LIST FOR VENDORS.xls

XLS spreadsheet 82 KB Posted

Attached to
FUEL SYSTEM LA MACARENA Federal contract opportunity
Solicitation number
W913FT20R0004
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This document contains a list of items and estimated costs for a construction project to build a fuel system at La Macarena, Colombia. The project involves two stages of work including drawings, site preparation such as excavation and fencing, fuel tanks and equipment including pipelines and pumps, an electrical system, a metallic structure and roof, and complementary works. Estimated costs are provided for each item and stage in Colombian pesos and US dollars. The related federal contract opportunity is solicited by the Department of the Army Materiel Command Army Contracting Command to construct the fuel system at La Macarena in accordance with the attached solicitation. No response or award dates are included.

View the file

Other files for this federal contract opportunity

Other files attached to FUEL SYSTEM LA MACARENA, newest first.
File Type Posted
20R0004-0001.pdf PDF
plano inicial la macarena-Model2.pdf PDF
plano inicial la macarena-Model.pdf PDF
PHOTO-2020-09-15-11-32-30.jpg JPG image
PHOTO-2020-09-15-11-29-34_2.jpg JPG image
PHOTO-2020-09-15-11-29-40.jpg JPG image
PHOTO-2020-09-15-11-31-31_1.jpg JPG image
PHOTO-2020-09-15-11-32-21.jpg JPG image
Respuestas (1).docx DOCX document
PHOTO-2020-09-15-11-31-28.jpg JPG image
PHOTO-2020-09-15-11-31-25_1.jpg JPG image
PHOTO-2020-09-15-11-29-34_1.jpg JPG image
PHOTO-2020-09-15-11-24-24.jpg JPG image
PHOTO-2020-09-15-11-31-29.jpg JPG image
PHOTO-2020-09-15-11-32-23_1.jpg JPG image
PHOTO-2020-09-15-11-32-31_3.jpg JPG image
INSTRUCTIONS TO CONTRACTORS.docx DOCX document
Basic design stage 1 Current Design.pdf PDF
Basic design stage 2 Current Design.pdf PDF
20R0004.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

La Macarena F1 (2)

US EMBASSY BOGOTA COLOMBIA
MILITARY GROUP
LIST
PROVIDE AND INSTALL A FUEL SYSTEM AND REFURBISH ELECTRICAL NETWORKS
AT LA MACARENA - META, COLOMBIA
ItemDescriptionUnitQuantityUnit Price (COP)Total Value (COP)Total Value (USD)
3,200.0
STAGE 1
ADRAWINGS$ - 0-
A.1Structural and architectural drawingsEA$ 2,000,000.00$ - 0-
A.1Hydraulic drawings for stage1 and stage 2.EA1.00$ - 0-
A.2Electrical, control and data drawings for all systemsEA1.00$ - 0-
A.3Electrical and data drawings for all systemsEA2.00$ - 0-
A.3Mechanical drawings for all systemsEA1.00$ - 0-
B.1PRELIMINARIES$ - 0-0%
B.1.01Location and laying outm2660.00$ - 0-
B.1.02Provisional fencing and camp includes removeea1.00$ - 0-$ - 0
B.1.03Area adequacy (excavation and metrial for leveling)ea1.00$ - 0-
B.1PRELIMINARIES$ - 0-0%
B.1.01Location and laying outm2$ 3,290.00$ - 0-
B.1.02Provisional fencing and campea$ 2,000,000.00$ - 0-$ - 0
B.1.05Excavationm3$ 15,000.00$ - 0-
B.1.05Backfill and compactationm2$ 2,420.00$ - 0-
B.2EQUIPMENT$ - 0-0%
B.2.01Provide of carbon rolled steel storage fuel tank of 10000 gallons for diesel with pipelines and flow meter, tank base (secondary containment tank for spill) and plinth.Unit1.00$ - 0-
B.2.02Installation of tanks includes fuel networks and equipment (pipeline, pumps, accessories, and others).ea1.00$ - 0-
B.2.03Fuel meter to delivery diesel to generatorsUnit1.00$ - 0-
B.2.04Supply and install of filtration and recirculation system. 100 GPMUnit1.00$ - 0-
B.2.05Transportation of the fuel tanks to La Macarena or Bogota includes load and unload of the tanks.Unit4.00$ - 0-
B.2.06Electrical system for fuel pumping, grounding system, Lightning Protection System, panel control, and lighting.ea1.00$ - 0-
B.2.07Provide and installation of the three (3) satellite fire extinguishers type b (150 Lb), spill kits, and security signaling.ea1.00$ - 0-
B.2.08Fuel dispenser maintenance for vehiclesUnit1.00$ - 0-
B.2.09Testing and performance of all systems.Unit1.00$ - 0-
SUM OF ITEMS STAGE 1$ - 0-
Administration and Unforeseen25%$ - 0-0%
TOTAL ESTIMATED COST US GOVERNMENT$ - 0-
$ - 0
SUM OF ITEMS STAGE 1$ - 0-
Estimated profit for contractor5%$ - 0-
SUM OF ITEMS$ - 0-
0%
TOTAL ESTIMATED COST FOR CONTRACTOR STAGE 1$ - 0-
Execution Time STAGE 1 in Calendar Days35days
STAGE 2
ADRAWINGS$ - 0-
A.1Structural and architectural drawingsEA$ 2,000,000.00$ - 0-
A.1Structural drawingsEA1.00$ - 0-
B.1PRELIMINARIES$ - 0-
B.1.01Provisional fencingea1.00$ - 0-
B.1.02Excavation, material removal and final disposal for fuel tanksea1.00$ - 0-0%
B.1.03Backfill and compactation with selected materialm3360.00$ - 0-
B.1.04Concrete slab for tanks includes reinforcementm323.00$ - 0-
C.2FUEL EQUIPMENT$ - 0-
C.2.01Provide of carbon rolled steel storage fuel tank of 10000 gallons for diesel with pipelines and flow meter, tank base (secondary containment tank for spill) and plinth.ea1.00$ - 0-
C.2.02Installation of second tank includes fuel networks and equipment (pipeline, pumps, accessories, and others). Reinstallation of networks first tank installedea1.00$ - 0-
C.2.03Transportation of the fuel tanks to La Macarena or Bogota includes load and unload of the tanks.Unit1.00$ - 0-
C.2.04Electrical system for fuel pumping, grounding system, and lightning Protection System.ea1.00$ - 0-
C.2.05Relocation first tank and equipment installed.ea1.00$ - 0-
C.2.06Supplies to fuel filtration system (per a year)ea1.00$ - 0-
D.4METALLIC STRUCTURE$ - 0-
D.4.01Perimetral fencing with metallic mesh and pipe (columns) for roof to tanks high 4 m. includes access door and lockMl52.00$ - 0-
D.4.02Perimeter beam to fence includesc reinforcement 0.40x0.15Ml42.00$ - 0-
D.4.03Metallic structure for roof. Includes channelsm280.00$ - 0-
D.4.04Roof tile type "thermoacoustic", include all accessoriesm288.00$ - 0-
E.5ELECTRICAL SYSTEM$ - 0-
E.5.01Perimetral light changeea1.00$ - 0-
E.5.02Electrical feed connection change. cable 6x2+ 2N + 4TMl100.00$ - 0-
E.5.03Adequacy of electrical networks and panelsea1.00$ - 0-
E.5.04Provide and install a fuel software for control, counting, measurement, and operating. Includes sensorsea1.00$ - 0-
E.5.05Testing and performance of all systems. Includes training for workersUnit1.00$ - 0-
E.5.06Training for workers to all systemsUnit1.00$ - 0-
F.5.01COMPLEMENTARY WORKS$ - 0$ - 00%
F.5.01General cleaningEA1.00$ - 00.00
SUM OF ITEMS STAGE 2$ - 0- 0
Administration and Unforeseen25%$ - 0-
$ - 0-
SUM OF ITEMS STAGE 2$ - 0-
Estimated profit for contractor5%$ - 0-
SUM OF ITEMS$ - 0-
TOTAL ESTIMATED COST FOR CONTRACTOR STAGE 2$ - 0-
Execution Time STAGE 2 in Calendar Days90days
TOTAL ESTIMATED COST PROJECT (STAGE 1 + STAGE 2)$ - 0-
.
Payment form
Guarantee
Exchange Rate (1 USD$ = COP$3,200)

Page &P of &N

MBD00071120

File details come from the government source that posted it. Updated .