This document consists of overview and detailed maps for snow plowing operations at East Brimfield Dam, a U.S. Army Corps of Engineers facility in the New England District. The maps delineate three primary snow removal and plowing areas totaling approximately 51,120 square feet across two distinct locations.
Map #1 identifies dam and office snow removal areas: the Office and Dam Access Road and Lots (±17,250 square feet), the Dam Crest including Gatehouse Bridge (±9,800 square feet), and the Storage Shed Road and Lot (±9,070 square feet). Map #2 shows the Long Pond Boat Ramp snow plowing area (±25,000 square feet). The overview map displays the USACE project boundary encompassing East Brimfield Lake and Long Pond, with both areas located near Interstate 90 and Highway 20 in Massachusetts. The maps are current as of September 2026 and provide precise geographical coordinates and visual delineation of all snow plowing service areas required for facility operations and public access at this federal water resources project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA170-0002.pdf | ||
| Solicitation Survey 26QA170.pdf | ||
| Solicitation W912WJ26QA170.pdf | ||
| Amendment W912WJ26QA170-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING STRONG
U.S. ARMY CORPS OF ENGINEERSEAST BRIMFIELD DAM
OVERVIEW MAP
OVERVIEW OF SNOW PLOWING AREAS
EAST BRIMFIELD DAM
U.S. ARMY CORPS OF ENGINEERS
NEW ENGLAND DISTRICT
OCT 20230 0.4 0.8 1.2 1.6 20.2
Miles
USACE Project Boundary
Map #1 East Brimfield Dam
Long Pond
East Brimfield Lake
§̈¦90
£¤20
Map #2 Long Pond Boat Ramp
MAP #1
DAM AND OFFICE SNOW REMOVAL
EAST BRIMFIELD DAM
U.S. ARMY CORPS OF ENGINEERS
NEW ENGLAND DISTRICT
SEP 2026
0 0.025 0.050.0125 Miles
East Brimfield Lake
USACE Project Boundary
Snow Removal/Plowing Areas:
- Office and Dam Access Road and Lots: +/- 17,250 square feet
- Dam Crest, Including Gatehouse Bridge: +/- 9,800 square feet
- Storage Shed Road and Lot: +/- 9,070 square feet
Storage Shed
Project Office
Dam Crest Dam Lot/
Small Garage
Riv er vie w
Av e
Gatehouse Bridge
MAP #2
LONG POND BOAT RAMP
EAST BRIMFIELD DAM
U.S. ARMY CORPS OF ENGINEERS
NEW ENGLAND DISTRICT
SEP 20260 0.025 0.050.0125
Miles
Long Pond
£¤20
Snow Plowing Area: Long Pond Boat Ramp: +/- 25,000 square feet
Long Pond Boat Ramp