 SEE BLK 16
OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE
SUBMISSION
ASREQ
PCO
local time. PJM
Order award and throughout the Delivery hall adhere to the requirements IAW the
Reg
Repro
DF by email to applicable addressees.
r review and acceptance/rejection.
15. TOTAL 0 2 0
H. DATE I. APPROVED BY J. DATE
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0008 A TDP TM OTHER DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
POL SUPPORT FOR MOD W91B4N-17-R-0005 TBD
A009 CERTIFICATE OF ORIGIN
N/A 5.3.3 CSTC-A EF5.1.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO
8. APP CODE
MTHLY SEE BLK 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
MTHLY
Reg Repro
BLK 14: Applicable commercial industry format is acceptable. Shall be submitted IAW the Statement of Work. Shall be submitted in PDF by email to applicable addressees. For each bulk purchase.
QUALITY AND QUA
A010
7. DD 250 REQ
NO
9. DIST STATEMENT
REQUIRED
10. F
S
8. APP CODE
N/A
BLK 10:
BLK 12:
BLK 13:
BLK 14:
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page 5 of 6 Pages
TOTAL PRICE
Reset
NTITY RECORDS
5.3.5 CSTC-A EF5.1.2
EQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
EE BLK 16 SEE BLK 16
OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE
SUBMISSION
SEE BLK 16
PCO
PJM
Reg
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0008 A TDP TM OTHER DATA
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
POL SUPPORT FOR MOD W91B4N-17-R-0005 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011 OTHER DOCUMENTATION: VEHICLE LOGS,
CALIBRATION TESTS
RESULTS OF QUALITY OR QUANTITY
DISCREPANCY INVESTIGATIONS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A 5.3.3 CSTC-A EF5.1.2
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO
8. APP CODE
ASREQ SEE BLK 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
Reg Repro
BLK 12: Applicable documents are due to the Government when requested.
BLK 14: Contractor format is acceptable. Shall be submitted in PDF by email to applicable addressees.
The Government shall have two (2) days to confirm receipt of documentation.
ANTI/COUNTER COR
A012
7. DD 250 REQ
NO
8. APP CODE
N/A
16. REMARKS
BLK 12: Due 15 days after contract
BLK 14: Contractor format. Shall adhere t Work. Should be submitted in PDF by e
The Government shall have 15 days for re
DD FORM 1423-2, AUG 96 PREVIOUS EDITION MAY BE USED. Page 6 of 6 Pages
TOTAL PRICE
Reset
RUPTION PLAN (ACCP)
5.3.5 CSTC-A EF5.1.2
EQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
ONE/R SEE BLK 16
OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE
SUBMISSION
R/ASR
PCO
. PJM
o the requirements within the Statement of ail to applicable addressees.
view and acceptance/rejection.
Final
Reg
2 2
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
| DD1423 A001 - A002 |
| CONTRACT DATA REQUIREMENTS LIST |
| A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: |
| D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR |
| N/A 4.4.3 CSTC-A EF5.1.2 |
| NO |
| N/A |
| A |
| TBD |
| BLK 10: Contractor shall submit one (1) delivery ticket for each delivery. BLK 12: Due 10 days after contract award. |
| DRIVER RECORD |
| 0 2 0 |
| N/A |
| NO |
| N/A |
| A |
| BLK 12: Contractor shall submit upon Go |
| G. PREPARED BY |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96
| DD1423 A003 - A004 |
| CONTRACT DATA REQUIREMENTS LIST |
| A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: |
| D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR |
| N/A 4.5.1 CSTC-A EF5.1.2 |
| NO |
| N/A |
| A |
| R/ASR |
| BLK 12: Due 10 days after contract award. |
| MoCI CERTIFICATIO |
| 2 2 0 |
| N/A |
| NO |
| N/A |
| A |
| BLK 12: Contractor shall certify that all P contaminants and will provide Ministry of quality as required. |
| G. PREPARED BY |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96
| DD1423 A005 - A006 |
| CONTRACT DATA REQUIREMENTS LIST |
| A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: |
| D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR |
| N/A 4.6.2 CSTC-A EF5.1.2 |
| NO |
| N/A |
| A |
| MTHLY |
| BLK 12: Due to the Government monthly with submission of invoices. |
| MAINTENANCE REC |
| 0 2 0 |
| N/A |
| NO |
| S |
| N/A |
| BLK 10: Shall be submitted to Governme |
| G. PREPARED BY |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96
| DD1423 A007 - A008 |
| CONTRACT DATA REQUIREMENTS LIST |
| A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: |
| D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR |
| N/A 4.7.3 CSTC-A EF5.1.2 |
| NO |
| N/A |
| A |
| MNTHLY |
| BLK 12: Due to the Government monthly with submission of invoices. |
| DAILY DELIVERY R |
| 0 2 0 |
| N/A |
| NO |
| S |
| N/A |
| BLK 10: Shall be submitted daily by 2000 |
| G. PREPARED BY |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96
| DD1423 A009 - A010 |
| CONTRACT DATA REQUIREMENTS LIST |
| A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: |
| D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR |
| N/A 5.3.3 CSTC-A EF5.1.2 |
| NO |
| N/A |
| A |
| MTHLY |
| BLK 12: Due to the Government monthly with submission of invoices. |
| QUALITY AND QUA |
| 0 2 0 |
| N/A |
| NO |
| S |
| N/A |
| BLK 10: |
| G. PREPARED BY |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96
| DD1423 A011 - A012 |
| CONTRACT DATA REQUIREMENTS LIST |
| A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: |
| D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR |
| N/A 5.3.3 CSTC-A EF5.1.2 |
| NO |
| N/A |
| A |
| N/A |
| BLK 12: Applicable documents are due to the Government when requested. |
| ANTI/COUNTER COR |
| 0 2 0 |
| N/A |
| NO |
| N/A |
| A |
| BLK 12: Due 15 days after contract |
| G. PREPARED BY |
| INSTRUCTIONS FOR COMPLETING DD FORM 1423 |
| FOR GOVERNMENT PERSONNEL |
| FOR THE CONTRACTOR |
DD FORM 1423-2 (BACK), AUG 96