Attachments 25QA099.pdf
PDF 1 MB Posted
- Solicitation number
- W912WJ25QA099
About this file
This document is a Statement of Work (SOW) for a Furnace Replacement project for the U.S. Army Corps of Engineers at the Colebrook River Lake facility in Colebrook, Connecticut. The SOW includes informational photos documenting the existing furnace system, facility infrastructure, and site conditions. The current furnace is a 200K BTU Metromatic Highboy oil-fired furnace, which is no longer in production and estimated to be 82% or less in Annual Fuel Utilization Efficiency (AFUE). The facility includes additional infrastructure such as an electrical panel on the first floor and an elevator with a 1200-pound capacity. The site is located off Route 8 North and features a dam and lake with surrounding forested terrain. The photos provide detailed views of the existing furnace, ductwork, oil burner assembly, and facility access points, which will likely be used to inform the replacement furnace specifications and installation requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ25QA099.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FURNACE REPLACEMENT
U.S. ARMY CORPS OF ENGINEERS
COLEBROOK RIVER LAKE
COLEBROOK, CONNECTICUT
Statement of Work
Informational Photos
Colebrook River Lake Aerial View, Located off of Rt 8 North, Colebrook, CT
COLEBROOK
RIVER LAKE
COLEBROOK RIVER LAKE
Colebrook River Lake Tower & Access Bridge
COLEBROOK RIVER LAKE
Colebrook River Lake Furnace, Located on Floor Below Main Level
COLEBROOK RIVER LAKE
Colebrook River Lake Furnace, Ductwork
COLEBROOK RIVER LAKE
Colebrook River Lake Existing Furnace, Nameplate: 200K BTU Metromatic Highboy Furnace (no longer in production/company closed). Estimated 82% or less AFUE
COLEBROOK RIVER LAKE
Colebrook River Lake Furnace, Oil Burner Assembly
COLEBROOK RIVER LAKE
Colebrook River Lake, Ductwork and Cleanout
Existing Gatehouse electrical panel located on first floor.
Colebrook River Lake Elevator – Capacity 1200lbs.
File details come from the government source that posted it. Updated .