Amendment 0001 to Solicitation W912WJ27QA005

This is Amendment 0001 to a Request for Quote (RFQ) issued by the U.S. Army Corps of Engineers (USACE), W2SD ENDIST New England KO Contracting Division in Concord, Massachusetts. The amendment extends the response due date from November 23, 2026 to November 24, 2026 at 2:00 PM Eastern and establishes a deadline of November 23, 2026 at 2:00 PM Eastern for submission of questions, with Government responses provided by this amendment. The effective date of the amendment is November 20, 2026. The solicitation addresses snow plowing, shoveling, and sanding services for Blackwater Dam in Webster, New Hampshire, managed under a firm fixed-price contract structure with a base year and two option years.

The amended bid schedule requires pricing for three line items across each contract period: (1) Snow Plowing—24 services per period at a unit price of "Each"; (2) Snow Shoveling—24 services per period at "Each"; and (3) Sanding/Salting Operation—12 services per period at "Each." Key clarifications provided address service invoicing limits based on storm accumulation, equipment storage restrictions (no temporary staging permitted), mandatory in-person attendance at pre-work conferences, use of road-grade sand only (no chemical de-icers or salt permitted), 4-hour emergency response windows, and safety submittal review procedures. The amendment confirms that FAR 52.219-14 (Limitations on Subcontracting) is not applicable, that subcontractors may perform all field work and serve in designated safety roles, that Wage Determination 2015-4023 Rev. 36 applies to the base year, that 60 calendar days is an acceptable quote acceptance period, and that no insurance minimums are required. All documents must be submitted by email prior to closing with no specific subject line requirement, though Google Drive and cloud documents are not accepted.

View the file

Other files

File Type Posted
Solicitation Survey 27QA005.pdf PDF
Solicitation W912WJ27QA005.pdf PDF
Attachments 27QA005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date

23 Nov 2026 24 Nov 2026

Miscellaneous text in this section has been added to:

REQUEST FOR INFORMATION:

Question 1: Pre-Work Conference Location & Virtual Option (PWS Section I.6). PWS Section I.6 states that the Contractor's Project Manager and Quality Control Personnel must be physically present at the Pre-Work Conference. Could the Government clarify the exact physical location where this conference will be held (e.g., Blackwater Dam Project Office in Webster, NH or USACE District Headquarters in Concord, MA)? Additionally, will the Government permit executive leadership to participate via teleconference/Microsoft Teams provided an authorized local operational representative is physically present?

Response 1: Reference the Performance Work Statement, "Pre-Work Conference". The pre-work conference location is generally 43 White Plains Rd., Webster, NH. Any attendees shall be in person, attendance via teleconference/virtual is not permitted.

Question 2: Walkway De-icing vs. Salt Prohibition (PWS Part 3.2.2 & Part 4.4.2.3). PWS Part

3.2.2 strictly prohibits the use of salt in sand spread at any service location. However, PWS Part

4.4.2.3 states that sand shall be spread on icy shoveled walkways. Is non-salt chemical ice melt (e.

g., calcium chloride or eco-friendly de-icer) permitted for pedestrian walkway safety on concrete entrances, wooden decking, and steps, or is road-grade sand the only authorized material permitted across all surfaces? If chemical de-icers are allowed, should their cost be included under CLIN 0002 (Snow Shoveling) or CLIN 0003 (Sanding)?

W912WJ27QA0050001

Response 2: All sand used in the performance of this requirement shall be road grade sand as required by the Performance Work Statement. No other products are permissible.

Question 3: CLIN Unit Invoicing for Multi-Pass Storm Events (PWS Part 4.2.2 & Section B Bid Schedule). PWS Part 4.2.2 outlines service caps based on storm accumulation (e.g., 2"-6" = up to 1 service; >6"-12" = up to 2 services; >12"-18" = up to 3 services; >18" = up to 4 services). Can the Government confirm that each separate clearing pass requested and performed during a multi-pass storm event will be invoiced and paid as an individual unit ("Each") under Line Items 1 and 2 at the awarded contract unit price?

Response 3: Correct, the unit price for plowing or shoveling shall be invoiced as awarded in the bid schedule. This unit price shall be used for each separate service provided up to the number of services permitted based on storm totals. For example, a storm over 6 inches to 12 inches could be billed for a maximum of two services.

Question 4: Emergency Call-Out Dispatch & Response Window (PWS Part 4.2.5 & Part 4.3.1).

PWS Part 4.2.5 requires the Contractor to perform additional requested plowing within 4 hours of notification by the Technical Point of Contact (TPOC). Will emergency call-out notifications outside normal working hours be issued via telephone or written email, and does the 4-hour response clock commence upon direct verbal/written confirmation of receipt by the Contractor?

Response 4: The Contractor and Technical Point of Contact shall determine notification processes after Contract award. The 4 hour clock commences upon notification by the TPOC to the Contractor, not upon verbal/written notification of receipt by the Contractor.

Question 5: On-Site Equipment Staging During Active Storm Events (PWS Part 1.8 & Part 2.3).

PWS Part 2.3 states that the Government will not provide equipment storage. Will temporary staging of primary plowing vehicles and sanders be permitted in designated areas (such as the West Dam Crest parking lot) during active, multi-day winter storm events, or must all equipment be demobilized from federal property immediately upon completion of each individual service pass?

Response 5: Per the Performance Work Statement, no storage will be provided by the Government for Contractor equipment. This includes during temporary staging. All equipment shall be removed from federal property immediately upon completion of each individual service pass.

Question 6: Safety Submittal Review Timeline & Field Mobilization (PWS Section I.5 & Section II.

2). PWS Section I.5 mandates that all pre-work safety submittals (APP ENG Form 6293, AHA

ENG Form 6206, SSHO ENG Form 6282) be submitted within 14 days of award, with USACE reserving up to 7 days for review. If contract award occurs immediately prior to or during an active snowfall season, will the Government issue a conditional Notice to Proceed (NTP) for field operations prior to final APP acceptance in the event an urgent storm occurs during the 7-day review window?

Response 6: The Contractor is not permitted to commence field work until all submittals are approved and accepted. A conditional Notice to Proceed shall not be issued.

Question 7: Item 3 on the Bid Schedules for the Base Year, Option Year One and Option Year Two (pages 3 to 5) is titled "Sanding/Salting." The Performance Work Statement, Part 3, paragraph 2.b (page 16), states: "Salt shall NOT be used in the sand that is spread at any of the service location areas. Sand shall be road grade sand." Can you confirm that Item 3 is for road-grade sand only, and that no salting services or salt should be included in our pricing for that item?

Response 7: See response to question 2 above. The Bid Schedule has been revised to remove any reference to salt.

Question 8: Limitation on subcontracting (Section I, p.27). FAR 52.219-6 (Deviation 2026-O0038) is incorporated, and FAR 52.219-14 is not listed. Does a limitation on subcontracting apply to this RFQ? If so, may a small-business subcontractor performing the field work count as a similarly situated entity?

Response 8: 52.219-14 Limitations on Subcontracting is not included in the solicitation, and therefore is not applicable.

Question 9: Solicitation Survey item 6. If a prime contractor will use a subcontractor, is a signed teaming arrangement dated before the closing time sufficient to satisfy items 6 and 7, with the full subcontract executed after award?

Response 9: Yes, a signed teaming arrangement demonstrating that the subcontractor will perform the work as required by the solicitation will satisfy the requirement of item 7. The subcontractor information shall still be entered in response to item 6 of the solicitation survey, as stated in the solicitation survey. The teaming arrangement shall be from the subcontractor identified in item 6.

Question 10: Pre-Work Conference (PWS Section I.6, p.10).** The Contractor's Project Manager and Quality Control Personnel must be "physically present." May the Contractor designate the subcontractor's local on-site supervisor, in writing, as its Quality Control representative and Project

Superintendent with authority to act for the Contractor, with the Project Manager attending in person or by phone?

Response 10: A subcontractor may be designated as the Quality Control representative provided they meet all requirements as included in the solicitation and have the authority to act on behalf of the Contractor. Attendance at the pre-work meeting shall be in person only as stated in the solicitation. Attendance by phone is not permissible.

Question 11: Insurance (Sections I and C). There is no inclusion of FAR 52.228-5 or any insurance minimums. Is any insurance certificate required, and if so, may it be furnished after award?

Response 11: As 52.228-5 is not included, it is not applicable to the solicitation. The solicitation does not identify, and therefore, does not require, any insurance minimums.

Question 12: Prior contract (Section L, Information 6.b). Is the $15,300 previous award amount the base year only, or the total including options?

Response 12: Per the instructions to vendors, no additional information is provided on previous awards.

Question 13: Quote acceptance period. Is 60 calendar days after closing acceptable?

Response 13: There is no stated acceptance period for quotes. 60 calendar days is acceptable.

Question 14: Wage Determination 2015-4023 Rev. 36 (Section H). Please confirm this is the governing wage determination for all periods, subject to revision at option exercise.

Response 14: Wage Determination 2015-4023 as stated in the solicitation is applicable to the work associated with the base year. Applicable wage determination may be changed by the Department of Labor. The applicable wage determination will be included with any subsequent modifications.

Question 15: Is there a deadline for submitting questions on this solicitation, and will answers be provided by amendment?

Response 15: This amendment established a deadline of November 20, 2026 at 2:00 PM Eastern for submission of questions for response by the Government.

Question 16: Wage Determination 2015-4023, Rev 36, does not list a Truck Driver classification.

Which classification should the operator of the plow truck be paid under -- Tractor Operator (11270, $24.70), or is a conformance (SF-1444) required for a plow-truck operator classification?

Response 16: Questions on wage determinations and applicable classifications shall be directed to the Department of Labor.

Question 17: Quotes are to be submitted by email to you by November 23, 2026, at 2:00 PM Eastern. Is there a required subject line or file format for the quote submission, and should the signed SF-1449, the bid schedule, and the Solicitation Survey be separate attachments?

Response 17: There is no required subject line. Files shall be attached to the email; Google Drive documents, Cloud documents, etc will not be accepted. The Government is not issuing a direction on whether documents shall be individual attachments, combined files, etc. All documents shall be complete, readable, and submitted prior to the closing date and time.

Question 18: Subcontracting and prime responsibilities. May a Contractor serve as the prime contractor and manage scheduling, quality control, communication, and invoicing while a named subcontractor performs all on-site plowing, shoveling, and sanding? If the prime must perform a minimum portion of the fieldwork, could you identify the applicable requirement?

Response 18: Yes, a subcontractor may perform all on-site plowing, shoveling, and sanding. Refer to the response to question 8 above for additional information.

Question 19: Safety personnel. May a qualified employee of the named subcontractor serve as the designated Level 3 Site Safety and Health Officer, with the prime retaining responsibility for contract compliance?

Response 19: A subcontractor may be designated as the Site Safety and Health Officer provided they meet all requirements as included in the solicitation and have the authority to act on behalf of the Contractor.

Question 20: Minimum service volume. Is there a guaranteed minimum number of paid services in any contract period? If snowfall is light, should vendors account for the cost of maintaining 24/7 availability in their per-service rates?

Response 20: There is no minimum number of paid services guaranteed for any contract period. Payment shall only be made for actual work completed. Vendors are responsible for determining their pricing for a firm fixed price contract for snow removal services.

Question 21: Multiple tasks on one visit. If the crew completes plowing and shoveling and also performs separately authorized sanding during the same visit, should each completed task be billed under its own bid item?

Response 21: The monthly invoice shall list the date services were performed and the quantity of services performed (number of each separate task as identified on the bid schedule) on each date.

Failure to identify this information on an invoice may result in the invoice being rejected for not being a proper invoice. The Government shall only accept work and make payment against proper invoices.

Supplies or Services & Prices or Costs

Miscellaneous text in this section has been modified from:

SNOW PLOWING, SHOVELING AND SANDING SERVICES

U.S. ARMY CORPS OF ENGINEERS

BLACKWATER DAM

WEBSTER, NH

PERFORMANCE WORK STATEMENT

Bid Schedule - Base Year

ITEM # TASK UNIT QTY UNIT

PRICE

TOTAL

1 Snow Plowing

Each 24

2 Snow Shoveling

3 Sanding/Salting

Each 12

Total:

Bid Schedule - Option Year One

PRICE

TOTAL

Bid Schedule - Option Year Two

ITEM # TASK UNIT QTY UNIT

PRICE

To:

SNOW PLOWING, SHOVELING AND SANDING SERVICES

U.S. ARMY CORPS OF ENGINEERS

BLACKWATER DAM

WEBSTER, NH

PERFORMANCE WORK STATEMENT

Bid Schedule - Base Year

ITEM # TASK UNIT QTY UNIT

PRICE

TOTAL

1 Snow Plowing Each 24

3 Sanding /Salting Operation

Bid Schedule - Option Year One

PRICE

Bid Schedule - Option Year Two

ITEM # TASK UNIT QTY UNIT

PRICE

IDCode: J
Page: 1
Pages: 13
AmendNo: 0001
EffDate: 20 NOV 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ27QA005
SolDate: 10 NOV 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry and revise the Bid Schedule. Amendment will also establish a deadline of November 23, 2026 at 2:00 PM Eastern for submission of questions for response by the Government.

Closing is extended until November 24, 2026 at 2:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 20 NOV 2026