SOLICITATION W9133L20-B-4001 RFIs and Answers.pdf

PDF 78 KB Posted

Attached to
TARC Locker Room Renovations
Solicitation number
W9133L-20-B-4001
Issued by

About this file

This document contains questions and answers related to a solicitation for locker room renovations at the Temple Arlington Readiness Center. The solicitation seeks a contractor to perform work including new floor tiles, drywall, wall tiles, solid surface walls, toilet and shower partitions, fixtures, ceiling work and replacement of supply and return grills. Bids are due by July 23rd at 4:00 pm and work must be conducted between 6:00 pm and 4:00 am to avoid disrupting normal business hours. The renovation involves two phases and storage will be provided on site between phases. Safety protocols require masks in public areas and contractors should not come on site if experiencing COVID-19 symptoms.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W9133L‐20‐B‐4001 TARC Men’s/Women’s Locker Rooms Pre‐Bid Inquiries

Q1. Drawing A‐15 ‐ Note 10 regarding Urinal Screens appears to be missing from the page. Please clarify.

A1. Sheet A‐15: Note 10 Urinal screen information is covered under sheet A‐25 (Note 10 should not have shown up on sheet A‐15). Sheet A‐25 (Enlarged plan of restroom areas) is referenced on sheet A‐15.

Q2. Drawing A‐16 ‐ Wall Section Details 10/A‐22 & 11/A‐22 are not shown on Drawing A‐22. Is it possible that these details are intended for plan A‐24?

A2. Sheet A‐16: Yes. The wall section details should be 10/A‐24 & 11/A‐24

Q3. General Comment ‐ It is unusual to set the deadline for RFI's before the pre‐bid site visit. Will this deadline be extended so that any questions arising from the site visit can be submitted for responses?

A3. Per the solicitation NOTICE TO BIDDERS – paragraph 4.3 ‐ All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to bid opening.

Q4. Can we courier all the documents except the price sheet in advance and email the price sheet on or before the cutoff date/time. Or can we email the bid package before the date/time.

A4. No, the entire package will need be received as one package on or before the bid opening deadline

– emails are not authorized. In an effort to accommodate afternoon deliveries, the bid due date will be changed to Thursday, 23 July – 4:00 p.m. This will be incorporated via an Amendment.

Q5. Please confirm the base access requirements so that we can plan accordingly.

A5. Due to security conditions, the following are the requirement for base access at Selfridge Air National Guard Base, MI. The following information must be emailed to kirk.m.swiantek.civ@mail.mil no later than 3 days prior to the bid opening:

Visitor's Full Name Driver's License Number – State Issued Date of Birth Gender Race Citizenship

This information will be provided to the Base Security Forces who will authorize your entrance to the site. Visitors must pick up their passes at the Installation's Main Entry Gate (M‐59 / Rosso Hwy Road Gate) prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Valid Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. The Bid Opening will be at Building 105; Contracting Conference Room.

Q6. The solicitation notes normal work hours are (0700 – 1600), but within the general information the work hours are noted as being non‐business (1800 – 0400) work hours. Please confirm if the work is to be performed during or outside of normal business hours.

A6. Work is to be conducted outside normal working hours between 1800‐0400.

Q7. Because of the requirement to submit written bids with an electronic copy to an out of state location, normal means of modifying the bid have been negated. FAR typically allows for modification of a bid, prior to opening, by a designated means. How are bid to be modified, if necessary?

A7. If you desire to change your bid prior to bid opening, an entire new package must be received and the package with the latest postmark date will be considered the responsive bid.

Q8. Drawings neither suggest nor specify replacement of ceiling grid, except for light fixtures. Please confirm ceiling grid is to be reused.

A8. Ceiling grid to be reused.

Q9. Drawings neither suggest nor specify replacement of sprinkler system components (E‐1 designates sprinkler heads to remain). Trim rings and concealed head covers will be impacted by ceiling removals.

Please confirm the extent of sprinkler work required. Note: sprinkler heads are not shown in any of the drywall ceiling areas.

A9. Intent is not to move/remove any sprinkler heads. Trim rings/head covers may be reused.

Q10. RE: C1/A26 – please identify “#390 ”. A manufacturer and product line should be sufficient.

A10. Salient characteristics are provided in the SOW, this clarification is provided due to possible confusion for Burke Square Top Finishing Cap #390 or equivalent based on the salient characteristics.

Q11. RE: 11/A24 Laticrete waterproofing is noted on finished drywall, typical wall section. Please confirm waterproofing is required only behind ceramic tile and ESS finishes.

A11. Refer to SOW 2.2.10 and attached sketch for clarification.

Q12. Is there space on site to store materials (e.g. lockers) between need in Phase 1 and Phase 2?

Space for a remote, onsite storage trailer?

A12. Yes, there is a lockable room in the East parking garage that will be available for use.

Q13. COVID‐19 related restriction on contractor activity at federal bases is inconsistent across the region. Please clarify what requirements will be necessary for this work? Must masks be worn in public spaces, or at all times? Are temperature checks required? How are employees to be admitted within the facility? Must employees be escorted while within the facility? How will deliveries be coordinated during the 6pm‐4am work hours?

A13. Currently, masks should be worn in the public hallways/restrooms/etc. but up to Contractor's discretion on the jobsite itself. Temperature checks are not required at this time, however Contractors should not come on site if they or a family member have experienced any symptoms of COVID 19 in the last 14 days (guards will ask these questions at the gate). Contractors will submit the request for access paperwork (included as an attachment in the original package) and will receive a building badge. Once they have a badge an escort is not required. Due to the current COVID‐19 procedures, Contractors are to provide a list of visitors (no badge) coming onsite to PMO daily, to include delivery truck drivers. Loading dock is not open outside normal daytime business hours, Contractors are to provide a representative during the day to receive the delivery. While the building is empty for COVID 19 daytime work is permitted, but this would change if the building completely reopens.