Amendment W912WJ26QA149-0001.pdf

PDF 4 MB Posted

Attached to
Culvert Replacement, Knightville Dam, Huntington, MA
Solicitation number
W912WJ26QA149
Issued by

About this file

This is Amendment 0001 to Solicitation W912WJ26QA149, issued by the U.S. Army Corps of Engineers, New England District on August 17, 2026. The amendment provides responses to industry questions regarding culvert repair and reconstruction work at Knightville Dam. The solicitation closing date remains August 21, 2026 at 5:00 PM Eastern and is not extended. Contractors must acknowledge receipt of this amendment prior to the closing deadline through one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or submitting separate written communication referencing the solicitation and amendment numbers.

The amendment clarifies three key requirements for contractor execution. For culvert 2 work on the entrance road to Knightville Dam, the contractor is not required to create a bypass route and may close road sections during work. However, due to one affected private residence, the contractor must coordinate with the Government and maintain on-site means to cover and keep the work area passable while working on culvert 2 daily, or ensure coverage and passability during non-working hours if work extends beyond one day. For culvert 1, excavated materials and culvert stones will be staged at a location designated by the Government within the Knightville Recreation Area in close proximity to the work area. For culvert 2, all existing materials including removed pavement, culvert, headwalls, and bedding material must be disposed of off-site in accordance with local, state, and federal regulations. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
Amendment W912WJ26QA149-0003.pdf PDF
Amendment W912WJ26QA149-0002.pdf PDF
Attachments.pdf PDF
Solicitation Survey 26QA149.pdf PDF
Solicitation W912WJ26QA149.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been added to:

REQUEST FOR INFORMATION:

Question 1: Section 12. "Traffic Control" states that the Contractor shall maintain and protect traffic on all affected roads. Is the Contractor required to provide a bypass route for traffic and the public, or can access to these sections of roads be closed for the duration of work through the use of barricades?

Response 1: The Contractor is not required to create a bypass route. The sections of road may be closed while work is occurring. However, there is one private residence that is affected by the work on culvert 2, located along the entrance road to the Knightville Dam. The Contractor shall coordinate ahead of time with the Government for this work so that the Government can coordinate with the resident to attempt to minimize impacts to not only the Contractor's work, but the resident's access to their property. Therefore, the Contractor shall have on site the means to cover the work area to permit access while working on culvert 2 at all times. If work is not completed within one day, the Contractor shall also ensure that the work area is covered and passable while they are not on site.

Question 2: The solicitation requires for culvert 1 that the culvert stones and excavated materials will be set aside at a location designated by the TPOC. Can the location be provided to determine if it is in close proximity to the work area?

Response 2: The location will be within the Knightville Recreation Area, in close proximity to the work area.

W912WJ26QA1490001

Question 3: For culvert 2, is the Contractor required to dispose of all existing materials off site or is there a location to leave these on site as well? This would be applicable to the removed pavement, culvert, head walls, and bedding material.

Response 3: All existing materials from culvert 2 shall be disposed of off site in accordance with all local, state, and federal regulations.

W912WJ26QA1490001

IDCode: J
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 17 AUG 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA149
SolDate: 05 AUG 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry.

Closing remains August 21, 2026 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 17 AUG 2026

File details come from the government source that posted it. Updated .