This is Amendment 0001 to Solicitation W912WJ27QA003, issued by the U.S. Army Corps of Engineers (W2SD ENDIST New England KO Contracting Division) on October 20, 2026. The amendment provides industry responses to seven questions submitted during the solicitation period. The solicitation closing date remains October 30, 2026 at 5:00 PM Eastern, and all other terms and conditions remain unchanged. Offerors must acknowledge receipt of this amendment prior to the closing deadline using one of three methods: completing items 8 and 15 and returning copies of the amendment, acknowledging receipt on each copy of their offer, or submitting a separate letter or electronic communication that references the solicitation and amendment numbers.
The amendment addresses questions regarding staffing requirements for a guardrail installation project of approximately 250 linear feet. Key clarifications include: subcontractors may serve as Safety and Site Health Officer (SSHO) and Quality Control personnel if properly authorized; provision of submittals constitutes commencement of work, which must occur within 21 calendar days of Notice to Proceed; post and rail dimensions specified are nominal with a minimum 24-inch post-hole diameter required; contractors may request alignment or spacing adjustments if obstructions are encountered, subject to written Technical Point of Contact approval; covered defense information is not included in the work, though Federal Contract Information applies; contractors are responsible for determining material quantities and verifying all measurements before commencing work; and site visit instructions are available in the original solicitation documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ27QA003-0002.pdf | ||
| Attachments 27QA003.pdf | ||
| Solicitation W912WJ27QA003.pdf | ||
| Solicitation Survey 27QA003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
Question 1: Section C I.5.d says the Contractor shall employ a Level 3 SSHO, and C I.6 requires the Contractor's Project Manager and QC personnel at the pre-construction conference. If we team with a local subcontractor under a signed teaming arrangement, may the subcontractor's on-site foreman be designated as the SSHO on ENG Form 6282 and serve as on-site QC, with our Project Manager attending the pre-construction conference? Or must the SSHO be on the prime contractor's payroll?
Response 1: Reference the Statement of Work. The Project Manager and Quality Control Personnel shall have the authority to act of behalf of the Contractor. A subcontractor would need to meet the requirements of these positions and accept the designation. The subcontractor would also have to have the authority to act on behalf of the prime Contractor. The prime Contractor is responsible for overseeing all work and coordination with the Government.
Question 2: Section I requires commencement within 21 days of notice to proceed, while Section C allows submission of preconstruction documents within 21 days, up to 21 days for government review, and prohibits fieldwork before acceptance and the preconstruction conference. Does submission/procurement activity satisfy commencement while fieldwork awaits approval?
Response 2: Provision of submittals is considered commencement of work. Submittals are required to be provided within 21 calendar days of Notice to Proceed. Fieldwork shall not commence prior to the acceptance/approval of submittals.
Question 3: Please confirm whether the specified 8-by-8 posts and 4-by-10 rails are nominal or actual dimensions, and whether a minimum post-hole diameter or approved installation detail applies beyond the stated 3-foot embedment, compacted dense-grade fill and 6-foot spacing.
W912WJ27QA0030001
Response 3: Dimensions are nominal. Minimum diameter of holes for posts shall be 24 inches.
Question 4: Figures 1-5 show retained stumps/rocks and a utility pole. If field verification identifies an obstruction at a required post location, may the alignment or post spacing be adjusted with written government approval, or is removal/drilling at the specified location required?
Response 4: Yes, if there are any obstructions that impact the viability of post installation at a required location, the Contractor can request to install the post in a different alignment/spacing to be approved by the Technical Point of Contact. Only alternations approved in writing by the Technical Point of Contact are considered. All other work shall be completed in accordance with the Statement of Work.
Question 5: The RFQ incorporates DFARS 252.204-7012 and 252.204-7020. Will performance require handling covered defense information or use of a covered contractor information system, and what assessment evidence, if any, is required before award for this specific work?
Response 5: Covered defense information is not included in this solicitation. Federal contract information is. A covered contractor information system is any computer or IT system owned or operated by a Government Contractor that processes, stores, or transmits Federal Contract Information. No assessment is required.
Question 6: Material Quantities: Could you please provide the estimated quantities of wooden posts, rails, and associated hardware required for the approximately 250 linear feet of guardrail installation?
Response 6: Material quantities will not be provided. The vendor/Contractor is responsible for determination of material quantities required and field verification of all measurements prior to commencement of work.
Question 7: Site Visit: Would it be possible to arrange a site visit to review the existing conditions and better understand the installation requirements?
Response 7: Instructions for requesting site visits are included in the solicitation.
W912WJ27QA0030001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 20 OCT 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ27QA003 |
| SolDate: 16 OCT 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry. |
Closing remains October 30, 2026 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 20 OCT 2026 |