Waterproofing membrane RFI Q11.pdf

PDF 347 KB Posted

Attached to
TARC Locker Room Renovations Federal contract opportunity
Solicitation number
W9133L-20-B-4001
Issued by
Department of the Army National Guard Readiness Center

About this file

This package includes construction drawings and specifications for locker room renovations at the Temple Arlington Readiness Center-1 building. The project will involve replacing floor tiles, drywall work, wall tiles, solid surface walls, toilet and shower partitions, plumbing and electrical fixtures, ceiling work, and supply/return grills. Drawings provide details on wall sections, enlarged toilet area plans, and notes specifying waterproofing membrane application. The solicitation seeks bids for locker room renovations generally in accordance with the drawings and statement of work. Work will update locker rooms last renovated in 1995. The National Guard Bureau is the contracting agency.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47"

47"

" 4

A-22

A-22

A-22

A-23

A-23

A-23

A-23

A-24

A-25

58" TALL

ESS3

PARTITIONS

AL

IG

N

AL

IG

N

D1 A-26

SHEET NUMBER:

PROJECT NUMBER:

SHEET TITLE:

SHEET SIZE:

DRAWN BY:

DATENO. DESCRIPTION

KEYPLAN:

PROJECT INFORMATION:

DRAWING SCALE:

30x42

TEMPLE ARNG READINESS

CENTER

111 S GEORGE MASON DR

ARLINGTON, VA 22204

DATE:

PROPERTY OF THE UNITED STATES GOVERNMENT.

FOR OFFICIAL USE ONLY. PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED. DO NOT REMOVE THIS NOTICE.

TARC #1 LOCKER

ROOMS UPGRADE

00/00/00 -

AS

19-0088 04/24/2020

1/2" = 1' - 0"

PARTIAL FLOOR PLAN - MEN'S

LOCKER ROOM- NEW

PARTITION PLAN

A-15

SHEET 16 OF 42

LOADING DOCK AREA

EAST WING - AHS 1

ATRIUM

WEST WING - AHS 1

EAST PARKING

GARAGE

AHS 2

WEST PARKING

GARAGE

PATIO

AREA OF WORK

1/2" = 1'-0"

PARTIAL FLOOR PLAN- MEN'S LOCKER ROOM- NEW PARTITION PLAN

N

SHEET NOTES:

1. REFER TO SHEET CS-1 FOR GENERAL NOTES.

2. REFER TO SHEETS A-22, A-23 AND A-24 FOR WALL SECTION

DETAILS.

3. REFER TO SHEET A-25 FOR ENLARGED VIEW OF THE TOILET

AREA WITH NOTES.

17 18

G.1

H

For the wall highlighted in green. Apply the water proofing membrane only on the wall below the counterop

A-22

A-24

A-25

D1 A-26

E1 A-26

A-22

A-22

SHEET NUMBER:

PROJECT NUMBER:

SHEET TITLE:

SHEET SIZE:

DRAWN BY:

DATENO. DESCRIPTION

KEYPLAN:

PROJECT INFORMATION:

DRAWING SCALE:

30x42

TEMPLE ARNG READINESS

CENTER

111 S GEORGE MASON DR

ARLINGTON, VA 22204

DATE:

PROPERTY OF THE UNITED STATES GOVERNMENT.

FOR OFFICIAL USE ONLY. PROPERLY DESTROY DOCUMENTS

WHEN NO LONGER NEEDED. DO NOT REMOVE THIS NOTICE.

TARC #1 LOCKER

ROOMS UPGRADE

00/00/00 -

AS

19-0088 04/24/2020

1/2" = 1' - 0"

PARTIAL FLR PLAN - WOMEN'S

LOCKER ROOM- NEW

PARTITION PLAN

A-16

SHEET 17 OF 42

LOADING DOCK AREA

EAST WING - AHS 1

ATRIUM

WEST WING - AHS 1

EAST PARKING

GARAGE

AHS 2

WEST PARKING

GARAGE

PATIO

AREA OF WORK

1/2" = 1'-0"

PARTIAL FLOOR PLAN- WOMEN'S LOCKER ROOM- NEW PARTITION PLAN

N

19 20

G.1

H

SHEET NOTES:

1. REFER TO SHEET CS-1 FOR GENERAL NOTES.

2. REFER TO SHEETS A-22, A-23 AND A-24 FOR WALL SECTION

DETAILS.

3. REFER TO SHEET A-25 FOR ENLARGED VIEW OF THE TOILET

AREA WITH NOTES.

For the wall highlighted in green. Apply the water proofing membrane only on the wall below the counterop

WATERPROOFING MEMBRANE FROM FLOOR TO FINISHED

CEILING AS INDICATED IN THE WALL SECTIONS

WATERPROOFING MEMBRANE ON THE WALL UNDER THE

COUNTER