This is an Amendment (No. 0001) to a Request for Quote (RFQ) issued by the U.S. Army Corps of Engineers, Cold Regions Research and Engineering Laboratory (CRREL), located in Hanover, New Hampshire. The amendment extends the solicitation closing date from 7 April 2026 to 13 April 2026 at 12:00 PM CDT and adds Questions and Answers clarifications to Section L.
The RFQ solicits quotes for fume hood and biosafety cabinet inspection and certification services. Offerors must provide NSF-certified inspectors and complete annual certifications on 19 fume hoods and 4 biosafety cabinets, with a required start date of 15 April 2026. Quotes must include company information, entity identification (CAGE code/UEI), a technical approach describing work methodology, past experience demonstrating three years of similar work with at least five completed projects, NSF bio-safety cabinet certification, ability to meet the start date, and firm-fixed pricing completed on the provided Pricing Matrix. Offerors must maintain active SAM registration with no exclusions and complete all required FAR and DFARS representations and certifications. Optional escorted site visits may be requested by 31 March 2026. Q&A clarifications address certification expiration dates (all but six units past due, with all requiring completion by 10 July 2026), reinspection timelines (15 calendar days from Government notification of repair completion), notification methods (email preferred), and reinspection scope (complete inspection of failed units). Quotes shall be submitted via email to ERDC-CRREL-QUOTES@usace.army.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08.02 RFQ W913E526QA005.pdf | ||
| B08.02 Attachment 1-Pricing Matrix.xlsx | XLSX spreadsheet | |
| B08.02 Attachment 2 - Wage Determination (New Hampshire).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 6
0001 07 APR 2026
W913E5
W2R2 COLD RGNS RSCH ENG LAB
KO CONTRACTING OFFICE VCCO, 72 LYME ROAD
HANOVER, NH 03755-1290
UNITED STATES
LATOSHA RODGERS, EMAIL: LATOSHA.N.RODGERS@USACE.ARMY.MIL
TELEPHONE: (217) 373-3450
SCD: PAS:
W913E526QA005
24 MAR 2026
SEE CONTINUATION
The purpose of this amendment is to add Questions and Answers in Section L and extend the solicitation closing date to 13 April 2026.
See Summary of Changes for details.
MELODIE FISHER
07 APR 2026
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
Solicitation Provisions
Additional Information/Notes
The following clauses were modified:
Instructions to Offerors-Commercial Products and Commercial Services (Feb 2026) (Deviation)
1. Quote Submission
Quotes are due no later than 12:00 PM CDT on MONDAY, 13 April 2026.
Quotes shall be submitted via email to: ERDC-CRREL-QUOTES@usace.army.mil
It is the Offeror's responsibility to ensure that its quote is complete, accurate, and submitted by the specified deadline. The Government will not make corrections to quotes. Quotes that are late, incomplete, or missing required information may not be considered for award.
A signed copy of this Request for Quote (RFQ) shall be included with the submission.
The quote must clearly demonstrate that the proposed services meet the requirements set forth in the Performance Work Statement (PWS). Quotes shall be clear and unambiguous.
2. Required Quote Content
The Offeror's quote shall include the following:
(1) Company Information
(2) Entity Identification
(3) Technical Approach
A description of the Offeror's approach to accomplishing all work outlined in the Performance Work Statement (PWS).
(4) Past Experience
The Offeror must demonstrate that it has three (3) years of experience performing fume hoods and biosafety cabinet inspection services of similar scope as described in the PWS by providing a list of at least five (5) projects completed in the past three (3) years which, at minimum, shall include for each a description of the project scope and customer details.
(5) Certification / Licensure
The Offeror shall demonstrate completion of National Sanitation Foundation (NSF) bio-safety cabinet course certification.
Supplemental Information on NSF Certification: Field testing/ certification must be performed by National Sanitation Foundation (NSF) accredited certifiers. Qualifications for the NSF certifiers include (1) a high school diploma and (2) either 1 year of experience performing field certifications and completion of a training course on biosafety cabinets or 3 years of experience performing field certification tests. The certification examination consists of a 3.5 hour written test followed by an 8-hour practical exam.
(6) Schedule
The Offeror shall indicate its ability to meet the required start date of 15 April 2026.
(7) Pricing
The Offeror shall complete the Pricing Matrix (see Attachment 1 - Pricing Matrix) in accordance with the CLIN structure provided.
The quote shall provide a firm-fixed-price, stated as a sum certain, for the completion of all requirements described in this RFQ.
3. Site Visit Requests
An escorted site visit may be arranged during solicitation period to review the area of service.
All site visit requests shall be submitted via email no later than 31 March 2026 at 16:00 PM CDT to:
The subject line of the email shall read:
"Fume Hood & Cabinet Inspection Site Visit Request"
The request shall include:
Failure to provide complete information may result in denial of site access.
4. System for Award Management (SAM) Registration and Representations & Certifications
To be eligible for award of a Department of Defense contract, Offerors must:
Representations and certifications should be completed prior to the RFQ closing date to avoid delays in award.
Offerors shall ensure that all required representations and certifications are either:
(End of provision)
Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services
Miscellaneous text in this section has been added to:
Questions and Answers (Q&A)
Question: Current certification expiration dates for the 19 fume hoods and 4 biosafety cabinets are not provided, making it not possible to propose a synchronized inspection schedule as allowed in PWS 1.2.a.
Answer: All but six of the fume hoods / BSCs have already gone beyond the annual certification date. All those six are due 10 July. Amenable to almost any schedule that gets all fume hoods and BSCs done before 10 July.
Question: The reinspection timeline of "within 15 calendar days of notification of repairs" does not specify whether the clock starts on the date the Government sends notification or the date we receive it, nor does it address weekends or federal holidays.
Answer: The 15 days starts when the Government notifies the contractor that the repairs are complete.
Question: No method of notification is specified for reporting deficiencies (email, phone, written report) or for receiving notification that repairs are complete.
Answer: Email is the preferred method of notification.
Question: Reinspection scope is undefined: if a single unit fails and is repaired, must we reinspect only that unit or perform a full recertification (face velocity, smoke, alarms) on that unit?
Answer: Provided example, if a fume hood in room 160 were to fail inspection for any reason, after the vendor is informed that repairs are complete, the vendor would return and perform a complete inspection on that fume hood.