This document is a standardized Pump Station Inspection Checklist for the Devens Consolidated Landfill, created by SERES and ARCADIS. The checklist provides a comprehensive template for systematically documenting the status and condition of various site components and equipment, including site appearance, air supply pumps, leachate pumps, ventilating fan, pump enclosure heater, discharge plug valve, flow meter readings, auto dialer, and site maintenance. The inspection form allows for detailed tracking of pump statuses, circuit breaker conditions, selector switch positions, elapsed time, air flow readings, water levels, and whether maintenance was performed or is needed, with options to select "Yes" or "No" for most inspection items and space for additional comments.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Devens Consolidated Landfill Pump Station Inspection Checklist
Date:____________ Time:___________ Inspector:___________ Weather:_______________________________
Inspection Category Inspection Item Select/Complete Comments
Fence Inspected? Yes No
Gate Inspected? Yes No
Pump Enclosure Inspected? Yes No
Panels Inspected? Yes No
Leachate Well Inspected? Yes No
Meter Pit Inspected? Yes No
Pump #1 Status On Off
Pump #2 Status On Off
Bubbles in Leachate Well? Yes No
Air Flow Reading (scfm)
Pump #1 Circuit Breaker Status On Trip Off
Pump #2 Circuit Breakers Status On Trip Off
Pump #1 Selector Switch Status Hand Off Auto
Pump #2 Selector Switch Status Hand Off Auto
Lead/Lag Switch Status #1 Auto #2
Pump #1 Elapsed Time (hours)
Pump #2 Elapsed Time (hours)
Checked? Yes No
Vent Status Open Closed
Checked? Yes No
Status On Off
Exercised w/ Pumps Off? Yes No
Position Open Closed
Total (Gallons)
Resettable Totalizer (Gallons)
Flow Rate (gpm)
Water Level (ft bgs)
Auto Dialer Status Normal Disarmed
Maintenance Performed? Yes No
Maintenance Needed? Yes No
Site Maintenance
Flow Meter Readings
Site Appearance
Air Supply Pumps
Leachate Pumps
Ventilating Fan
Pump Enclosure Heater
Discharge Plug Valve