This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the U.S. Army Corps of Engineers (USACE) New England District for solicitation W912WJ26QA004, dated 14 OCT 2025. The amendment addresses four industry questions regarding a construction project, providing clarifications on staging areas, asphalt placement temperature restrictions, traffic control responsibilities, and parking space striping requirements. The solicitation closing remains October 28, 2025, at 5:00 PM Eastern. Key clarifications include: contractors must independently arrange staging/storage areas, air temperature restrictions for asphalt placement will not be waived, all traffic control materials are contractor-provided, and all parking space striping must use thermoplastic paint with high-visibility glass beading.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments 26QA004_Revised.pdf | ||
| Amendment W912WJ26QA004-0003.pdf | ||
| Amendment W912WJ26QA004-0001.pdf | ||
| Attachments 26QA004.pdf | ||
| Solicitation W912WJ26QA004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been modified to:
REQUEST FOR INFORMATION:
QUESTION 1: Will there be designated staging or laydown areas provided by the Government at either site for equipment and materials, or should we plan to arrange offsite storage independently?
RESPONSE 1: There are no designated staging or laydown areas. Contractors shall submit any requests for staging, storage, or laydown areas on Government property to the Technical Point of Contact for review.
QUESTION 2: The Statement of Work indicates that asphalt placement is restricted when air temperatures are below 40F. Considering the early spring timeline for completion, would it be possible for this temperature limitation to be waived or adjusted based on the actual conditions at the site, if deemed appropriate?
RESPONSE 2: No, the air temperature restrictions will not be waived or adjusted based on site conditions.
QUESTION 3: For temporary lane closures and traffic control signage, can you confirm if those materials will be provided by USACE, or should they be included in the Contractor's responsibilities as part of the project scope?
RESPONSE 3: There will be no traffic control materials provided by the Government. All traffic control materials and signage shall be the responsibility of the Contractor as addressed in section I.9. Area
, of the Statement of Work. Closure and Traffic Control
QUESTION 4: Please clarify which line striping needs to be thermoplastic and which needs paint with beads?
RESPONSE 4: All parking space striping paint for all lines shall consist of both thermoplastic paint and high visibility glass beading, as stated in Part 2.3. , of the Statement of Parking Space Striping Paint Work.
W912WJ26QA0040002
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0002 |
| EffDate: 21 OCT 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA004 |
| SolDate: 14 OCT 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: AMENDMENT IS NECESSARY TO PROVIDE RESPONSES TO QUESTIONS FROM INDUSTRY. QUESTION #4 IS APPLICABLE TO THIS AMENDMENT. |
SOLICITATION CLOSING REMAINS OCTOBER 28, 2025 AT 5:00 PM EASTERN.
ALL OTHER TERMS AND CONDITION REMAIN UNCHANGED.
| ContNameTitle: |
| CoNameTitle: JENNIFER SAMELA |
| ContDate: |
| CODate: 21 OCT 2025 |