This is Amendment 0002 to Solicitation W912WJ26QA147, issued by the U.S. Army Corps of Engineers New England District on August 25, 2026. The amendment extends the solicitation closing date from August 26, 2026 to August 28, 2026 at 5:00 PM Eastern time. Offerors must acknowledge receipt of this amendment prior to the revised closing date through one of three methods: completing and returning the amendment document, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers.

The amendment adds two questions and responses to a Request for Information section addressing project specifications and air monitoring requirements. Response 1 clarifies that click-together/floating luxury vinyl plank (LVP) will be installed on the main floor and second floor offices, with glue-down LVP installed only on the stairs and landing. Response 2 clarifies that daily air monitoring during asbestos removal must be conducted by the contractor or designated employees (SSHO, CP) rather than a third-party industrial hygienist, though a third-party hygienist is required for post-abatement inspection. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
Amendment W912WJ26QA147-0001.pdf PDF
Solicitation W912WJ26QA147.pdf PDF
Attachments 26QA147.pdf PDF
Solicitation Survey 26QA147.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date

26 Aug 2026 28 Aug 2026

Miscellaneous text in this section has been added to:

REQUEST FOR INFORMATION:

QUESTION 1: Could you please confirm whether the Government requires click-together/floating LVP for the main floor areas and glue-down LVP for the stairs, as currently described in the solicitation; or glue-down LVP throughout the entire project?

RESPONSE 1: Click together/floating LVP will be installed on the main floor and second floor offices. Glue-Down LVP will be installed only on the stairs/landing.

QUESTION 2: The solicitation requires an air monitoring plan addressing personal, environmental, and clearance monitoring and states that continued exposure monitoring may be required based on the initial exposure determination. It also requires a post-abatement inspection by an independent licensed industrial hygienist. Could you please clarify whether the Government requires daily air monitoring by a third-party industrial hygienist during active asbestos removal, in addition to the required post-abatement inspection and final clearance testing? If daily monitoring is not required, could you please confirm the expected frequency or applicable monitoring requirement during the active removal period so that we can ensure it is accurately accounted for in our pricing?

RESPONSE 2: Daily air monitoring is not required by a third party, but is required to be done by the Contractor or one of his designated employees (SSHO, CP). A third party hygienist is required for the post abatement inspection.

W912WJ26QA1470002

IDCode: J
Page: 1
Pages: 2
AmendNo: 0002
EffDate: 25 AUG 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA147
SolDate: 03 AUG 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry and extend the solicitation closing.

Solicitation closing is extended until August 28, 2026 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: SHEILA WINSTON-VINCUILLA
ContDate:
CODate: 25 AUG 2026

File details come from the government source that posted it. Updated .