CFMO_Contract_-_PWS_-_Tech_Exhibit_1.docx

DOCX document 14 KB Posted

Attached to
Construction & Facilities Management Officer (CFMO) Support Services
Solicitation number
W9133L-15-R-0004
Issued by

About this file

Supporting technical information.

View the file

Other files

File Type Posted
CFMO_Contract_-_PWS_Summary.docx DOCX document
CFMO_Contract_-_PWS_-_Tech_Exhibit_2.docx DOCX document
MARKET_SURVEY_RFI_CFMO_8A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS TECHNICAL EXHIBIT 1

Performance Requirements Summary Construction and Facilities Management Officer (CFMO) Support The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PWS Paragraph
Task
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
5.1.5.1
MILCON Program Assistance
The contractor will provide the technical resources necessary to participate in site visits to State CFMO organizations to assist and support their MILCON program execution and management. The contractor will provide technical assistance to installation personnel concerning the utilization of program scoping and project planning documents.

Subject Matter Expert (SME) support will be provided in the areas of military construction design and construction requirements.

(1) Development of initial strategy recommendations for execution.

(2) Evaluate project alternatives; and

(3) Understand work classification and fiscal law implications.

Travel to assess facility damage (as needed) to facilitate working estimates and follow-on actions. Contractor must include a (i) summary report in narrative form about the situation, findings and (ii) recommendations on the appropriate course of action.

COR and Branch Chief

5.1.5.2
Technical Support on Design and Construction Contracts
Provide assistance to the State CFMO in the acquisition process to select an Architect-Engineer (A-E) firm to support MILCON project design/construction activities. Also, if required act as the Master Planning and Programming Charrette Facilitator in accordance with Federal Acquisition Regulation (FAR). The State CFMO will select an A-E from the firms of the NGB (ANG/ARNG) National Indefinite Delivery/Indefinite Quantity (IDIQ) A-E contract.
The A-E general source selection requirements have been satisfied by the NGB Source Selection Board. The specific project source selection will be from the following criteria: (a) Location to the specific project, (b) Volume of Department of Defense work being performed and (c) Small Business Participation with regional firms.

Must provide a report summarizing the issues and recommendations from the Charrette.

COR and Branch Chief

5.1.5.3
Travel SAV to State or Territory
Travel requirements in support of Task 1 and 2 are expected to be eighty-five percent (85%). All travel shall be accomplished IAW the Joint Travel Regulation (JTR) in effect at the time of the travel. There is a possibility that travel will be required to any of the fifty (50) States, Guam, Puerto Rico, the Virgin Islands and the District of Columbia during the execution of this task.
Contractor shall travel and provide SME support to State CFMO organizations with surveys, studies, analysis, investigations, and other technical support as required.

Trip vouchers, receipts, etc. shall be submitted to accompany and support monthly billings.

COR and Branch Chief