Amendment W912WJ25QA053-0003.pdf

PDF 722 KB Posted

Attached to
Intrusion Detection System Replacement, Franklin Falls Dam, Franklin, NH and Blackwater Dam, Webster, NH
Solicitation number
W912WJ25QA053
Issued by

About this file

This document is a Standard Form 30 Amendment to Solicitation W912WJ25QA053, issued by the U.S. Army Corps of Engineers New England District, addressing an Intrusion Detection System (IDS) replacement project at Franklin Falls Dam and Blackwater Dam in New Hampshire. The amendment provides responses to two industry questions regarding the solicitation: first, clarifying that existing conduits can be reused if they are serviceable and meet code requirements, and second, confirming that combo panels are acceptable under specific regulatory guidelines (AR 190-51, UL standards, and NFPA 72) without requiring a separate waiver. The solicitation remains unchanged, with the closing date maintained as July 30, 2025 at 5:00 PM Eastern, and the project is set aside for small businesses with a NAICS code of 238210 and a size standard of $19 million.

View the file

Other files

File Type Posted
Amendment W912WJ25QA053-0002.pdf PDF
Amendment W912WJ25QA053-0001.pdf PDF
Attachment A.pdf PDF
Solicitation - W912WJ25QA053.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 2

0003 25 JUL 2025

W912WJ

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE:

978-318-8324

SCD: PAS:

W912WJ25QA053

01 JUL 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

AMENDMENT IS NECESSARY TO PROVIDE RESPONSES TO QUESTIONS FROM INDUSTRY.

CLOSING REMAINS JULY 30, 2025 AT 5:00 PM EASTERN.

ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

JENNIFER SAMELA

25 JUL 2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been added to:

REQUEST FOR INFORMATION:

Question 1: Would you consider clarifying the Request for Quotations by revising language to state that "existing conduits to be reused and pathways between buildings is sufficient for install and serviceable"?

Response 1: The Statement of Work states in "Products" and "Execution" that existing EMT or FMC may be re-used providing that all existing wire is removed, that it is serviceable, and it still meets all appropriate code requirement. It is the awarded Contractor's responsibility to ensure that any EMT or FMC that is reused can meet these conditions. If not, per the solicitation, these shall be removed and replaced.

Questions 2: Can you verify that the Corps of Engineers has a waiver on file for the use of combo panels? to meet current Federal code requirements and for future upgrades or extensions, it is recommended that each system have its own panel.

Response 2: A waiver is not required as these sites are classified as Civil Works and Lake Project Resources, which fall under the guidance of AR 190-51. AR 190-51 requires central monitoring to be in accordance with UFGS 28 20 02, Central Monitoring Services for Electronic Security Systems, which in turn requires UL 827, Central-Station Alarm Services, & UL 1981, Standard for Central-Station Automation Systems, compliance as well as UL 2050, National Industrial Security Systems.

Additionally, NFPA 72 provides a framework for integrating fire alarm systems with other building systems to enhance safety and operational efficiency, while also ensuring that the fire alarm system's critical functions are not compromised.

Therefore, there is no change to the requirements and the systems shall be installed as specified in the Statement of Work.

W912WJ25QA0530003