This is Amendment 0002 to Solicitation W912WJ26QA170, issued by the U.S. Army Corps of Engineers (USACE) New England District on 7 October 2026 for snow removal and salting services at East Brimfield Lake in Fiskdale, Massachusetts. The solicitation closing date remains 13 October 2026 at 2:00 PM Eastern. The amendment provides responses to industry questions and a revised Performance Work Statement. Offerors must acknowledge receipt of this amendment prior to the solicitation closing time using one of three methods: completing and returning amendment copies, acknowledging receipt on each offer copy, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers.
The Performance Work Statement requires contractors to provide snow plowing, shoveling, salting, and snow removal services from contract award through 30 April 2027 at multiple project locations totaling approximately 61,120 square feet. Snow plowing triggers at two inches or greater accumulation and must be completed by 7:00 AM daily. Salting and snow removal occur only upon request by the Technical Point of Contact. The contract includes four snowfall accumulation thresholds (0-6 inches, 6-12 inches, 12-24 inches, and greater than 24 inches) with estimated quantities of 8, 5, 3, and 1 events respectively, plus on-call salting (6 instances) and on-call snow removal (1 instance). Contractors must submit pre-work submittals including Accident Prevention Plan (ENG Form 6293), Activity Hazard Analysis, Site Safety and Health Officer designation (ENG Form 6282), First Aid/CPR certifications, and product safety data sheets within 14 days of award. The contractor shall employ a Level 3 Site Safety and Health Officer and ensure the Project Manager and Quality Control Personnel attend an in-person pre-work conference in Fiskdale. Snowfall measurements will be determined by the National Weather Service East Brimfield Lake Project Office, and payment is based on snowfall accumulation per storm event regardless of duration or multiple plowing passes required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments 26QA170.pdf | ||
| Solicitation Survey 26QA170.pdf | ||
| Amendment W912WJ26QA170-0001.pdf | ||
| Solicitation W912WJ26QA170.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
QUESTION 1: Would the Government accept the Project Manager attending the Pre-Work Conference virtually (phone/video), with the subcontractor's on-site supervisor attending in person as the Contractor's designated Quality Control representative?
RESPONSE 1: Attendance at the pre-work conference shall be in person only. Reference the Performance Work Statement. The Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. A subcontractor would need to meet the requirements of these positions and accept the designation. The subcontractor would also have to have the authority to act on behalf of the prime Contractor. The prime Contractor is responsible for overseeing all work and coordination with the Government.
QUESTION 2: Section L (Bid Schedules, Item 2) instructs offerors to enter "$0.00" or "NSP" (Not Separately Priced) for items where pricing is included elsewhere. However, Section M (Action/Step- 3, Paragraph iv) states that quotes indicating "$0" or "NSP" will be rejected as non-conforming.
Could the Government clarify whether entering "$0" or "NSP" is permissible for sub-items included within primary tasks, or if a positive dollar value must be entered for every single line item on the Bid Schedule?
RESPONSE 2: Section L (Bid Schedules, Item 2) states, "Vendors shall enter $0.00 on Bid Schedules in which items are Not Separately Priced (NSP) when Bid Schedules are required to be submitted in excel format. For Bid Schedules that are not required to be submitted in excel format, either $0 or NSP shall be entered. Blank entries will not be considered and will result in quotes being deemed non-responsive." Since this bid schedule is not required to be submitted in excel format, Contractors are permitted to enter $0 or NSP for bid schedule line items.
QUESTION 3: PWS Section B.7.e.v states that payment for storm event activities is based on total NWS storm snowfall depth, even if multiple plowing passes are required during a prolonged storm event. Could the Government clarify what specific NWS weather station or reporting mechanism
W912WJ26QA1700002
defines the official start and conclusion of a single "storm event," and whether separate billing applies if a storm spans multiple calendar days or requires distinct dispatches to maintain the mandatory 7:00 AM site clearance standard?
RESPONSE 3: Please refer to the revised Performance Work Statement. Snowfall totals will be determined based on measurements at the East Brimfield Lake Project Office, Fiskdale, MA.
Billing shall be based on snowfall accumulation for each event, even if the event expands over multiple calendar days.
QUESTION 4: PWS Section B.7.b states that salting is performed on an "on-call" basis upon request by the TPOC. Please clarify whether automatic salting is authorized/required concurrently whenever a contractor mobilizes for a plowing event (Tasks 1-4), or if a separate, explicit callout from the TPOC is required prior to applying salt under Task 5.
RESPONSE 4: As stated in Section B.7.b.i. "Salting will only occur at the request of the TPOC or his designee." Therefore, automatic salting is not permitted.
QUESTION 5: Task 6 is listed on the Bid Schedule as a quantity of 1 "EA" for Snow Removal (On Call). To ensure consistent pricing among offerors, could the Government define what constitutes "1 EA" for Task 6 (e.g., a 24-hour equipment/crew operational day, a specific cubic yardage /truckload volume, or a single site-wide snow bank relocation event regardless of duration)?
RESPONSE 5: Task 6 is a single site-wide snow bank relocation event regardless of duration. As stated in Section B.7.d.iii. "Snow removal may occur when accumulated storm totals exceed 24 inches, or as deemed necessary by TPOC or his designee, to avoid hazardous conditions which restrict parking, reduce travel lanes, and prevent plowing of future snowfalls. Snow removal will require push back and/or removal of snow to completely reopen travel lanes, by pushing/lifting snow over guard rails."
QUESTION 6: PWS Section B.5 notes that contractors may need warming devices to thaw frozen gate padlocks. Is government-furnished electrical power accessible at the project entry points (e.
g., Dam Office or Storage Shed), or must contractors provide fully self-contained, portable heating equipment?
RESPONSE 6: There is no access to electrical power. The Contractor is responsible for providing a warming device that does not require the use of government-furnished electrical power.
QUESTION 7: PWS Section A.4 specifies a 14-day post-award window for submitting pre-work safety plans (APP, AHA, SSHO designation) and reserves up to 7 days for USACE review, during which no field work may proceed. In the event of a significant snowfall occurring during this administrative review window prior to formal APP acceptance, how will USACE handle site access and emergency snow removal?
RESPONSE 7: No onsite work shall be performed before the pre-work submittals are approved and accepted by the Technical Point of Contact. The Contractor will not be responsible for snowfall removal during the submittal review period.
QUESTION 8: PWS Section A.6 requires the physical presence of the Prime Contractor's Project Manager and Quality Control Personnel at the Pre-Work Conference in Fiskdale, MA. For prime contractors operating with an executed subcontractor teaming arrangement, does USACE permit a designated on-site Subcontractor Representative to serve as the authorized Quality Control Personnel / Project Superintendent at this conference?
RESPONSE 8: The Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. A subcontractor would need to meet the requirements of these positions and accept the designation. The subcontractor would also have to have the authority to act on behalf of the prime Contractor. The prime Contractor is responsible for overseeing all work and coordination with the Government.
QUESTION 9: Please confirm whether the required Level 3 SSHO may be an employee of a named subcontractor performing the field services, provided the prime contractor remains responsible for contract performance, safety compliance, supervision, and oversight of the subcontractor. Alternatively, must the Level 3 SSHO be a direct employee of the prime contractor?
RESPONSE 9: The Prime Contractor may designate a subcontractor employee as the Level 3 SSHO, if the individual meets the requirements of a Level 3 SSHO.
Description/Specifications/Statement of Work
Miscellaneous text in this section has been added to:
PERFORMANCE WORK STATEMENT :(REVISED)
SNOW REMOVAL AND SALTING SERVICES
U.S. ARMY CORPS OF ENGINEERS
EAST BRIMFIELD LAKE
FISKDALE, MASSACHUSETTS
PERFORMANCE WORK STATEMENT
A. GENERAL
1. Scope
Provide all equipment, materials, labor, and transportation necessary to perform snow plowing, shoveling, salting, and snow removal services at the East Brimfield Lake project areas.
*Note: This work requires the following submittals prior to the commencement of work (Refer to Section 7. Submittals for a full list of submittals):
ENG Form 6293 (Accident Prevention Plan Worksheet)
ENG Form 6206 (Activity Hazard Analysis)
ENG Form 6282 (Site Safety and Health Officer Designation Letter)
First Aid and CPR Certificates
Product Safety Data Sheets (SDS) for road salt
2. Locations
East Brimfield Dam is located at 24 Riverview Ave, Fiskdale, Massachusetts.
3. Site Visit
Contact the Technical Point of Contact (TPOC), Keith W. Beecher at 978-318-8405 or keith.w.
beecher@usace.army.mil to arrange a site visit.
Interested vendors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the site(s) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.
4. Schedule
The contract period of performance shall be from contract award to 30 April 2027.
All pre-work submittals shall be submitted within 14 days of contract award. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the response, unless additional time is granted by the Government in writing.
No field work may proceed prior to the acceptance of pre-work submittals.
5. Safety
a. General:
All work shall be conducted in accordance with the USACE Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-% 20FINAL.pdf
A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf
d. Site Safety and Health Officer (SSHO) Requirements:
The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.
b and 2-4.b.
Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter): SITE SAFETY & HEALTH OFFICER (SSHO) DESIGNATION LETTER (army.mil)
e. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
f. Additional Personnel Requirements:
Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.
g. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications /EngineerForms/Eng_Form_3394_2021Aug.pdf
h. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.
6. Pre-Work Conference
Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Work Conference." The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the
Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-work Conference:
i. Authority of the TPOC
ii. Contractor's Safety Program
iii. Activity Hazard Analysis
iv. Abbreviated Accident Prevention Plan
v. Requirements for Safety Meetings (Documented on NED Form 251)
vi. Accident Reporting (ENG Form 3394)
vii. Accident Exposure Hours - Reporting requirements
viii. Safety Data Sheet (SDS) requirements
ix. Contractor's Quality Control Plan
x. Communications and Correspondence Procedure
xi. Administrative Procedures
xii. Invoice and payment
7. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security
The Contractor will comply with all established security policies at East Brimfield Lake. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.
9. Contractor Conduct
Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
10. Payment
The Contractor shall furnish the TPOC with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.
Payment shall be made monthly for the actual services performed at the applicable contract unit price.
NOTE: Final Payment may be held until the Contractor has returned any and all issued keys to the TPOC at the completion of work. All keys are required to be physically handed to the TPOC, or if mailed, the Contractor assumes all responsibility for loss (which may include the cost of rekeying the applicable project).
All invoices shall be mailed to:
U.S. Army corps of Engineers
East Brimfield Lake
24 Riverview Avenue
Fiskdale, MA 01518
Or emailed to keith.w.beecher@usace.army.mil
B. TECHNICAL REQUIREMENTS
1. General
Provide all equipment, materials, labor, and transportation necessary to provide snow plowing, snow shoveling, snow removal and salting services. The services shall be performed at the East Brimfield Lake project as shown on attached maps. The services shall include storms that are "less than 6-inches", "6-inches to 12-inches", "12-inches to 24-inches" and "greater than 24-inches". Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.
2. Submittals
Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.
a. Pre-work Submittals: Submitted within 14 days of contract award. Submittals must be accepted prior to the commencement of any field work.
i. ENG Form 6293 (Accident Prevention Plan Worksheet)
ii. Activity Hazard Analysis (AHA)
iii. ENG Form 6282 (Site Safety and Health Officer Designation Letter)
iv. First Aid/CPR Certifications
v. Product SDS for road salt
3. Materials & Supplies
The following material shall be provided by Contractor:
Salt for application to plowed and shoveled areas when requested.
4. Equipment
The Contractor is required to have sufficient equipment to plow snow, spread salt, shovel snow, and open frozen locks. The equipment should be able to handle heavy snow loads from falling snow, ice, and rain, to drifted snow. The equipment should be able to broadcast the snow to avoid encroaching snowbanks. Equipment must be available and sized to remove snow accumulated from multiple storms along roadway and parking lot edges, and to place it beyond guardrails, posts, and bumpers so that vehicular access and parking capacity are maintained.
5. Site Access
The Contractor will be provided a key for access to the East Brimfield Lake project gates. If the Contractor is required to unlock and open a gate to plow, then the Contractor will be required to secure the gate when the plowing is completed unless project personnel are present. The Contractor may have to use a warming device to thaw frozen locks to gain access to areas in this contract. Upon the completion of this contract, the Contractor will return the key to TPOC or his designee before final payment is made.
6. Property Damage
In the event that property becomes damaged, it is the Contractor's responsibility to immediately notify the TPOC to report the damage. It will be the responsibility of the Contractor to coordinate with the TPOC an appropriate way to repair damaged property at no cost to the Government.
7. Service Description
a. Snow Plowing:
i. Snow plowing will be required after accumulation of two (2) inches or more of snow, or upon notification by TPOC or his designee during normal business hours.
ii. Snow will be pushed and stored in such a manner that garage doors, building doors, parking areas and hydrants (one at East Brimfield Dam) are not blocked.
iii. The Contractor will make sure to safely push back all banks along roadways, parking lots and entry points to maintain access. All access roads shall be at a minimum of sixteen (16) feet in width.
iv. Plowed areas MUST be cleared no later than 7:00 am daily.
v. In addition to morning plowing, plowing will also be performed on weekends, holidays, and after normal business hours during the week to maintain access during storm events.
vi. All plowing areas have paved surfaces.
b. Salting: The following services shall be performed as part of the salting, upon request:
i. Salting will only occur at the request of the TPOC or his designee.
ii. The TPOC or his designee may request additional salting as conditions require.
iii. Salting will also be performed on weekends, holidays, and after normal working hours during the week, if necessary, as requested by the TPOC or his designee.
iv. Salt shall be applied to all plowed areas as well as the steps to office buildings and landings, back and front doors at the East Brimfield Dam Office, front door to storage shed, path to and door to small garage, and the gatehouse bridge.
c. Snow Shoveling: The following services shall be performed as part of snow shoveling:
i. Snow shoveling will be required after accumulation of two (2) inches or more of snow, or upon notification by TPOC or his designee during normal business hours.
ii. Shoveled snow will be removed in such a manner that garage doors, building doors, stairways and hydrants are free of any accumulated snow. Shoveled snow shall not be deposited in a way that blocks roads, driveways, or other access to buildings.
d. Snow Removal: The following services shall be performed as part of the snow removal:
i. Snow removal will only occur at the request of the TPOC or his designee.
ii. Snow removal will be required at all service locations included in this contract.
iii. Snow removal may occur when accumulated storm totals exceed 24 inches, or as deemed necessary by TPOC or his designee, to avoid hazardous conditions which restrict parking, reduce travel lanes, and prevent plowing of future snowfalls. Snow removal will require push back and/or removal of snow to completely reopen travel lanes, by pushing/lifting snow over guard rails.
e. Snowfall Accumulation Thresholds: The scope of services includes the following snowfall accumulation thresholds:
i. Less than 6 inches - Snowfall events total less than six (6) inches.
ii. 6 inches to 12 inches - Snowfall events of at least six (6) inches and up to (and including) twelve
(12) inches.
iii. 12 inches to 24 inches - Snowfall events of at least twelve (12) inches and up to (and including) twenty-four (24) inches.
iv. Greater than 24 inches - Snowfall events in excess of twenty-four (24) inches.
v. Snowfall Totals - The National Weather Service NWS Weather Forecast Office - Boston / will be used to determine storm East Brimfield Lake Project Office, Fiskdale, MATaunton, MA snowfall totals for the East Brimfield Lake facility. In the event of a large storm, the Contractor may need to plow several times during the storm event to keep service areas open and accessible.
However, the payment for the storm event activities will be based on snowfall totals.
8. Service Locations
a. All service areas except for the Long Pond parking lot are located at 24 Riverview Avenue, Fiskdale, MA. The Long Pond Parking Lot is located off Route 20 in Fiskdale, MA. See attached maps for additional information.
i. Plowing:
1) East Brimfield Office Lot, Dam Lot, and Entrance Road: 17,250 square feet
2) East Brimfield Dam Crest, including gatehouse bridge: 9,800 square feet
3) East Brimfield Storage Shed access road and parking lot: 9,070 square feet
4) Long Pond Parking Lot: 25,000 square feet
ii. Salting:
1) East Brimfield Office Lot, Dam Lot and Entrance Road: 17,250 square feet
2) East Brimfield Dam Crest, including gatehouse bridge: 9,800 square feet
3) East Brimfield Lake Long Pond Parking Lot: 25,000 square feet
iii. Shoveling:
1) East Brimfield Office: steps and landings to front and rear office door including connecting walkway.
2) Gatehouse: doors (and bridge, if unable to plow)
3) Small Garage: sidewalk to entry door, as well as in front of garage and generator building access door.
4) Storage Shed: access door and garage doors front and back.
9. Estimated Quantities: The following table is the estimated quantities for the required service including the location, service, and storm event.
Task
Snowfall Amount
Service Description Location Qty
1. 0-6 inch Plowing & Shoveling
Office Lot, Dam Lot, Entrance Road, Dam Crest, Storage Shed Road, Long Pond Parking Lot
2. 6-12 inch Plowing & Shoveling
Office Lot, Dam Lot, Entrance Road, Dam Crest, Storage Shed Road, Long Pond Parking Lot
3. 12-24 inch Plowing & Shoveling
Office Lot, Dam Lot, Entrance Road, Dam Crest, Storage Shed Road, Long Pond Parking Lot
4. 24+ inch Plowing & Shoveling
Office Lot, Dam Lot, Entrance Road, Dam Crest, Storage Shed Road, Long Pond Parking Lot
5. N/A Salting (On Call) Office Lot, Dam Lot, Entrance Road, Dam Crest
Long Pond Parking Lot
6. N/A Snow Removal (On Call)
Office Lot, Dam Lot, Entrance Road, Dam Crest, Storage Shed Road
| IDCode: J |
| Page: 1 |
| Pages: 14 |
| AmendNo: 0002 |
| EffDate: 07 OCT 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA170 |
| SolDate: 18 SEP 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry and to revise the Performance Work Statement. |
Solicitation closing remains October 13, 2026 at 2:00 PM Eastern.
All other terms and conditions remain unchanged.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 07 OCT 2026 |
File details come from the government source that posted it. Updated .