Attachments 27QA005.pdf
PDF 654 KB Posted
- Solicitation number
- W912WJ27QA005
About this file
This is a Performance Work Statement document from the U.S. Army Corps of Engineers for snow removal and sanding services at Blackwater Dam. The document provides information maps displaying the geographic locations where snow plowing, shoveling, and sanding services are required.
Figure 1 depicts the primary service areas at Blackwater Dam and associated office locations, identifying five distinct snow removal zones: the Entrance Gatehouse area, Entrance 2-Bay Garage, White Plains Road area, Upper Parking area, and the vicinity of the White Plains Office and Delta Barn. The map indicates these are distributed across approximately 0.07 miles of service area. Figure 2 shows the Cogswell Service Location as an additional snow removal site, located along Cogswell Road and Butler Road in a separate area of the Blackwater property, spanning approximately 0.12 miles. Both maps designate the snow plowing areas in yellow, with black lines indicating Blackwater property boundaries and red dots marking Blackwater Points. The Performance Work Statement establishes the geographic scope and specific locations where the contractor must provide snow removal and sanding services to maintain safe conditions at Blackwater Dam facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Survey 27QA005.pdf | ||
| Solicitation W912WJ27QA005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 1: Overview of Blackwater Dam and Office Snow Plowing, Shoveling and Sanding
Locations.
Figure 2: Overview of Blackwater Dam Cogswell Service Location.
File details come from the government source that posted it. Updated .