Amendment W912WJ26QA138-0003.pdf

PDF 4 MB Posted

Attached to
Spillway Tree Removal Services, Birch Hill Dam and Tully Lake Dam, Royalston, MA
Solicitation number
W912WJ26QA138
Issued by

About this file

This is Amendment 0003 to Solicitation W912WJ26QA138, issued by the U.S. Army Corps of Engineers (USACE) W2SD Endist New England on July 28, 2026, with an effective date of July 28, 2026 and solicitation closing date of July 30, 2026 at 2:00 PM Eastern. The amendment modifies the Performance Work Statement and provides responses to twelve industry questions regarding forestry clearing work at Tully Lake and Birch Hill Dam projects.

Key scope clarifications include: forestry mulcher use is permitted at Tully Lake with on-site chipping allowed, but all woody material at Birch Hill Dam must be removed off-site; the forestry mowing requirement has been removed from scope; minimum tree diameter is clarified as 4 inches DBH, with the Performance Work Statement revised accordingly; equipment may deviate from the 25-foot buffer fence with Technical Point of Contact approval to avoid bedrock and safety hazards; access via alternative routes is permitted with approval; the disc golf course remains active during performance; brush burning is prohibited; Birch Hill Dam gates close December 21, 2026 with contractor access permitted through gates after that date, and the Spillway Weir area is subject to inundation restrictions; structural gravel is permissible in outlet and spillway areas but not in the flood inundation weir area; the field at Birch Hill Dam can serve as a processing landing with restoration required post-completion; and no formal seasonal closures exist, with a performance period of November 1 through April 14 consistent with bat roosting habitat protection. The Period of Performance accommodates pheasant hunting season (October 16 – December 31, 2026) and deer season (November 30 – December 31, 2026).

View the file

Other files

File Type Posted
Amendment W912WJ26QA138-0002.pdf PDF
Amendment W912WJ26QA138-0001.pdf PDF
Solicitation Survey 26QA138.pdf PDF
Attachments 26QA138.pdf PDF
Solicitation W912WJ26QA138.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

Miscellaneous text in this section has been modified to:

REQUEST FOR INFORMATION:

QUESTION 1: While about 5% to 15% of the trees are large and will require traditional felling, much of the site appears suitable for a forestry mulcher. However, the solicitation indicates an offsite disposal requirement at Birch Hill. Could you clarify if using a forestry mulcher to process the wood would allow the material to remain on-site, or if all debris must be removed?

RESPONSE 1: Please refer to Part 2.5.f. of the Performance Work Statement, which states, "At Tully Lake wood chips may be broadcasted into the adjacent wooded areas where possible or brought off site. At Birch Hill Dam all debris shall be taken offsite including logs, chips, and brush."

If a Contractor chooses to use a forestry mulcher at Birch Hill Dam to process the wood, all woody material, including chips, are still required to be removed off site.

QUESTION 2: Forestry mowing scope: the PWS's opening Scope paragraph (I.1) states the contractor must "perform forestry mowing at the Birch Hill Dam Project," but no acreage, frequency, equipment specification, or separate priced line item appears anywhere else in the solicitation. Please confirm whether this work is included within CLIN 0001's lump-sum price, and provide the specific scope/acreage/frequency for this task.

RESPONSE 2: This requirement has been removed. Please see the revised Performance Work Statement.

QUESTION 3: Minimum DBH scope: the PWS's general Part II execution clause states trees "from two (2") inches DBH and above" are in scope, while every site-specific area description states ranges beginning at 4" DBH. Please confirm whether the ~1,410-tree total already includes 2"-4" DBH stems, or whether additional smaller-diameter material is implied beyond that count.

RESPONSE 3: The estimated quantities are based on a minimum DBH of 4 inches. The Performance Work Statement has been revised to remove the 2 inch minimum. Vendors should note that tree quantities are approximate, and a site visit is highly recommended to gauge the full scope of work.

QUESTION 4: Can equipment mobilize outside of the 25' buffer from the fence and take paths further away from the fence to avoid bedrock and unsafe working conditions?

W912WJ26QA1380003

RESPONSE 4: Deviations in the 25' buffer from the fence may be permitted with prior approval by the Technical Point of Contact to improve safety and efficiency including around the bedrock outcrop on the south side of the Tully Lake Spillway area. An additional access point from the south end of the Birch Hill Dam Outflow fence from the existing access road in the field may also be permitted. One path of access may be permitted from the Tully Lake project office parking lot through the already cleared area to the north end of the northern spillway fence buffer area through the disc golf course. All equipment pathways and access points must be approved by the Technical Point of Contact prior to equipment mobilization.

QUESTION 5: Are there alternative access points to the Birch Hill Dam Spillway Weir Clearing Area?

RESPONSE 5: Access to the Spillway Weir Clearing Area is via River Road to Swamp Road in Royalston. Due to a lease with MassDCR and the snowmobile use, access via the Denison Day Use area is not permitted.

QUESTION 6: Is the Disc Golf Course active during the Period of Performance?

RESPONSE 6: Yes, USACE will work with the course volunteers to remove the disc golf baskets from the holes along the work area and advertise the scheduled tree work times to discourage use, but the area is heavily utilized by the public.

QUESTION 7: Can brush be burned on site?

RESPONSE 7: No, burning is not permitted. Per the solicitation, "Tree Debris shall be chipped or removed off site".

QUESTION 8: Are there access limitations to the sites?

RESPONSE 8: At Birch Hill Dam, the exterior gates are closed the 3rd Monday in December and the area is opened to snowmobile access. Access through the gates will be permitted and coordinated with the TPOC after 21 DEC 2026. Roads are not plowed beyond the exterior gate.

Contractors shall be prepared to move snow to access clearing sites should conditions require.

Additionally, at Birch Hill Dam, the Spillway Weir Clearing Area (map 4) is in the inundation area.

Access may be restricted due to high water events due to weather and flooding issues outside USACE control.

QUESTION 9: Is it permissible to add structural gravel to support the equipment?

RESPONSE 9: Adding structural gravel in the outlet fence area at Birch Hill Dam or Tully Lake spillway areas is permissible as long as there are no wetlands impacted and best management practices are followed. Grading of the existing on-site materials is also permitted. At the Birch Hill Dam Weir Area, adding gravel material is NOT permitted as this is a flood inundation area.

Grading existing soils from within the cut area to establish a landing and support operation is permissible as long as there are no wetlands impacted and best management practices and industry standards are followed.

QUESTION 10: In the Birch Hill Dam Outlet Fence Area, can the cleared area by the access road be used as a landing for processing?

RESPONSE 10: The wooded cart/spillway access road, can be used for access and trees can be cleared, if needed to permit access, however that road needs to be restored to current conditions once tree work is completed. The east end of the field at the bottom of the hill along the access road can be used as a landing for processing in as small a footprint as reasonably practicable.

Trees can be removed around the edge of the field if needed to expand the area. The bulk of the field west of the access road needs to be maintained as an open field. Any potential landing areas in the field need to be restored to their prework condition as this is a fire managed habitat area.

Chips and debris cannot be left on site. Birch Hill Dam is a Massachusetts Pheasant Stocking Site for hunting and that field is one of the stocking sites. Pheasant season begins 16 Oct 2026 and continues through 31 DEC 2026; stocking activities end the week before Thanksgiving and is closed for the shotgun deer season which starts 30 NOV 2026.

QUESTION 11: Can a formal list of closures--for hunting, seasonal flooding, snowmobiles, etc.--be compiled, per area, prior to the quote submission deadline? Since this project's (POP) work involves bat roosting habitat cutting restrictions, these seemingly unknown closures mentioned in Amendment 2 should be known. Any other potential delays, if known, should be shared prior to quoting.

RESPONSE 11: There are no site closures to the Contractor. The POP of Nov 1 - APR 14 is consistent with the bat roosting habitat. All other uses of the property will be coordinated with the partners by USACE according to the Contractor's schedule. There are no seasonal closures at Tully Lake Dam. Birch Hill Dam exterior gates close 21 DEC 2026. Contractors will have access through the gate to complete the work. Birch Hill dam is a multi use property open to the public year round for varied uses. The information provided in Amendment 0002 was for informational purposes so Contractors can anticipate other activities on the property. Snowmobile routes can be rerouted during periods of work if necessary. Contractors can use signage, cones etc. to deter public access around work sites. Seasonal flooding is not predictable and varies year to year.

TPOC will coordinate with Contractors as soon as weather conditions indicate rising water levels when the Contractor is working on the Spillway Weir clearing at Birch Hill Dam.

QUESTION 12: If the Weir Clearing is only accessible via River Rd/Swamp Road can the Contractor cut and grade a bypass around a large and narrow hump in the road that would limit access?

RESPONSE 12: Due to bedrock and auxiliary spillway infrastructure a bypass may not be possible. Gravel can be added to the road to improve grades, trees can be removed along road edges. The Government may accept an alternative route identified if agreeable and approved by the TPOC, however, if an alternative route is agreed upon, both ends of an alternative route would need to blocked off with boulders to prevent vehicle access at the completion of work.

IDCode: J
Page: 1
Pages: 5
AmendNo: 0003
EffDate: 28 JUL 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA138
SolDate: 20 JUL 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry. Questions #11 - #12 are applicable to this amendment.

Solicitation closing remains July 30, 2026 at 2:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 29 JUL 2026