W81EWF20466819

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to revise the Performance Work Statement (PWS) in Section C and to extend the solicitation date to 15 April 2022 at 12pm (CDT), allow ing ample time to submit revised quotes. See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W913E522Q0009

X 9B. DATED (SEE ITEM 11)

18-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Apr-2022

CODE

ERDC CONTRACTING OFFICE

HANOVER OFFICE

72 LYME ROAD

HANOVER NH 03755-1290

W913E5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W913E522Q0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS)

Installation of Thermistor Well Casings at OU4 Fort Wainwright, AK

1. Introduction. CRREL is an Army Corps of Engineers (CoE) basic research laboratory conducting research development and technology evaluation on an interdisciplinary basis to solve strategically important problems of the US Army Corps of Engineers, Army, Department of Defense (DoD), and the Nation by advancing and applying science and engineering to complex environments, materials, and processes in all seasons and climates, with unique core competencies related to the Earth’s cold regions.

This Performance Work Statement (PWS) describes the non-personal services required by the Biogeochemical Sciences Branch (BSB), Cold Regions Research and Engineering Laboratory (CRREL) located in Hanover, New Hampshire with a satellite office at Fort Wainwright in Fairbanks, Alaska. The contracted service, that includes drilling and installation of four thermistor PVC casings to a depth of approximately 150 ft, will provide supplementary resources to the Government to successfully monitor soil temperatures near Ft Wainwright, Alaska (see location in Figure 1). For this PWS, specific tasks are listed in Section 1.3.

Figure 1. Map of area of interest for drilling at Fort Wainwright, AK.

1.1 Mission. The Biogeochemical Sciences Branch at CRREL conceives, plans, and conducts research studies pertaining to the biochemical interactions of natural substances, military and industrial compounds, and emerging contaminants with earth materials such as rocks, minerals, soils, sediment, ice and liquid water under extreme environmental conditions of temperature and moisture availability in seasonal areas. Interdisciplinary investigations integrate research topic areas such as agronomy, biology, inorganic and organic chemistry, environmental engineering, geochemistry, geology, hydrology, and microbiology into a multi-disciplinary workgroup. With an emphasis placed on permanent or seasonally frozen ground, the branch conducts basic research on chemical fate and transport, site assessment, characterization, contaminated soil and wetlands cleanup, and land management. New knowledge is used to further the understanding of complex environmental system interactions over a range of temperatures and moisture content. The results are utilized to support military mission readiness by producing tools (best management plans, risk assessments, mitigation documentation, and sampling protocols) that enable effective planning and decision support. Technology is transferred to the DOD, Nation and the world through guidance documents, technical reports, journal publications, patent releases, plant variety protection releases, and equipment delivery.

1.2 Background. Biogeochemical Sciences explores Network / C3I technologies that use biological and chemical mechanisms, organisms, or processes for sensing, monitoring and reporting of fate and transport of chemicals and materials under local ecosystem conditions, and physical and chemical effects on the vegetative environment and the impact on water, soil, fauna, flora, and ecosystem. Biogeochemical sciences also exploit soil-based geospatial intelligence technologies to identify patterns and relationships in order to elicit information that improves understanding of the operational environment. This includes fusing remote sensing science and Geographical Information Systems to discover relationships between terrain, plants, microorganisms and soils in variable and/or extreme environments and investigating the phenomenology of spatial and temporal patterns for dynamic interactions from biological influences, chemical processes and hydrogeological features.

The Biogeochemical Sciences Branch executes work in all-season biogeochemical processes in earth materials in four broad areas: (1) Wide Area Assessments, (2) Civilian Intelligence, (3) Complex Regolith, and (4) Signature Management.

1.3 Scope. Four ground temperature boreholes will be drilled at four (4) locations where permafrost degradation is likely to occur during a warming climate (Figure 1). These locations will be further refined from the findings from the CRREL geophysical investigations. Subsequent installation of a solid PVC pipe in these boreholes will take place with the purpose to monitor soil temperatures over time, as a function of season, as well as long-term trends.

The thermistor casings will be installed to a depth of approximately 150 ft. If a depth of 150-feet is not feasible due to site conditions, a depth of at least 100-feet will be performed. Because the depth to permafrost varies, due to discontinuous permafrost, the actual depths of thermistor casings will be decided at the time of drilling.

The drilling method will consist of using an air-rotary system, where a dual tube casing will be used to prevent any groundwater from entering the boring. The area where the drilling will occur is considered to be contaminated so environmental and investigation-derived waste (IDW) protocols will be followed. The purpose of the drilling is not for environmental screening, however, steps will be taken to have the cuttings and debris from the drilling process to be captured in a containment system. During drilling, the cuttings will be laid on a heavy-duty tarp. CRREL personnel will screen the cuttings by a photoionization detector (PID). If levels are exceeding 20 ppm, drilling will be paused while awaiting instructions from Fort Wainwright Department of Public Works (DPW) personnel. Up to two samples, depending on the amount of cuttings collected, per boring will be taken by CRREL during drilling in order to determine if there is any contamination for the purpose of disposing the cuttings in a responsible manner. If during screening, PID results are higher than 20 ppm, the cuttings will immediately be moved to a storage facility on Fort Wainwright while awaiting results from the laboratory. For materials with PID results less than 20 ppm, the cuttings will be contained by the contractor in 55-gallon drums (or similar containment) for storage while waiting for results from the laboratory. The storage containers will be covered with a tarp. If laboratory analysis indicate that materials are hazardous waste, the materials will have to be moved to a disposal facility on Fort Wainwright. For non-hazardous waste, the materials can be spread on site.

All equipment will need to be decontaminated between boreholes to avoid cross contamination. If water is generated by the drilling contractor, the water from all four borings will be collected in separate 55-gallon drum (s) (or smaller container depending on the driller’s recommendation). The contractor is responsible to provide proper containment for the cuttings, material, and water.

A solid 1.0-inch diameter threaded, O-ring jointed PVC casing, will be placed within the boreholes, back filled with clean drilling sand and sealed with bentonite clays (or by other methods), to prevent any potential surface water from entering the boring. The PVC pipe is intended to be used to measure soil temperatures using a digital temperature string. The thermistor well surface completions will be completed as a stickup monument constructed out of a six-inch (6-in.) diameter steel pipe painted traffic yellow and set in concrete and covered using a locking.

Each monument will be surrounded by three (3) protective bollards constructed out of a four-inch (4-in.) diameter steel pipe painted traffic yellow set in concrete. Installation of two (2) reflective carsonite reflective markers set perpendicular to another at each monument will also be performed.

There is one optional task (see Option Task) that the contractor can chose to include in the bid. This task includes delivering the cuttings, material, and water to a long-term storage facility at Fort Wainwright. Moving of the materials is only needed if PID results are higher than 20 ppm, or results from the laboratory indicate that materials are hazardous waste. The facility to deliver the materials at Fort Wainwright is yet to be determined, but it will be within a 3-mile radius of the drilling site.

Depending on the access to the selected locations, the drilling and placement of the thermistors will most likely occur during June-December 2022.

2. Period and Place of Performance. Period of performance is 1 June 2022 through 31 December 2022. Contractor shall perform installation in the vicinity of the landfill at Fort Wainwright, Alaska (see Figure 1).

Unless otherwise authorized in writing by the COR or TPOC, the project site will be available for activities during normal work hours of CRREL, from 6:00AM to 6:00PM, weekdays, excluding Federal holidays. The Government reserves the right to make changes to work hours/days.

3. Performance Requirements. The following section specifies the Performance Objectives and Performance Elements for the contract.

Task 1. Installation of temperature boreholes at OU4 Fort Wainwright, AK

Four ground temperature boreholes to a depth of 150-ft will be drilled at four (4) locations where permafrost degradation is likely to occur during a warming climate (locations will be selected by CRREL personnel).

Subsequent installation of a solid PVC pipe in these boreholes will take place with the purpose to monitor soil temperatures over time, as a function of season, as well as long-term trends. Depending on the access to the selected locations, the drilling and placement of the thermistors will most likely occur during June-December 2022.

Performance Standards:

STD:

a) Four boreholes drilled to an approximate depth of 150-feet below ground surface. If a depth of 150-feet is not feasible due to site conditions, a depth of at least 100-feet will be performed. If groundwater is encountered, and concerns that the water cannot be contained in the boring, either the boring will be completed at a depth shallower than 100 feet, or a different location will be chosen for the borehole at which permafrost will more likely be present. The drilling method will consist of an air-rotary system where a dual tube casing will be used to prevent any groundwater from entering the boring.

b) During drilling, the cuttings will be laid on a heavy-duty tarp. CRREL personnel will screen the cuttings by a photoionization detector (PID). If levels are exceeding 20 ppm, drilling will be paused while awaiting instructions from Fort Wainwright Department of Public Works (DPW) personnel. Up to two samples, depending on the amount of cuttings collected, per boring will be taken by CRREL during drilling in order to determine if there is any contamination for the purpose of disposing the cuttings in a responsible manner.

If during screening, PID results are higher than 20 ppm, the cuttings will immediately be moved to a storage facility on Fort Wainwright while awaiting results from the laboratory (see Option Task). For materials with PID results less than 20 ppm, the cuttings will be contained by the contractor in 55-gallon drums (or similar containment) for storage while waiting for results from the laboratory. The storage containers will be covered with a tarp. If laboratory analysis indicate that materials are hazardous waste, the materials will have to be moved to a disposal facility on Fort Wainwright (see Option Task). For non-hazardous waste, the materials can be spread on site.

c) All equipment will need to be decontaminated between boreholes to avoid cross contamination. If water is generated by the drilling contractor, the water from all four borings will be collected in separate 55-gallon drum (s) (or smaller container depending on the driller’s recommendation).

d) The driller is responsible to provide proper containment for the cuttings, material, and water.

e) The thermistor well will be constructed from 1.0-inch diameter threaded, O-ring jointed PVC casing. The holes will be back filled with clean drilling sand and sealed with bentonite clays (or by other methods), to prevent any potential surface water from entering the boring.

f) The thermistor well surface completions will be completed as a stickup monument constructed out of a six-inch (6-in.) diameter steel pipe painted traffic yellow and set in concrete and covered using a locking

g) Each monument will be surrounded by three (3) protective bollards constructed out of a four-inch (4-in.)

diameter steel pipe painted traffic yellow set in concrete.

h) Installation of two (2) reflective carsonite reflective markers set perpendicular to another at each monument will also be performed.

i) Installation report to include field notes will be provided within 60 days after the completion of the drilling.

AQL: Completes tasks on or before the required date which are free of negligent errors and/or omissions 100% of the time.

Incentive/Remedy: Re-performance at no additional cost to the Government.

Deliverables A001 Four borings encased with PVC and well surface completion and protection of wells according to the Task 1 description.

A002 Installation report that will include field notes.

Task 2. Logging of the four (4) borings drilled in Task 1 at OU4 Fort Wainwright, AK

The stratigraphy of the soils be logged for each boring to provide a rough stratigraphy of the soils. Logging of bore logs by a geologist/geotechnical engineer or by a person with the education or work experience needed to log boreholes. The bore logs will be delivered electronically.

Performance Standards:

STD:

a) Logging of four (4) borings drilled in Task 1. The borings will include a rough stratigraphy of the soils.

b) Electronic bore logs of four borings.

AQL: Completes tasks on or before the required date which are free of negligent errors and/or omissions 100% of the time.

Incentive/Remedy: Re-performance at no additional cost to the Government.

Deliverables A003 Logging of four (4) borings drilled in Task 1.

A004 Bore log report (electronically) that will include field notes.

Option Task. Transportation of hazardous waste to storage facility

If PID results of the materials are above 20 ppm, the driller is responsible to deliver the cuttings, material, and water to a long-term storage facility at Fort Wainwright. For the materials where PID results are less than 20 ppm, the materials would only have to get transported to the storage facility until laboratory results are received. If laboratory results indicate hazardous waste, the hazardous waste materials (only from the sample locations that were hazardous waste will have to be transported to the storage facility. The facility to deliver the materials at Fort Wainwright is yet to be determined, but it will be within a 3-mile radius of the drilling site.

Performance Standards:

STD:

a) Transportation of hazardous materials to a storage facility at Fort Wainwright, AK within 10 days if PID results are above 20 ppm.

b) Transportation of hazardous materials to a storage facility at Fort Wainwright, AK within 10 days if laboratory results indicate hazardous waste.

AQL: Completes tasks on or before the required date which are free of negligent errors and/or omissions 100% of the time.

Incentive/Remedy: Re-performance at no additional cost to the Government.

Deliverables A005 Transportation of hazardous waste material with PID results higher than 20 ppm.

A006 Transportation of hazardous waste material as indicated by laboratory results.

4. Special Requirements: Anti-terrorism and Operational Security Requirements (AT/OPSEC). This section describes the special requirements for this effort. The following sub- sections provide details of various considerations on this effort.

4.1 Anti-Terrorist (AT) Level I Training: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT level I awareness training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at https:// atlevel1.dtic.mil/at.

4.2 Access and General Protection/Security Policy and Procedures: The contractor and all associated subcontractors' employees shall comply with applicable Fort Wainwright installation, access and local security policies and procedures. Policies and procedures will be provided by the Fort Wainwright Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and local policies. In additional to the changes otherwise authorized by the changes cause of this contract, should the Force protection Condition (FPCON) at any individual facility or installation change, the government may require changes in contractor security matters or processes.

4.3 For contractors who do not require CAC but require access to a DoD facility or installation. Contractor and all associated sub- contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

4.4 AT Awareness Training for Contractor Personnel Traveling Overseas: All US based contractor employees and associated subcontractor employees traveling overseas will receive the government provided AOR specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure.

4.5 iWATCH Training: The contractor and all associated subcontractors shall brief all employees on the ERDC iWATCH program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within

45 calendar days of contract award and within 45 days of new employees commencing performance on the contract.

The contractor shall provide certification of completion to the COR within 10 days of training completion. Training documents will be provided by the ERDC Security Office.

4.6 OPSEC Standing Operating Procedure/Plan: The contractor and all associated subcontractor' employees shall comply with applicable ERDC OPSEC plan and requirements to include initial OPSEC briefing within 30 calendar days of the reporting to duty and annual training.

4.7 Requirement for OPSEC Training: All new contractor employees will complete Level I OPSEC Training with 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:

https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html.

4.8 Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

5. Government Furnished Support:

a) Government Laptops or IT: not required

b) CAC Cards: not required

c) Access to ERDC IT Systems: not required

d) Access to Government Installations: Yes, Fort Wainwright Alaska

e) Access to Government Information: not required

f) Access to Federal or DOD Facilities / Lands: Yes, Fort Wainwright Alaska

g) Government Furnished Materials: hazardous waste storage space

6. Contracting Officer’s Representative (COR). The identification of duties and limitations of the COR are specified in the COR appointment letter, which will be provided to the contractor at or shortly after the time of award. No Government personnel, other than the Contracting Officer, shall have the authority to do other than clarify technical points or supply relevant information to the Contractor regarding this contract. Specifically, no requirement in these specifications may be altered through verbal clarification. Only a warranted Contracting Officer, acting within their appointed limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer will be at the Contractor's own risk. The offeror is reminded that if this project coordinates with other governmental organizations or stakeholders regarding this contract, then the COR and TPOC should be made aware of such meetings. CRREL’s TPOC and COR may wish to participate. The offeror is also reminded that only CRREL’s Contracting Officer has the authority to modify the scope, schedule, deliverables, etc. of this contract.

Contracting Officer’s Representative (COR) Role

Gary Larsen Gary.W.Larsen@usace.army.mil

(907) 361-3309

COR

7. Technical Point of Contact (TPOC). TPOCs offer technical backgrounds as subject matter experts (SMEs) in areas relevant to the contract. TPOCs provide value added technical feedback to the vendor and contractor performance feedback to the COR. TPOCs may coordinate with the contractor to consult, support execution, assist with access to necessary government data, hardware, or supplies, review monthly progress reports, review deliverables, and act as the government sponsor where engagement with other government entities is required (e.g., site access, product transition). TPOCs shall always include the COR on correspondences, telecons, and communications with the contractor so the COR can document exchanges. Likewise, the vendor shall always include the COR on correspondences, telecons, and communications with all government employees regarding this contract. The offeror is also reminded that only CRREL’s Contracting Officer has the authority to modify the scope, schedule, deliverables, etc. of this contract.

Technical Points of Contact (TPOCs) Role

Anna Wagner Anna.M.Wagner@erdc.dren.mil

(907) 227-5452

Lead CRREL TPOC

8. Invoicing instructions. The Contractor’s invoice shall not be submitted to CRREL or WAWF until the TPOC and COR have received, reviewed, and accepted all the products listed in the invoice. Invoices received prior to product approval will be rejected. To ensure prompt payment of invoices, the Contractor shall inform their billing office of these two critical invoice submission steps. Failure to follow these two steps may result in payment delays:

1. Email Invoice: Email a PDF of your company’s invoice to the COR and TPOC COR: Gary.W.Larsen@usace.army.mil TPOC: Anna.M.Wagner@erdc.dren.mil

2. WAWF Invoice Notice: On the same day, submit your invoice to WAWF following instructions outlined in Section G of the awarded contract. While in WAWF, you must also add the following two email addresses to the final step “Send WAWF Invoice Email Notifications to Others”:

Invoice Acceptor: Jacqueline.A.Walker@usace.army.mil Invoice Acceptor: Gary.W.Larsen@usace.army.mil

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 07-APR-2022 TO

31-DEC-2022

N/A PR W2R2 COLD RGNS RSCH ENG LAB

ANNA WAGNER

USA CRREL - AKRO

BUILDING 4070, 9TH STREET

FT. WAINWRIGHT AK 99703

907-361-5459 FOB: Destination

W14GQK

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-JUN-2022 TO

31-DEC-2022

N/A PR W2R2 COLD RGNS RSCH ENG LAB

ANNA WAGNER

USA CRREL - AKRO

BUILDING 4070, 9TH STREET

FT. WAINWRIGHT AK 99703

907-361-5459

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

POP 01-APR-2022 TO

31-DEC-2022

N/A PR W2R2 COLD RGNS RSCH ENG LAB

ANNA WAGNER

USA CRREL - AKRO

BUILDING 4070, 9TH STREET

FT. WAINWRIGHT AK 99703

907-361-5459

To:

CAGE

POP 01-JUN-2022 TO

31-DEC-2022

N/A PR W2R2 COLD RGNS RSCH ENG LAB

ANNA WAGNER

USA CRREL - AKRO

BUILDING 4070, 9TH STREET

FT. WAINWRIGHT AK 99703

907-361-5459

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS FOR OFFERORS

QUOTES ARE DUE BACK TO ERDC-CRREL-QUOTES@usace.army.mil and

KIM.D.ROBERSON@USACE.ARMY.MIL BY 12:00 PM (CDT) ON FRIDAY, APRIL 15, 2022.

It is the offeror’s responsibility to ensure that the quote is submitted complete, accurate and based on the terms of this RFQ. The vendor is requested to provide clear quotes to ensure the technical experts see that offered services will meet all the required standards.

A signed copy of this RFQ shall be included in your submission. The quote shall also address the following:

Provide a Point of Contact (POC), including phone numbers and email addresses, who have authority to make decisions for the company.

Provide the company’s CAGE code and/or DUNS/Unique Entity Identifier (UEI) number.

Verifies you are capable of providing all services outlined in Section C, Performance Work Statement (PWS).

Quotes that are ambiguous or are missing required information may be disqualified.

Your quote should contain your best terms. The Contracting Officer may reject any or all quotes. The Contracting Officer may issue a purchase order to other than the quoter with the lowest price.

Offerors are required to have an active System for Award Management registration, no active exclusions, and BOTH FAR AND DFARS representations and certifications completed in order to receive a Department of Defense contract award. Representations and certifications should be completed by the RFQ closing to avoid any unnecessary delays in contract award. Depending on the needs of the requiring activity, the Government may or may not provide additional time to register with SAM. Ensure that all representations and certifications required by this Request for Quote are either included in the online FAR and DFARS report and/or included with your quote submission.

SITE VISIT POC

To perform a site visit, please contact the Technical Point of Contact (TPOC), Anna Wagner, anna.m.wagner@erdc.dren.mil, (office) 907-361-5459.

(End of Summary of Changes)