ATTACHMENT 1_PRS.docx

DOCX document 21 KB Posted

Attached to
NGB Furniture Services and Materials
Solicitation number
W9133L-20-R-2005
Issued by

View the file

Other files

File Type Posted
W9133L-20-R-2005-0001.docx DOCX document
Attachment 2_Deliverables.docx DOCX document
JA Furniture IDIQ_Final25Nov19_Redacted.pdf PDF
Attachment 7 AHS1 Furniture Standards.pdf PDF
W9133L-20-R-2005.docx DOCX document
ATTACHMENT 6_FurnitureAtticStockWalls.docx DOCX document
ATTACHMENT 5_FurnitureAtticStockBldg2.docx DOCX document
ATTACHMENT 4_PlacesModel.docx DOCX document
Attachment 8 AHS2 Furniture Standards.pdf PDF
ATTACHMENT 3_Bldg1Compose.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

1.4.6 Security Security Requirements

(SEE PWS)

100% performance
100% performance as outlined. 0 Defects.
Random Monitoring - Review of records by COR or designee.

1.4.16 Safety Safety Requirements

(SEE PWS)

Compliance with all regulations and industrial safety responsibilities required by OSHA, Army EM 385-1-1, and the Commonwealth of Virginia.
Safety requirements must be adhered to 100%
Random Monitoring - Review of records by COR or designee.

5.2.1 Labor, Disassembly The Contractor shall disassemble systems/modular furniture as specified by project. It may be required to prepare the disassembled product for re-use, disposal and/or transport. Projects may require the product to be neatly placed and/or stacked either within the room or elsewhere outside the room. It may also require a written listing of the product (part, description, size, fabric, color, quantity, and condition) to be provided to Government COR. Contractor may also be required to attach paperwork on to the furniture (usually Government provided storage permits and/or product identification papers). During work in progress, the work area is to be maintained neat and safe, free from accumulation of waste materials and/or debris and with minimal noise disturbance and interference to Government operations and personnel. At completion of project, the work area shall be left clean, neat and orderly.

-Disassembled and placed in a manner for minimal loss and damage so product can be reassembled.

The Contractor shall perform disassembly without loss or damage to components for each project.
5% loss or damage to the total number of components for each project
Damage 100% Inspection – COR or designee for each Call Order.

The Contractor shall perform disassembly within the established timeframes on each project compliance with the minimum basis period of accomplishment listed below:

The periods of accomplishments will be determined as follows:

Disassembly of 1-14 workstations: 1 calendar day.

Disassembly of 15 or more workstations: 1 calendar day per 14 workstations.

90% compliance with established timeframe

Disassembly 100% Inspection – COR or designee for each Call Order.

The Contractor shall maintain a neat and safe work area, free of accumulation of waste materials and/or debris with minimal noise disturbance and interference to Government operations and personnel.
Performed with zero (0) complaints on waste and/or noise.
Noise/ Waste by

Customer Complaints – COR or designee for each project.

5.2.2 Labor, Installation

The Contractor shall install/place the systems/modular/freestanding furniture per drawing or instructions as specified by project and in accordance with industry/manufacturer standards for a safe and functional installation. An installation drawing may either be provided by Contractor and approved by Government COR or provided to Contractor by the Government. The drawing may be detailed with specific instructions or it may be limited in detail and the Contractor shall be responsible for how best to meet the intent from available product. During work in progress, the work area is to be maintained neat and safe, free from accumulation of waste materials and/or debris and with minimal noise disturbance and interference to Government operations and personnel. At end of install, the work area shall be neat, free of debris, vacuumed, and the inside and outside of furniture components wiped down with dust cloth and appropriate cleaner. Prior to completion of project, a punch listing of any deficiencies should be provided to and reviewed with COR to determine resolution.
The Contractor shall install/place in a manner per Government approved drawing/instructions and in accordance with industry/manufacturer standards for a safe and functional installation. Electrified panels when necessary to the end result shall be inter-connected and attached to the electrified whip provided. Task lights, keyboard trays, overhead bins, storage cabinets shall be operational. Surfaces and the inside and outside of components shall be wiped down with dust cloth and cleaner:

The periods of accomplishments will be determined as follows:

Installation of 1-7 workstations: 1 calendar day.

Installation of 8 or more workstations: 1 calendar day per 7 workstations.

98% of work IAW industry/manufacturer standards

90% compliance with established timeframe

Installation 100% Inspection – COR or designee for each project.

Essential components such as panels, work surfaces and in some cases, overhead bins must be in place on the agreed upon date so tenant could occupy and use the space without major disruption after occupying. Touch-up may be needed and non-essential parts and components such as trim/cover pieces may not be in place, but a punch list with an install/correction date of any deficiencies should be provided to COR.
Punch list includes only minor trim/ cover pieces with zero (0) defects on the installation of essential components.

Punch List 100% Inspection – COR or designee for each project.

The Contractor shall maintain a neat and safe work area, free of accumulation of waste materials and/or debris with minimal noise disturbance and interference to Government operations and personnel.
Performed with zero (0) complaints on waste and/or noise.

Noise/ Waste by Customer Complaints – COR or designee for each project.

5.2.3 Labor, Delivery/Moving/Transportation Contractor shall move/transport the Government owned furniture within a building or between separate locations separate locations, Contractor’s warehouse, leased facility(s), or military installation(s) within the National Capitol Region (NCR). Projects may require product to be delivered to/received at a warehouse, storage or job site location. Though rare, there may be times that Contactor shall make provisions to hold/temporarily store product in a Contractor provided facility/location as specified by project. To facilitate move/transports between buildings, Contractor shall provide appropriate vehicle(s) and manpower for loading and off-loading. Contractor shall provide any driver/truck information as required by the building/installations loading dock official in advance and within the time frame required.

-Arrive in same condition as it departed.

-Minor loss and damage so product can be re-used.

The Contractor shall perform delivery/moving/transportation without loss or damage to components.

5% loss or damage to the total number of components for each project.

Damage 100% Inspection – COR or designee for each project.

5.2.4 Labor, Miscellaneous/Skilled Labor The Contractor shall provide various levels of Miscellaneous/skilled labor as specified by a project. Labor services include, but are not limited to, cleaning, minor refurbishment, padding, packing, crating, palletizing, shrink-wrapping, inventory listing, moving, pickup, delivery, loading, off-loading, repositioning, disposal, debris removal, and uncrating. Contractor shall furnish all packing, crating, and padding materials as necessary to meet the requirements specified by project. Contractor shall provide on an as-needed basis, as specified by project, site surveys, measuring, cleaning, touch-up, minor repair or modifications to systems, modular or freestanding furniture items.

These services may include, but are not limited to, conducting detailed inventory of Government furniture, tracking and maintaining the inventory to assure proper counts, condition and disposition, checking and reconciling physical counts with written counts, communicating and coordinating with warehouse personnel regarding deliveries to and from warehouse, receiving deliveries on behalf of the Government, conducting disposal activities and any various activities to help the Government monitor and maintain their inventory.

As the required services are varied, the end result must fulfill the requirement of the project.

The Contractor shall maintain a neat and safe work area, free of accumulation of waste materials and/or debris with minimal noise disturbance and interference to Government operations and personnel.
Performed with zero (0) complaints on waste and/or noise.

Noise/ Waste by 100% Inspection – COR or designee for each project.

5.3 Furniture

This task includes procurement of Haworth, Inc. brand, or equivalent, modular and ancillary furniture for workstations, private offices, and other building spaces such as conference rooms, break rooms, and public areas.
The Contractor shall procure furniture with the GSA negotiated rates.
100% performance as outlined. 0 Defects.
Periodic Surveillance – COR or designee for each project.

5.4 Demountable-walls

Demountable-walls are found in TARC Building 2. This task includes procurement of Haworth, Inc. brand, or equivalent and 100% compatible, demountable-walls.
The Contractor shall procure furniture with the GSA negotiated rates.
100% performance as outlined. 0 Defects.
Periodic Surveillance – COR or designee for each project.

5.5 Design/Reconfiguration The Contractor shall provide various levels of design, consultation, specification and reconfiguration solutions as specified by project. Some designs may be a single oral consultation to determine reconfiguration solution and then create a product pull list for implementation. Other designs may require two meetings; the initial meeting with the Government COR/end user who is receiving reconfigured furniture, and the second meeting to present the design solution. Contractor may need to provide and/or change a design solution based on available product. Drawings may range from hand sketches of a measured floor plan with or without a product listing to formal AutoCAD designs requiring detailed product specifications. Projects may require Contractor to survey/measure the site and advise Government of potential non-fit. All designs shall adhere to appropriate building and life/safety codes. Design solutions must fit the space, be functional, initially use parts from inventory and/or identify deficiencies for parts to order. Services may also include the development of phasing timelines/plans for large furniture installation efforts.

-Solution must be clear, to level of detail necessary to convey the desired result, and presented in a manner that can be understood by Government COR.

The Contractor shall perform the design and deliver the final product that is in compliance with all regulations and industrial safety responsibilities required by OSHA, Army EM 385-1-1, and the Commonwealth of Virginia.

Performed within a maximum of 10 business days for each project.
100% Inspection – COR or designee for each project.

5.6 Storage The Contractor shall provide storage of all Government owned Attic Stock. The Contractor is required to perform the following under the performance of this continuous task:

· Provide a detailed Monthly inventory of Attic Stock

· Update inventory of Attic Stock after each project

· Provide recommendations for additional attic stock materials based on use of products and remaining stock levels

-Storage facility must be secure and materials properly accounted for at all times.

-Facility must be climate controlled to ensure materials are not damaged.

-Facility is subject to inspection by the Government at any mutually agreed date and time.

-Movement of Attic Stock is only authorized by the Contracting Officer’s Representative and detailed records of the movement of the materials must be submitted by the Contractor to serve as a record.

- Inventory Reporting. The Contractor shall provide the current inventory of attic stock in PDF or MS Excel format to the COR on a monthly basis. In addition, the COR may request a current inventory, outside the monthly reporting, at any time during the performance of the contract.

Monthly Inventory report(s), IAW AR25-50, complete and provide the required information.
Inventory report(s) submitted to the COR within 5 working days following the end of the month
Reports by 100% Inspection – COR or designee.

Government property in a secure climate controlled area.

100% Zero (0) defects due to loss by security or climate control.

Storage by Periodic Surveillance – COR or designee for each project.

5.7 Inventory Reporting
The Contractor shall provide the current inventory of attic stock in PDF or MS Excel format to the COR on a monthly basis.
The Contractor shall submit inventory report(s) timely, accurately, completely and provide the required information.
90% of reports are turned in by the 5th of the month.
100% Inspection by COR or designee
5.8 Monthly Service Day
Contractor shall schedule one day each month to spend at TARC performing minor miscellaneous work including but not limited to touch-up, minor repair, minor modifications, delivery of an item from attic stock, removal of an item, etc.
The Contractor shall complete one service day per month.
90% of service days are done in the month they correlate to.
100% Inspection by COR or designee

5.9 Contractor Manpower Reporting (CMR)

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://cmra.army.mil.
The Contractor shall submit CMR report(s) timely, accurately, completely and provide the required information.

90% of reports are turned in on time to the CMR website.

Periodic Surveillance – COR or designee.