LIST FOR VENDORS.xls
XLS spreadsheet 82 KB Posted
- Attached to
- FUEL SYSTEM LA MACARENA Federal contract opportunity
- Solicitation number
- W913FT20R0004
About this file
This document contains a list of items and estimated costs for a construction project to build a fuel system at La Macarena, Colombia. The project involves two stages of work including drawings, site preparation such as excavation and fencing, fuel tanks and equipment including pipelines and pumps, an electrical system, a metallic structure and roof, and complementary works. Estimated costs are provided for each item and stage in Colombian pesos and US dollars. The related federal contract opportunity is solicited by the Department of the Army Materiel Command Army Contracting Command to construct the fuel system at La Macarena in accordance with the attached solicitation. No response or award dates are included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20R0004-0001.pdf | ||
| plano inicial la macarena-Model2.pdf | ||
| plano inicial la macarena-Model.pdf | ||
| PHOTO-2020-09-15-11-32-30.jpg | JPG image | |
| PHOTO-2020-09-15-11-29-34_2.jpg | JPG image | |
| PHOTO-2020-09-15-11-29-40.jpg | JPG image | |
| PHOTO-2020-09-15-11-31-31_1.jpg | JPG image | |
| PHOTO-2020-09-15-11-32-21.jpg | JPG image | |
| Respuestas (1).docx | DOCX document | |
| PHOTO-2020-09-15-11-31-28.jpg | JPG image | |
| PHOTO-2020-09-15-11-31-25_1.jpg | JPG image | |
| PHOTO-2020-09-15-11-29-34_1.jpg | JPG image | |
| PHOTO-2020-09-15-11-24-24.jpg | JPG image | |
| PHOTO-2020-09-15-11-31-29.jpg | JPG image | |
| PHOTO-2020-09-15-11-32-23_1.jpg | JPG image | |
| PHOTO-2020-09-15-11-32-31_3.jpg | JPG image | |
| INSTRUCTIONS TO CONTRACTORS.docx | DOCX document | |
| Basic design stage 1 Current Design.pdf | ||
| Basic design stage 2 Current Design.pdf | ||
| 20R0004.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
La Macarena F1 (2)
| US EMBASSY BOGOTA COLOMBIA | ||||||||
| MILITARY GROUP | ||||||||
| LIST | ||||||||
| PROVIDE AND INSTALL A FUEL SYSTEM AND REFURBISH ELECTRICAL NETWORKS | ||||||||
| AT LA MACARENA - META, COLOMBIA | ||||||||
| Item | Description | Unit | Quantity | Unit Price (COP) | Total Value (COP) | Total Value (USD) | ||
| 3,200.0 | ||||||||
| STAGE 1 | ||||||||
| A | DRAWINGS | $ - 0 | - | |||||
| A.1 | Structural and architectural drawings | EA | $ 2,000,000.00 | $ - 0 | - | |||
| A.1 | Hydraulic drawings for stage1 and stage 2. | EA | 1.00 | $ - 0 | - | |||
| A.2 | Electrical, control and data drawings for all systems | EA | 1.00 | $ - 0 | - | |||
| A.3 | Electrical and data drawings for all systems | EA | 2.00 | $ - 0 | - | |||
| A.3 | Mechanical drawings for all systems | EA | 1.00 | $ - 0 | - | |||
| B.1 | PRELIMINARIES | $ - 0 | - | 0% | ||||
| B.1.01 | Location and laying out | m2 | 660.00 | $ - 0 | - | |||
| B.1.02 | Provisional fencing and camp includes remove | ea | 1.00 | $ - 0 | - | $ - 0 | ||
| B.1.03 | Area adequacy (excavation and metrial for leveling) | ea | 1.00 | $ - 0 | - | |||
| B.1 | PRELIMINARIES | $ - 0 | - | 0% | ||||
| B.1.01 | Location and laying out | m2 | $ 3,290.00 | $ - 0 | - | |||
| B.1.02 | Provisional fencing and camp | ea | $ 2,000,000.00 | $ - 0 | - | $ - 0 | ||
| B.1.05 | Excavation | m3 | $ 15,000.00 | $ - 0 | - | |||
| B.1.05 | Backfill and compactation | m2 | $ 2,420.00 | $ - 0 | - | |||
| B.2 | EQUIPMENT | $ - 0 | - | 0% | ||||
| B.2.01 | Provide of carbon rolled steel storage fuel tank of 10000 gallons for diesel with pipelines and flow meter, tank base (secondary containment tank for spill) and plinth. | Unit | 1.00 | $ - 0 | - | |||
| B.2.02 | Installation of tanks includes fuel networks and equipment (pipeline, pumps, accessories, and others). | ea | 1.00 | $ - 0 | - | |||
| B.2.03 | Fuel meter to delivery diesel to generators | Unit | 1.00 | $ - 0 | - | |||
| B.2.04 | Supply and install of filtration and recirculation system. 100 GPM | Unit | 1.00 | $ - 0 | - | |||
| B.2.05 | Transportation of the fuel tanks to La Macarena or Bogota includes load and unload of the tanks. | Unit | 4.00 | $ - 0 | - | |||
| B.2.06 | Electrical system for fuel pumping, grounding system, Lightning Protection System, panel control, and lighting. | ea | 1.00 | $ - 0 | - | |||
| B.2.07 | Provide and installation of the three (3) satellite fire extinguishers type b (150 Lb), spill kits, and security signaling. | ea | 1.00 | $ - 0 | - | |||
| B.2.08 | Fuel dispenser maintenance for vehicles | Unit | 1.00 | $ - 0 | - | |||
| B.2.09 | Testing and performance of all systems. | Unit | 1.00 | $ - 0 | - | |||
| SUM OF ITEMS STAGE 1 | $ - 0 | - | ||||||
| Administration and Unforeseen | 25% | $ - 0 | - | 0% | ||||
| TOTAL ESTIMATED COST US GOVERNMENT | $ - 0 | - | ||||||
| $ - 0 | ||||||||
| SUM OF ITEMS STAGE 1 | $ - 0 | - | ||||||
| Estimated profit for contractor | 5% | $ - 0 | - | |||||
| SUM OF ITEMS | $ - 0 | - | ||||||
| 0% | ||||||||
| TOTAL ESTIMATED COST FOR CONTRACTOR STAGE 1 | $ - 0 | - | ||||||
| Execution Time STAGE 1 in Calendar Days | 35 | days | ||||||
| STAGE 2 | ||||||||
| A | DRAWINGS | $ - 0 | - | |||||
| A.1 | Structural and architectural drawings | EA | $ 2,000,000.00 | $ - 0 | - | |||
| A.1 | Structural drawings | EA | 1.00 | $ - 0 | - | |||
| B.1 | PRELIMINARIES | $ - 0 | - | |||||
| B.1.01 | Provisional fencing | ea | 1.00 | $ - 0 | - | |||
| B.1.02 | Excavation, material removal and final disposal for fuel tanks | ea | 1.00 | $ - 0 | - | 0% | ||
| B.1.03 | Backfill and compactation with selected material | m3 | 360.00 | $ - 0 | - | |||
| B.1.04 | Concrete slab for tanks includes reinforcement | m3 | 23.00 | $ - 0 | - | |||
| C.2 | FUEL EQUIPMENT | $ - 0 | - | |||||
| C.2.01 | Provide of carbon rolled steel storage fuel tank of 10000 gallons for diesel with pipelines and flow meter, tank base (secondary containment tank for spill) and plinth. | ea | 1.00 | $ - 0 | - | |||
| C.2.02 | Installation of second tank includes fuel networks and equipment (pipeline, pumps, accessories, and others). Reinstallation of networks first tank installed | ea | 1.00 | $ - 0 | - | |||
| C.2.03 | Transportation of the fuel tanks to La Macarena or Bogota includes load and unload of the tanks. | Unit | 1.00 | $ - 0 | - | |||
| C.2.04 | Electrical system for fuel pumping, grounding system, and lightning Protection System. | ea | 1.00 | $ - 0 | - | |||
| C.2.05 | Relocation first tank and equipment installed. | ea | 1.00 | $ - 0 | - | |||
| C.2.06 | Supplies to fuel filtration system (per a year) | ea | 1.00 | $ - 0 | - | |||
| D.4 | METALLIC STRUCTURE | $ - 0 | - | |||||
| D.4.01 | Perimetral fencing with metallic mesh and pipe (columns) for roof to tanks high 4 m. includes access door and lock | Ml | 52.00 | $ - 0 | - | |||
| D.4.02 | Perimeter beam to fence includesc reinforcement 0.40x0.15 | Ml | 42.00 | $ - 0 | - | |||
| D.4.03 | Metallic structure for roof. Includes channels | m2 | 80.00 | $ - 0 | - | |||
| D.4.04 | Roof tile type "thermoacoustic", include all accessories | m2 | 88.00 | $ - 0 | - | |||
| E.5 | ELECTRICAL SYSTEM | $ - 0 | - | |||||
| E.5.01 | Perimetral light change | ea | 1.00 | $ - 0 | - | |||
| E.5.02 | Electrical feed connection change. cable 6x2+ 2N + 4T | Ml | 100.00 | $ - 0 | - | |||
| E.5.03 | Adequacy of electrical networks and panels | ea | 1.00 | $ - 0 | - | |||
| E.5.04 | Provide and install a fuel software for control, counting, measurement, and operating. Includes sensors | ea | 1.00 | $ - 0 | - | |||
| E.5.05 | Testing and performance of all systems. Includes training for workers | Unit | 1.00 | $ - 0 | - | |||
| E.5.06 | Training for workers to all systems | Unit | 1.00 | $ - 0 | - | |||
| F.5.01 | COMPLEMENTARY WORKS | $ - 0 | $ - 0 | 0% | ||||
| F.5.01 | General cleaning | EA | 1.00 | $ - 0 | 0.00 | |||
| SUM OF ITEMS STAGE 2 | $ - 0 | - 0 | ||||||
| Administration and Unforeseen | 25% | $ - 0 | - | |||||
| $ - 0 | - | |||||||
| SUM OF ITEMS STAGE 2 | $ - 0 | - | ||||||
| Estimated profit for contractor | 5% | $ - 0 | - | |||||
| SUM OF ITEMS | $ - 0 | - | ||||||
| TOTAL ESTIMATED COST FOR CONTRACTOR STAGE 2 | $ - 0 | - | ||||||
| Execution Time STAGE 2 in Calendar Days | 90 | days | ||||||
| TOTAL ESTIMATED COST PROJECT (STAGE 1 + STAGE 2) | $ - 0 | - | ||||||
| . | ||||||||
| Payment form | ||||||||
| Guarantee | ||||||||
| Exchange Rate (1 USD$ = COP$3,200) |
Page &P of &N