W913FT21R0001.pdf
PDF 741 KB Posted
- Attached to
- Light Armored Vehicles with Drivers
- Solicitation number
- W913FT21R0001
About this file
This is a request for proposals for light armored vehicle services in Colombia. The Army Contracting Command is seeking a contractor to provide 15 light armored vehicles with drivers in Bogota for Special Operations Command South personnel on missions. The period of performance is one base year and four option years. The contractor must provide all necessary personnel, equipment, supplies, facilities, transportation, and materials except government furnished property and services. The contractor is responsible for quality control, operations security, and ensuring employees have proper credentials and background checks. The contractor must attend a post-award conference and periodic progress meetings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W913FT21R0001 AMEND 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W913FT21R0001 21-Jan-2021
b. TELEPHONE NUMBER
(11571) 275 2552
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 22 Feb 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W913FT9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ROSALBA MATEUS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
REGIONAL CONTRACTING OFFICE (RCO) BOGOTA
U.S. EMBASSY-BOGOTA
USMILGRP UNIT 5130
AP0 AA 34038-5130
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W589VX 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SECURITY COOPERATION OFFICE (SCO) - AOB
COR
AOB BOGOTA
CARRERA 45 NO. 24B-27
BOGOTA
TEL: 275-2706 FAX: 383-2084
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
485320
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF120
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W913FT21R0001
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement ISO AOB
Six (6) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for six (6) vehicles FOB: Destination
PSC CD: V211
NET AMT
0002 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. AOB CLIN 0001.
0003 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement MIST.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
0004 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. MIST CLIN 0003.
0005 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement CMSE.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
0006 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. CMSE CLIN 0005.
0007 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement JX.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
0008 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. JX CLIN 0007.
0009 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J2.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
0010 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J2 CLIN 0009.
0011 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J5.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
0012 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J5 CLIN 0011.
0013 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement SOLO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
0014 1 Job Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. SOLO CLIN 0013.
0015 12 Months Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 12 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement KO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
0016 1 Job DBA - Worker's Compensation Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Agent/Broker’s invoice submitted by the offeror after contract award. In the event of recalculation of the premium by the Insurance Carrier based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.
For more information, see FAR clause 52.228-3, Worker’s Compensation
0017 1 Job CMR - Contractor manpower Reporting
FFP
IAW Part 5 Para 5.17 of the PWS.
1001 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement ISO AOB
Six (6) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for six (6) vehicles.
1002 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. AOB CLIN 1001.
1003 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement MIST.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
1004 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. MIST CLIN 1003.
1005 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement CMSE.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
1006 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. CMSE CLIN 1005.
1007 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement JX.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
1008 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. JX CLIN 1007.
1009 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J2.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
1010 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J2 CLIN 1009.
1011 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J5.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
1012 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J5 CLIN 1011.
1013 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement SOLO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
1014 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. SOLO CLIN 1013.
1015 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 12 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement KO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
1016 1 Job DBA - Worker's Compensation Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Agent/Broker’s invoice submitted by the offeror after contract award. In the event of recalculation of the premium by the Insurance Carrier based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.
For more information, see FAR clause 52.228-3, Worker’s Compensation
1017 1 Job CMR - Contractor manpower Reporting
FFP
IAW Part 5 Para 5.17 of the PWS.
2001 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement ISO AOB
Six (6) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for six (6) vehicles.
2002 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. ISO AOB CLIN 2001.
2003 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement MIST.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
2004 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. MIST CLIN 2003.
2005 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement CMSE.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
2006 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. CMSE CLIN 2005.
2007 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement JX.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
2008 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. JX CLIN 2007.
2009 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J2.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
2010 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J2 CLIN 2009.
2011 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J5.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
2012 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J5 CLIN 2011.
2013 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement SOLO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
2014 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. SOLO CLIN 2013.
2015 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 12 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement KO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
2016 1 Job DBA - Worker's Compensation Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Agent/Broker’s invoice submitted by the offeror after contract award. In the event of recalculation of the premium by the Insurance Carrier based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.
For more information, see FAR clause 52.228-3, Worker’s Compensation
2017 1 Job CMR - Contractor manpower Reporting
FFP
IAW Part 5 Para 5.17 of the PWS.
3001 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement ISO AOB
Six (6) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for six (6) vehicles.
3002 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. ISO AOB CLIN 3001.
3003 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement MIST.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
3004 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. MIST CLIN 3003.
3005 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement CMSE.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
3006 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. CMSE CLIN 3005.
3007 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement JX.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
3008 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. JX CLIN 3007.
3009 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J2.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
3010 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J2 CLIN 3009.
3011 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J5.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
3012 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J5 CLIN 3011.
3013 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement SOLO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
3014 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. SOLO CLIN 3013.
3015 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 12 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement KO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
3016 1 Job DBA - Worker's Compensation Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Agent/Broker’s invoice submitted by the offeror after contract award. In the event of recalculation of the premium by the Insurance Carrier based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.
For more information, see FAR clause 52.228-3, Worker’s Compensation
3017 1 Job CMR - Contractor manpower Reporting
FFP
IAW Part 5 Para 5.17 of the PWS.
4001 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement ISO AOB
Six (6) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for six (6) vehicles.
4002 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. ISO AOB CLIN 4001.
4003 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement MIST.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
4004 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. MIST CLIN 4003.
4005 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement CMSE.
Two (2) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for two (2) vehicles.
4006 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. CMSE CLIN 4005.
4007 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement JX.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
4008 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. JX CLIN 4007.
4009 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J2.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
4010 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J2 CLIN 4009.
4011 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement J5.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
4012 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. J5 CLIN 4011.
4013 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 24 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement SOLO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
4014 1 Job OPTION Travel
FFP
Travel cost including lodging and per diem IAW Para 5.0 of the Performance Work Statement. This is a Not-to-Exceed (NTE) line item. Contractor shall bill only actual cost incurred. Contractor shall obtain COR approval prior to travel.
Charges against this CLIN without prior COR authorization shall not be reimbursed. Contractor shall notify the contracting officer when 75% of the NTE amount has been expended. Contractor shall not incur cost over the Not-to-Exceed amount. Contractor shall submit back-up documentation of cost incurred against this CLIN. For travel which does not exceed 12 hours per diem or meals is not authorized and is not reimbursable IAW FAR 31.205-46. SOLO CLIN 4013.
4015 12 Months OPTION Light Armored Vehicle Services - Bogota
FFP
Light Armored Vehicle Services – Includes vehicle, insurance and fuel WITH DRIVER, 12 hours a day, 7 days a week, 365 days a year – Bogota IAW the Performance Work Statement KO.
One (1) Light Armored Vehicles – SUV - Mid Size - Model 2016 or newer.
Cost per month shall be for services rendered for one (1) vehicle.
4016 1 Job DBA - Worker's Compensation Insurance
FFP
The amount listed by the offeror on this CLIN is the estimated DBA insurance premium (estimated payroll of the offeror and its subcontractors times the applicable rate(s)). The actual amount paid by the government under this CLIN will be based on the amount of the Agent/Broker’s invoice submitted by the offeror after contract award. In the event of recalculation of the premium by the Insurance Carrier based on actual payroll amounts, the contracting officer will adjust this CLIN by contract modification to reflect actual premium amounts paid.
For more information, see FAR clause 52.228-3, Worker’s Compensation
4017 1 Job CMR - Contractor manpower Reporting
FFP
IAW Part 5 Para 5.17 of the PWS.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government 0016 Destination Government Destination Government 0017 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government
1013 Destination Government Destination Government 1014 Destination Government Destination Government 1015 Destination Government Destination Government 1016 Destination Government Destination Government 1017 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .