Amendment W912WJ26QA111-0001.pdf
PDF 4 MB Posted
- Solicitation number
- W912WJ26QA111
About this file
This is an amendment to a federal solicitation (Amendment 0001) for pavement crack repair and seal coating services at Thomaston Dam in Thomaston, Connecticut. The amendment is effective June 11, 2026, with solicitation closing on June 17, 2026, at 5:00 PM Eastern time.
The work involves repairing approximately 1,000 linear feet of cracks on a 2,000-foot-long dam crest road and applying asphalt emulsion seal coating to the entire surface. Key tasks include mechanical crack routing and cleaning, filling cracks and voids exceeding 1 inch in separation with epoxy-based asphalt mortar, applying hot pour crack filler conforming to ASTM D6690 Type II standards, and repairing one pothole (24"W x 36"L x 2" deep) with cold-mix high-performance asphalt patch. Required products must withstand temperatures below 0°F after curing. The contractor must provide all labor, materials, equipment, and transportation. The contract period of performance is 210 days from award, with work performed Monday through Friday, 7:00 AM to 3:30 PM. The issuing agency is the U.S. Army Corps of Engineers (W2SD ENDIST NEW ENGLAND, located in Concord, MA). The amendment added a site visit attendee list, provided responses to two industry questions (confirming the pothole is included in scope and clarifying that coal tar cannot substitute for asphalt emulsion), and included a revised Statement of Work with additional pothole specifications and photo documentation. All pre-construction submittals must be submitted within 21 days of contract award, including safety documentation, product specifications, and required certifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ26QA111.pdf | ||
| Attachments 26QA111_Revised.pdf | ||
| Attachments 26QA111.pdf | ||
| Solicitation W912WJ26QA111.pdf | ||
| Solicitation Survey 26QA111.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been added to:
Site Visit Attendee List:
NAME ORGANIZATION
Marc D'Amato U.S. Army Corps of Engineers
Cooper LaMountain Grindstone Sealcoating
Joe Murphy U-Seal USA
Marty Koziak C&S Masonry and Paving
Lamont Davis Anvil Steel Engineering Inc
George Nevers A-1 Sealcoating
W912WJ26QA1110001
Franco Pabst Pro Seal
Armin Ceric Expert Asphalt LLC
REQUEST FOR INFORMATION:
QUESTION 1: Is the pothole located between Hill Road entrance to dam crease and the road gate included in this repair work?
RESPONSE 1: Yes, the pothole is included in this requirement and the Statement of Work has been revised to include additional specifications, and an additional photo has been included in the revised Attachments.
QUESTION 2: Can coal tar be used in place of an asphalt emulsion?
RESPONSE 2: No, coal tar shall not be used in place of the asphalt emulsion requirement.
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
INTERESTED VENDORS SHALL REVIEW SECTION L AND SECTION M OF THE
SOLICITATION FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE
RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.
FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND
REMOVED FROM CONSIDERATION.
THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY AND
RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED
NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
STATEMENT OF WORK :(REVISED)
PAVEMENT CRACK REPAIR & SEAL COATING
U.S. ARMY CORPS OF ENGINEERS
THOMASTON DAM
THOMASTON, CONNECTICUT
STATEMENT OF WORK
I. GENERAL
1. Summary:
Provide all labor, materials, equipment, and transportation necessary to repair pavement cracks and seal coat the dam crest road at Thomaston Dam in accordance with the Statement of Work.
2. Location:
Thomaston Dam is located at 331 Hill Road, Thomaston, CT 06787. See the attached informational photos for more detailed location information.
3. Site Visits:
Site visits are strongly recommended to gauge the full scope of work and provide an accurate quote.
A scheduled site visit for interested vendors will be listed in the solicitation. Interested vendors should attend the site visit to confirm understanding of the scope, inspect field conditions, access, and existing utilities prior to bidding. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.
Please note, site visits outside of these specific date and time are not permitted unless additional site visit dates/times are publicized in an amendment. All questions during site visit will be sent to the Contract Specialist as indicated in the Instructions to Vendors and responses will be provided in an amendment. Information incorporated into the solicitation via amendment will become binding.
4. Technical Point of Contact:
The Technical Point of Contact for this project is Civil Engineering Technician Marc D'Amato, marc.
a.damato@usace.army.mil (978)318-8898.
5. Schedule:
The period of performance shall be 210 days from Contract Award date. Work shall be performed Monday through Friday between the hours of 7:00 AM and 3:30 PM unless otherwise approved by the Technical Point of Contact. Any proposed changes to an approved schedule must be submitted to the Technical Point of Contact in writing and are not finalized until approved. No work shall be done on weekends or Government holidays.
All pre-construction submittals shall be submitted within 21 days of Contract Award. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.
No field work may proceed prior to the acceptance of pre-construction submittals.
6. Safety Requirements:
a. General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf
A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf
d. Site Safety and Health Officer (SSHO) Requirements:
The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.
b and 2-4.b.
Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf
e. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
f. Additional Personnel Requirements:
Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.
g. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76 /Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf
h. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.
7. Pre-Construction Conference:
Prior to the start of any site work, the Technical Point of Contact will schedule and conduct a pre-construction conference. The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project, and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No site work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the pre-construction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this pre-construction conference:
Authority of the Technical Point of Contact
Contractor's Safety Program (including sub-contractors)
Accident Prevention Plan and Activity Hazard Analysis
Accident Reporting (ENG Form 3394)
Correspondence, Communication and Administrative Procedures
Invoice and payment
8. Permits:
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
9. Security:
The Contractor will comply with all established security policies at the project. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent work in an area. The Contractor shall be given at least 24-hour notice of any such closure.
10. Payment:
Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the Contractor may request multiple payments.
II. TECHNICAL
1. Submittals:
Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government within 14 days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government.
Pre-construction Submittals: Submitted within 21 days of Contract Award. Submittals must be accepted before the commencement of any field Work.
ENG Form 6293 (Accident Prevention Plan)
ENG Form 6206 (Activity Hazard Analysis)
ENG Form 6282 (Site Safety and Health Officer Designation Letter)
First Aid and CPR Certificates
Product specification & SDS sheets
All Certification(s) and License(s) as determined by the Statement of Work.
2. Clean Up:
The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.
Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
3. Government Resources:
The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.
4. Damage to Government and Private Property:
The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm's operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm's operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the firms' operation.
5. Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
6. Quality Assurance:
The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
7. Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by Government employees.
8. Sustainability & Environmentally Preferred Products:
Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
Furthermore, the Contractor should also meet the BioPreferred Program requirements. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov /BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio based content level requirements.
9. Environmental Protection:
Containers for excess and/or waste materials shall be provided by the Contractor at the site, and the site will be inspected/cleaned on a daily basis. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
10. Receiving and Storing Materials:
The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the Contractor and will not be responsible for damage to Contractor equipment or material.
11. Existing Conditions:
a. Thomaston Dam Crest Road
The dam crest road measures approximately 2,000' in length and is divided into two sections, separated by a concrete spillway channel bridge. The average width of the road measures 18.5' and includes a small turnaround area measuring approximately 3,400ft2. The majority of the dam crest road has a wire guardrail, except for a steel guardrail section which measures approximately 100' in length in the roundabout on the northwest end. Refer to Informational Photos attachment for layout of the work area. Large cracks and voids have formed on the pavement. Some measure greater than 1" in separation. Approximately 1,000 linear feet of cracks exist on the dam crest road which will require repairs prior to seal coating. The dam crest road was last chip sealed approximately twelve years ago.
One pothole measuring approximately 24"W x 36"L and 2" deep will require square cutting of asphalt and repairing with asphalt patch (See Informational Photo 5).
Dam crest road can be closed off for use starting at the gate (see Informational Photos), so some means of closure will be necessary between Hill Road and the dam crest road gate.
12. Products:
a. Hot Pour Crack Filler
i. Must conform to ASTM D6690 Type II, ASTM D3405, AASHTO M324 Type II & AASHTO M301 requirements.
ii. Hot applied oil jacketed crack filler
iii. Must be tested to withstand temperatures below 0(d) F after curing.
b. Asphalt Mortar
i. Epoxy-based asphalt overlay mortar
ii. Aggregate size: 1/4" and smaller
c. Asphalt Emulsion Sealer
i. Water-based asphalt emulsion sealant
ii. Color: Flat black
iii. Must be tested to withstand temperatures below 0(d) F after curing.
d. Asphalt Patch
i. Cold-Mix, High-Performance (HP)
ii. Workable at temperatures between 0F and 100F
iii. Allows traffic flow after compaction and manufacturer recommended cure time.
Note: The Contractor is responsible for ensuring that the sealant permanently bonds to the repair mortar. All products used must be compatible with each other to prevent material failure or delamination.
III. EXECUTION:
Installation of products and execution of work shall occur in accordance with the Statement of Work and all local, state, and federal requirements. The Contractor is responsible for ensuring that all surfaces are prepared according to manufacturer's specifications before all products are applied. No products shall be applied if site conditions including humidity, temperature, or other factors are not within the manufacturer's specified ranges.
1. Dam Crest Road
a. Clear and repair all cracks along Dam Crest Road.
i. The Contractor shall remove all old sealant from cracks and voids by means of mechanical crack routing.
ii. The Contractor shall clear all cracks and voids of all loose particulates, or to a depth of 3" in places where the pavement has entirely split, by means of either high-pressure water or high-pressure air to ensure adhesion of new material.
iii. The Contractor shall fill all cracks and voids measuring more than 1" in separation and/or 1" in depth with asphalt mortar and compact newly added material.
iv. After newly added asphalt mortar has completely cured, the Contractor shall use a hot air lance to remove moisture and melt residual sealant before applying asphalt sealer atop all cracks and voids that were filled with new material.
v. The work area is a common path for pedestrians and vehicles. Although the dam road vehicle access gate can be closed by staff, the Contractor will be required to post signage, traffic cones, or some other visual aid to alert visitors to the application. Signage is required to remain onsite until the sealer has fully cured, at which point the Contractor is required to remove the visual aid.
vi. Hot pour crack filler and asphalt mortar will not be applied if conditions do not meet the manufacturer's specifications including humidity, temperature, or other factors. Project staff may postpone application of hot pour crack filler if weather reports are not within manufacturer's required ranges.
b. Repair Pothole Located between Hill Rd and Entry Gate (See Informational Photo 5)
i. Cut square or rectangular boundaries at least two inches (2") beyond the damaged perimeter.
ii. Remove loose asphalt, debris, and dirt and clean cavity thoroughly using compressed air or high-pressure water.
iii. If necessary, add 1" aggregate layer to form solid base and compact using hand tools.
iv. Apply thin, uniform coat of asphalt emulsion to vertical edges and bottom of cavity to act as adhesive binder.
v. If pothole is deeper than two inches (2"), material shall be placed in layers not to exceed two inches (2") thick and allowed to fully cure prior to application of more layers.
vi. Allow patch to fully cure before traffic is permitted.
c. Prepare the entire asphalt surface and apply an asphalt emulsion sealer. The sealant must be smooth and of uniform consistency after fully curing.
i. The Contractor is responsible for reclaiming the edge of the paved surface. Years of dirt and debris may have pushed the exposed edges inwards.
ii. During the application of asphalt emulsion sealer, the Contractor is responsible for deploying signage and traffic cones along the perimeter of the work area as a visual indicator to the public, particularly at the intersection of Hill Rd and the dam crest road and at the bottom of the pedestrian staircase from Vista parking area.
iii. No seal coat shall be applied to area of pothole under this contract to allow for proper curing of patch materials.
iv. All signage and traffic cones must remain in place for the entire cure time as listed in the manufacturer's specifications.
| IDCode: J |
| Page: 1 |
| Pages: 13 |
| AmendNo: 0001 |
| EffDate: 11 JUN 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA111 |
| SolDate: 03 JUN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide a site visit attendee list, provide responses to questions from industry, provide a revised Statement of Work and revised Attachments, and to remove the Draft watermark from the solicitation. |
Solicitation closing remains June 17, 2026 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 11 JUN 2026 |