Amendment W912WJ25QA053-0002.pdf

PDF 776 KB Posted

Attached to
Intrusion Detection System Replacement, Franklin Falls Dam, Franklin, NH and Blackwater Dam, Webster, NH
Solicitation number
W912WJ25QA053
Issued by

About this file

This document is an Amendment to Solicitation W912WJ25QA053 for an Intrusion Detection System (IDS) replacement project at two U.S. Army Corps of Engineers locations in New Hampshire. The project involves removing portions of existing intrusion detection systems and installing new security systems across ten buildings: six at Franklin Falls Dam in Franklin and four at Blackwater Dam in Webster. The contractor must comply with National Electrical Code, New Hampshire Building Code, and applicable Fire Codes. Key requirements include installing new premise control units, keypad control panels, motion sensors, door sensors, smoke detectors, alarm sirens, and associated wiring at each location, with specific placement and installation guidelines. The amendment adds an additional contact for site visits and maintains the original closing date of July 30, 2025 at 5:00 PM Eastern. The project is set aside for small businesses with a NAICS code of 238210 and a small business size standard of $19 million, with an estimated construction value between $100,000 and $250,000.

View the file

Other files

File Type Posted
Amendment W912WJ25QA053-0003.pdf PDF
Amendment W912WJ25QA053-0001.pdf PDF
Attachment A.pdf PDF
Solicitation - W912WJ25QA053.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 24

0002 14 JUL 2025

W912WJ

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE:

978-318-8324

SCD: PAS:

W912WJ25QA053

01 JUL 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

AMENDMENT IS NECESSARY TO ADD AN ADDITIONAL CONTACT FOR SITE VISITS. PLEASE REFER TO THE REVISED STATEMENT OF WORK FOR CONTACT INFORMATION. INTERESTED VENDORS SHALL CONTACT EITHER JOSHUA LEVESQUE OR TIA MERCER FOR SITE VISITS.

CLOSING REMAINS JULY 30, 2025 AT 5:00 PM EASTERN.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

JENNIFER SAMELA

14 JUL 2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section C - Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

INTRUSION DETECTION SYSTEM

U.S. ARMY CORPS OF ENGINEERS

FRANKLIN FALLS DAM

FRANKLIN, NEW HAMPSHIRE

BLACKWATER DAM

WEBSTER, NEW HAMPSHIRE

STATEMENT OF WORK

REVISED

I. General

1. Scope - Furnish all equipment, materials, and labor necessary to remove portions of an existing intrusion detection system (IDS) and install a new IDS at two (2) project locations: six (6) buildings at Franklin Falls Dam, Franklin, NH and four (4) buildings at Blackwater Dam, Webster, NH. The Contractor shall install the new security system in compliance with the National Electrical Code, New Hampshire Building Code, and applicable Fire Codes. All work shall be completed in accordance with the following Statement of Work.

NOTE: This work requires the following submittals prior to commencement of work (Refer to Section II.

Technical Requirements for a full list of submittals):

ENG Form 6293 (Accident Prevention Plan Worksheet) Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis) ENG Form 6282 (Site Safety and Health Officer Designation Letter) First-Aid and CPR Personnel requirements Product Data Sheet(s) - Prior to ordering.

Safety Data Sheets (SDS) - Prior to ordering material/product.

Schedule of work Any required permits National Defense Authorization Act (NDAA) Certification - Specifically Section 889, prior to ordering and before field work.

All Certifications and Licenses as determined by the Statement of Work.

2. Location(s) - The Franklin Falls Dam Project Office is located at 46 Granite Drive, Franklin, NH 03235. The Blackwater Dam Project Office is located at 43 White Plains Road, Webster, NH 03303.

3. Site Visit - Contact the Technical Point of Contact (TPOC) to arrange a site visit. The TPOC for the project is Environmental Protection Specialist, Joshua Levesque at 978-318-8304 or Joshua.S.

Levesque@usace.army.mil. Site visits may be scheduled by contacting Project Manager Tia Mercer, tia.

m.mercer@usace.army.mil or 978-318-8323.

4. Schedule - The period of performance shall be 180 days from Notice to Proceed. Work shall

W912WJ25QA0530002

commence within 45 days of Notice to Proceed, proceed diligently, and be completed for use no later than 180 days after Notice to Proceed. Work shall be performed Monday through Friday 7:00 AM to 3:30 PM unless otherwise approved in advance by the TPOC. No work shall be done on weekends or Government holidays, unless otherwise approved in advance by the TPOC. The Pre-Construction Conference shall be completed within 21 days from Notice to Proceed.

All Pre-Construction submittals shall be submitted within 45 days of Notice to Proceed. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt.

If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of Pre-Construction submittals.

5. Safety Requirements

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link: https://www.publications.usace.

army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and /or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work: https://www.publications.usace.army.mil/Portals/76 /Eng_Form_6293_Aug%202024%20-%20FINAL.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-%20FINAL.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Sontractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter): https://www.publications.usace.army.mil/Portals/76 /Eng_Form_6282_Site%20Safety%20&%20Health%20Officer%20(SSHO)%20Designation% 20Letter_2024%2009%2013%20-%20Final.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Statement of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms /Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

6. Specific Safety Section - Electrical:

a. General Requirements (EM385-1-1, Para. 11-8): All electrical work must comply with EM 385-1-1 (Chapters 11 & 12) and applicable American National Standards Institute (ANSI), ASTM International Standards, Electrical and Electronics Engineers Association (IEEE), National Fire Protection Association (NFPA), National Electric Safety Code (NESC), Occupational Health and Safety Administration (OSHA), Underwriters Laboratories (UL), Unified Facilities Criteria (UFC), and those regulations outlined in 29-CFR-1910 and 29-CFR-1926. In the circumstance where a discrepancy between the codes and regulations listed above, or an omission exists, the most stringent regulations shall apply.

All electrical wiring and equipment must be a type listed by a Nationally Recognized Testing Laboratory (NRTL) for the specific application for which it is to be used. For equipment not listed by a NRTL, the Authority Having Jurisdiction (AHJ) must determine if use is allowable.

b. Roles and Responsibilities:

i. Qualified Persons (QPs) Electrical: QPs must demonstrate the skills and knowledge related to the construction, operation, and maintenance of electrical equipment and installations, and receive relevant safety training to recognize, avoid, and control associated hazards that might be present. (EM385-1-1, Para. 11-3.b). QPs will meet requirements in accordance with EM 385-1-1, Chapters 11-3 and 11-4.

ii. Personnel that install and/or remove electric conductors, equipment, or raceways, or manipulate cables must have verifiable credentials and be familiar with applicable code and electrical safety requirements.

Verifiable credentials consist of national, state, or local certifications or licenses of a Master or Journeyman Electrician.

c. Establishing an Electrically Safe Work Condition (ESWC):

i. All equipment and circuits must be placed into an ESWC by a Qualified Person (QP) before worked is performed, in accordance with EM385-1-1, 11-8.d.

d. Minimum Plan Requirements:

i. An Electrical Safety Plan (ESP) is required in accordance with EM 385-1-1, Chapter 11-7 when personnel perform work that involves electrical hazards.

e. Energized Electrical Work:

i. Energized electrical will require prior authorization. Reference EM 385-1-1, 11-8.e for additional requirements of performing work on energized electrical equipment.

7. Pre-Construction Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction Conference the Contractor shall provide the name of the Project Superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Construction Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor's Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Documented Safety Meetings

v. Accident Reporting (ENG Form 3394)

vi. Safety Data Sheet (SDS) requirements

vii. Contractor's Equipment

viii. Correspondence, Communication, Security and Administrative Procedures.

ix. Invoice and payment.

8. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security - The Contractor will comply with all established security policies at the USACE project. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent work. The Contractor shall be given at least 24-hour notice of any such closure. Alarm security equipment requirements are listed in sections below.

10. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the Contractor may request progress payment.

All invoices may be mailed to:

U.S. Army Corps of Engineers Merrimack River Basin ATTN: Joshua Levesque 2097 Maple Street Contoocook, New Hampshire 03229

Or emailed to: Joshua.S.Levesque@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary - Furnish all equipment, materials, and labor necessary to remove portions of an existing intrusion detection system (IDS) and install a new IDS at two (2) project locations: six (6) buildings at Franklin Falls Dam and four (4) buildings at Blackwater Dam. The Contractor shall install the new security system in compliance with the National Electrical Code, New Hampshire Building Code, and applicable Fire Codes. All work shall be completed in accordance with the following Statement of Work.

2. Submittals - Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal /resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government.

a. Pre-Construction Submittals: Submitted within 45 days of Notice to Proceed. Submittals must be accepted prior to the commencement of any field work.

ENG Form 6293 (Accident Prevention Plan Worksheet) Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis) ENG Form 6282 (Site Safety and Health Officer Designation Letter) First-Aid and CPR Personnel requirements Product Data Sheet(s) - Prior to ordering.

Safety Data Sheets (SDS) - Prior to ordering material/product.

Schedule of work Any required permits National Defense Authorization Act (NDAA) Certification - Specifically Section 889, prior to ordering and before field work.

All Certifications and Licenses as determined by the Statement of Work.

b. Other Submittals:

Manufacturer Data specification sheets - For alarm system components, prior to ordering.

Manufacturer Warranty - For alarm system components, prior to final payment.

Owner's and Installation Manuals - For any new equipment installed, prior to final payment.

Test Plan - Prior to final testing and walk-through.

3. References - All work shall be in conformance with:

a. U.S. Army Corps of Engineers

i. EM-385-1-1 2024 Safety and Occupational Health Requirements, U.S. Army Engineering Manual.

b. Code of Federal Regulations

i. Title 36 - Parks, Forests, and Public Property; Chapter III, Part 327 - Corps of Engineers, Department of the Army.

c. National Defense Authorization Act (NDAA)

i. Section 889 - Procurement and Acquisition of Telecommunication Equipment and Services.

d. National Electrical Code (NEC).

e. National Fire Protection Association (NFPA).

f. Underwriters Laboratories (UL).

g. Other appropriate Federal, State, and local codes.

4. Existing Conditions:

a. Site Access:

i. Franklin Falls Dam - Five (5) buildings (Project Office, 1-Bay Garage, 7-Bay Garage, Coleman Building and Activity Center) are located within 500-feet of one another, at 46 Granite Drive in Franklin, NH and the sixth building, known as the Franklin Gatehouse, is located 1/2 mile further down Granite Drive. Access to the Franklin Gatehouse is achieved via a 200-foot long by 12-foot-wide service bridge (See Informational Map 1).

ii. Blackwater Dam - All four (4) buildings (Project Office, Pole-Barn, 2-Bay Garage, and Blackwater Gatehouse) are located within 650-feet of one another, at 43 White Plains Road in Webster, NH. Access to the Blackwater Gatehouse is achieved via a 225-foot long by 20-foot-wide driveway (See Informational Map 2).

b. General Conditions: The current alarm systems are a stand-alone control system, monitored through normal telephone service by a 3rd party monitoring company for Burglar, Fire/Smoke, Battery, and Temperature.

NOTE: For all Informational Photos and Floor Plans please reference attached Appendix A.

c. Franklin - Project Office: See Informational Photos 21-34.

i. The project office is a single-story ranch styled building with twelve (12) rooms, two side entrance foyers (Front and North side), and a full basement. Conditioned space is approximately 1,850 sq. ft. and the building measures approximately 30'x64'.

ii. The project office is typical 2x4 wooden construction consistent with building codes from the 1940's and is built over a full basement.

iii. There have been some changes to the office since its construction in the early 1940's. Most recently a full interior remodel was completed in 2024.

Test results from building materials showed that asbestos was NOT found in the samples collected. A copy of the report and test results may be requested.

iv. 35 - residential windows and 7 full-sized basement windows.

v. The attic has two forms of insulation; the roof and rafters have a closed-cell spray foam insulation covering. The ceiling joists have rolled fiberglass insulation. Access to the attic is through a covered opening in the ceiling located in the hallway outside of the bathroom.

vi. The basement is accessible from an interior door and stairwell, and two exterior bulkheads. The basement has seven (7) oversized basement windows, all equipped with magnetic contacts.

vii. All telecommunications connections are located inside the basement on the east facing wall. The telecom wires are drilled through a window jam leading to a residential style Demarc Junction Box that is mounted on the interior wall. Currently, all wires leaving the Demarc Junction Box are exposed.

viii. According to the construction plans for this building, the subfloors in the kitchen and in the map/file room are 3" thick concrete subfloors.

ix. Existing Intrusion Detection System Components:

No PCU (The existing PCU in the Activity Center handles the system for this building).

5 -Door Contacts:

a. 2 - Exterior Doors.

b. 1 - Interior Door (door to basement stairwell).

c. 2 - Barn-style wooden hinged doors (located inside the basement bulkheads).

4 - Passive Infrared (PIR) sensors:

14 - Fire/Smoke Sensors:

a. 2 - located in the basement.

b. 2 - located in the attic.

c. 6 - located on the main floor.

d. 4 - discontinued older Fire/Smoke sensors.

6 - Glass Break Sensors:

a. These sensors are deactivated and no longer in use.

4 - Fire Pull Alarms (located at each exit).

1 - Exterior 911 Call Box.

1 - Keypad: Located just inside the North side personnel entry door. This keypad can be used to control all buildings, except the Franklin Gatehouse IDS which is independent.

a. NOTE: This keypad is currently the only control for the 1-Bay Garage IDS.

x. Franklin - Project Office Room Dimensions:

ROOM Square Feet (sq ft) * Front Entrance 45 sq ft Manager's Office 216 sq ft Closet 60 sq ft Office #1 and Closet 150 sq ft Office #2 and Closet 99 sq ft Office #3 95 sq ft Map/File Room 210 sq ft Hallway 44 sq ft Kitchen 180 sq ft North Side Entrance 70 sq ft Foyer 344 sq ft Conference Room 225 sq ft Bathroom 95 sq ft TOTALS 1850 sq ft 1

* All Room Area measurements are approximate.

1 Full basement area is approximately 1850 sq ft.

d. Franklin - 1-Bay Garage: See Informational Photos 23 & 24.

i. The 1-Bay Garage is 12'x20' with 2x4 wooden construction built in the 1940's over a concrete slab.

ii. The 1-Bay Garage is located 10-feet from the Franklin Project Office.

iii. The interior of the garage is unfinished and uninsulated with exposed studs, framing and rafters.

iv. There is NO personnel door for this garage, only a garage bay door.

v. There are two windows, one on each side.

vi. The garage does have power but does NOT have telephone or communication lines.

vii. Existing Intrusion Detection System Components:

1 - Garage door contact.

2 - Window contacts.

No PIR sensors.

1 - Fire/Smoke sensor.

There is NO keypad in this garage. The garage IDS components are tied into the keypad in the Franklin Project Office.

viii. Franklin - 1-Bay Room Dimensions:

ROOM sq ft * Single Open Bay 240 sq ft

* All Room Area measurements are approximate.

e. Franklin - 7-Bay Garage: See Informational Photos 1-7.

i. The 7-Bay Garage is 87'x31', with standard wooden construction built in the 1990's over a concrete slab.

ii. The 7-Bay Garage is located a few hundred feet from the Franklin Project Office on the opposite side of Granite Drive and within sight of the Franklin Project Office.

iii. The interior of the garage is unfinished and uninsulated with exposed studs, framing and rafters.

iv. 200-Amp Sub-Panel.

v. There are two external personnel doors (one on each gable side of the garage), and one internal personnel door passing through a dividing interior wall.

vi. There are no windows in this garage.

vii. There are four (4) - 8'x9' garage bay doors and three (3) - 12'x12' garage bay doors. All garage bay doors are operated via individual electric garage door openers.

viii. Existing Intrusion Detection System Components:

No PCU (The existing PCU in the Activity Center handles the system for this garage).

2 - External side-entry door contacts.

7 - Garage door contacts.

4 - PIR sensors.

15 - Fire/Smoke sensors.

2 - Fire Pull Alarms.

1 - Keypad: Located on the interior wall just inside the Eastern personnel entry door.

ix. Franklin - 7-Bay Room Dimensions:

ROOM sq ft * 4-Bay Room 1,326 sq ft 3-Bay Room 1,326 sq ft TOTALS 2,697 sq ft

* All Room Area measurements are approximate.

f. Franklin - Coleman Building: See Informational Photos 35-41.

i. The Coleman building is approximately 31'x53', with 2x4 wooden construction on concrete masonry knee walls on a concrete slab.

ii. The interior of this building is unfinished and uninsulated with exposed studs, framing and rafters.

iii. There is a small 40-Amp sub panel.

iv. There is a side personnel exterior door and one (1) 8'x8' garage door, each equipped with contact switches.

v. Existing Intrusion Detection System Components:

No PCU (The existing PCU in the Activity Center handles the system for this garage).

2 - External side door contacts.

1 - Garage door contact.

No PIR sensors.

9 - Fire/Smoke sensors.

2 - Fire Pull Alarms.

1 - Keypad: Located just inside the main personnel entry door. This keypad can be used to control all buildings, except the Franklin Gatehouse IDS which is independent.

vi. Franklin - Coleman Building Room Dimensions:

ROOM sq ft * 1-Main Storage Room 1,600 sq ft

* All Room Area measurements are approximate.

g. Franklin - Activity Center: See Informational Photos 8-20.

i. The Activity Center is approximately 35'x70' with 2x4 wooden construction on a concrete slab.

ii. There is a main (front) exterior personnel door and four (4) 10'x10' garage bay doors, all of which are equipped with contact switches. The garage bay doors are operated via individual electric garage door openers.

iii. There is attic access, accessible via a fixed steel ladder which is located in Garage Bay #2.

iv. There is a 100-Amp sub panel located in the main entry room.

v. There are two (2) garage bays each with 2-garage doors and a work area with 12-foot-tall ceilings.

vi. A small, enclosed storage room, construction is brick and mortar and has no exterior access.

vii. The building is insulated and conditioned with heat only by means of forced hot water from an oil-fired boiler. The boiler is located in a partial basement that is located under the main entry room area.

viii. The main (front) entrance room, attached hallway, and bathroom have an office-style drop-ceiling, with ceilings approximately 8-feet tall.

ix. All telecommunications connections are housed in a residential style Demarc Junction Box on the exterior of the building.

x. Typical fiberglass insulation is in all the walls and between the ceiling rafters in the attic.

xi. Existing Intrusion Detection System Components:

1 - PCU with Battery in tamper resistant enclosure (this is tied into all buildings except the Franklin Gatehouse).

1 - External door contact.

4 - Garage door contacts.

3 - PIR sensors.

4 - Fire/Smoke sensors (one in each garage bay, one in the attic, and one in the partial basement).

3 - Glass break sensors.

a. These sensors are deactivated and no longer in use.

1 - Alarm Siren.

3 - Fire Pull Alarms.

1 - Keypad: Located just inside the main personnel entry door with control panel. This keypad can be used to control all buildings, except the Franklin Gatehouse IDS which is independent.

xii. Franklin - Activity Center Room Dimensions:

ROOM sq ft * Front Entrance Room 360 sq ft Storage Room 100 sq ft Garage Bay #1 and Workshop 800 sq ft Garage Bay #2 and Storage 800 sq ft Hallway 45 sq ft Bathroom 45 sq ft Partial Basement 225 sq ft TOTALS 2,375 sq ft

* All Room Area measurements are approximate.

h. Franklin - Gatehouse: See Informational Photos 42-56.

i. The gatehouse is approximately 122'x50' and is built of concrete and steel construction with brick masonry walls and large steel framed windows.

ii. The main operating floor has a 28-foot ceiling and is accessed through an inset personnel door. This access is part of a large double-hung steel door measuring 12'x18'.

iii. There is a French style steel and glass double-doorway leading to a concrete balcony accessible only from within the gatehouse.

iv. There are two interior partitioned spaces at either end of the main operating floor constructed of 2x4 framing and plywood walls with interior windows and an 8' foot ceiling height.

v. The electrical switchgear and backup generator is located in the western partitioned enclosure. The is a standard 120volt breaker panel in this partitioned area and there is also another breaker panel on the northern wall of the gatehouse.

vi. The eastern partitioned enclosure does have internal walls that create three separate rooms within the portioned area.

vii. A partial lower operating floor rests under the main section of the building but shall not be considered for this contract.

viii. There is also a large 50-ton overhead crane with a bridge and trolley.

ix. There is a narrow 200-foot-long by 12-foot-wide service bridge that provides limited vehicle access to the large steel double-doors of the gatehouse.

x. Existing Intrusion Detection System Components:

1 - PCU with Battery in tamper resistant enclosure.

1 - External personnel steel door contact.

1 - External over-sized steel door contact.

2 - PIR sensors.

4 - Fire/Smoke sensors.

1 - Alarm Siren.

1 - Fire Pull Alarm.

1 - Keypad: Located to the left and just inside the main door with control panel. This controls the Franklin Gatehouse IDS ONLY.

xi. Franklin Gatehouse Room Dimensions:

ROOM sq ft * Main Operating Room 2,700 sq ft Western Partitioned Room 300 sq ft Eastern Partitioned Room 300 sq ft TOTALS 3,300 sq ft

* All Room Area measurements are approximate.

i. Blackwater - Project Office: See Informational Photos 57-67.

i. The Project Office is a single-story ranch styled building with six (6) rooms and two (2) side entrances (Front and North side). Conditioned space is approximately 1,300 sq. ft. and the building measures approximately 32'x41'.

ii. The Project Office is typical 2x4 wooden construction consistent with building codes from the 1980's and is built over a concrete slab.

iii. The attic has two forms of insulation; The ceiling joists have rolled fiberglass insulation covered by additional loose cellulose fiber.

iv. The attic is divided in half; Access to the attic above the main office areas is through a covered opening 8-feet up in the ceiling located in the kitchenette outside of the bathroom. Access to the attic above the garage bays in through a covered opening 11-feet up in the ceiling.

v. All telecommunications connections are located outside on the south facing wall through a commercial Demarc Box. The telecom wires are tucked into the vinyl siding and snaked over the garage door opening before entering the building through a small, drilled hole.

vi. The Utility Room has a double-steel door opening out into an unconditioned space used to house the fuel tank.

vii. There is also a concrete and brick storage room located off of the garage bay, but this room has no exterior access points.

viii. Existing Intrusion Detection System Components:

The PCU is located inside the garage bay wall shared by the office area.

4 -Door Contacts:

a. 2 - Exterior Entrance Doors.

b. 2 - Garage Bay Doors.

2 - Passive Infrared (PIR) sensors:

5 - Fire/Smoke Sensors:

a. 1 - located in the Front Entrance Room.

b. 1 - located in the Garage Bay.

c. 1 - located in the kitchenette.

d. 1 - located in the Utility Room.

3 - Glass Break Sensors:

a. These sensors are deactivated and no longer in use.

2 - Fire Pull Alarms (located at each pedestrian-style door exit).

1 - Keypad: Located to the right and just inside the main door. This keypad can be used to control all buildings.

ix. Blackwater Project Office Room Dimensions:

ROOM sq ft * Front Entrance Room 185 sq ft Kitchenette 90 sq ft Bathroom 110 sq ft Utility Room 100 sq ft Garage Bays 750 sq ft Storage Room 60 sq ft Fuel Tank Room 80 sq ft TOTALS 1,375 sq ft

* All Room Area measurements are approximate.

j. Blackwater - Pole Barn Garage: See Informational Photos 68-72.

i. The Pole Barn Garage is a single-story, barn-style, unconditioned building with a single storage room with one side entrance and a 10'x8' garage bay door. Total space is approximately 480 sq. ft. and the building measures approximately 20'x24'.

ii. The Pole Barn Garage is typical 2x4 wooden construction consistent with building codes from the 1980 and 1990's and is built over a concrete slab.

iii. The rafters and studs are all fully exposed.

iv. All telecommunications connections lead from the Blackwater Project Office and are buried in grey-electrical conduit and comes into the building from the north-west exterior wall.

v. Existing Intrusion Detection System Components:

1 - Exterior Side Entrance Door.

2 - Fire/Smoke Sensors:

1 - Glass Break Sensors:

a. These sensors are deactivated and no longer in use.

1 - Fire Pull Alarm.

1 - Keypad: Located to the left and just inside the main door. This keypad can be used to control all buildings.

a. NOTE: This building has no utility power other than what is provided through the buried electrical conduit.

vi. Blackwater Pole Barn Garage Room Dimensions:

ROOM sq ft * Garage Bay 480 sq ft

* All Room Area measurements are approximate.

k. Blackwater - 2-Bay Garage: See Informational Photos 73-77.

i. The 2-Bay Garage is a single-story conditioned building with a single storage room with one side entrance and two (2) 8'x8' garage bay doors. Total space is approximately 480 sq. ft. and the building measures approximately 20'x24'.

ii. The 2-Bay Garage is typical 2x4 wooden construction and is built over a concrete slab.

iii. The attic accessible through a large ceiling covering measuring approximately 4'x4'.

iv. There are utilities through a small service panel and all telecommunications connections lead from the street connecting through a Demarc box on the south wall.

v. Existing Intrusion Detection System Components:

3 - Contacts:

a. 1 - Exterior Side Entrance door.

b. 2 - Garage Bay doors.

2 - Fire/Smoke Sensors:

1 - Fire Pull Alarm.

1 - Keypad: Located to the left and just inside the main door. This keypad can be used to control all buildings.

vi. Blackwater 2-Bay Garage Room Dimensions:

ROOM sq ft * Garage Bay 480 sq ft

* All Room Area measurements are approximate.

l. Blackwater - Gatehouse: See Informational Photos 78-85.

i. The gatehouse is approximately 40'x23' and is built of concrete and steel construction with brick-glass masonry windows.

ii. The main operating floor has a 16'-6" tall ceiling and is accessed through an inset personnel door. This access is part of a garage bay door measuring 9'wide x10'tall.

iii. There is an upper balcony along one end of the operating floor accessible by a fixed steel ladder.

iv. The electrical switchgear and backup generator is located on the main floor. There is a standard 120-volt sub-breaker panel with 225-amp.

v. A partial lower operating floor rests under the main section of the building but shall not be considered for this contract.

vi. There is a stairwell leading up 3 flights to an upper entrance door.

vii. There is a 21-foot-wide service road that provides limited vehicle access to the gatehouse.

viii. Existing Intrusion Detection System Components:

1 - External steel inset Entrance Door contact.

1 - External Garage Bay Door contact.

2 - PIR sensors.

1 - Fire Pull Alarm.

1 - Keypad: Located to the left and just inside the main door. This keypad can be used to control all buildings.

ix. Blackwater Gatehouse Room Dimensions:

ROOM sq ft * Main Operating Room 680 sq ft Balcony 240 sq ft Stairwell (to Upper Access Structure Entrance) 80 sq ft TOTALS 1,000 sq ft

* All Room Area measurements are approximate.

5. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

6. Clean up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas, free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC.

All waste material will be disposed of offsite in accordance with all Federal, State, and local regulations.

7. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/cleaned on a daily basis when working onsite. Water, air, and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.

8. Sustainability & Environmentally Preferred Products - Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm /comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

Furthermore, the Contractor should also meet the BioPreferred Program requirements. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site:

https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

9. Building Protection - Any involved building or structure, and all its contents shall be protected from the elements during the duration of this contract. The Contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather-related event that could cause damage to the building and or any of its contents during all phases of this contract.

10. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

11. Government Resources - The Government will supply any electricity necessary for the project work from points of existing outlets when available. The Contractor shall carefully conserve the use of electricity provided. The Contractor shall supply his own means of communication (telephone). There is a restroom available at the contract site, and there is access to potable water.

12. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

13. Contractor's Personnel -

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note: At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with Code of Federal Regulations Title 36, Chapter III, Part 327, and all Federal, State, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee(s).

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors.

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

14. Quality Assurance - The Contractor is responsible for the quality control of the contract work. The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

15. Inspections -

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - Upon the completion of each requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Statement of Work. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections - The TPOC may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the TPOC. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

d. Government Inspections - The Government will monitor the Contractor's work and make deductions accordingly for work not corrected with the time permitted.

16. Receiving and Storing Materials - The Contractor is responsible for receiving and unloading of delivered goods. The Contractor is responsible for protecting any stored material until it is placed in service. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.

17. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Part 2 Equipment:

1. Condition of Equipment - All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Occupational Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

2. Type(s) of Equipment -

a. The Contractor shall provide the appropriate equipment and tools of the trade to execute the requirements of the Statement of Work.

b. Type(s) of equipment for this work may include, but not be limited to various hand and power tools, ladders, electrical tools, and PPE.

3. Equipment Storage - Various equipment and supplies may be stored onsite within the work areas.

NOTE: Government does not assume security for any lost or damaged equipment or materials stored on-site.

Part 3 Materials and Supplies:

The Contractor must furnish materials of sufficient quantity and quality to ensure the satisfactory performance of the contract. It is the Contractor's responsibility to take accurate field measurements to ensure required quantities of materials and supplies for a proper fit and finish.

1. Provided by the Government:

a. None

2. Provided by the Contractor:

a. Premise Control Unit: UL 1023

b. Tamper Resistant Component Enclosures

c. Tamper Switches: UL 634

d. Keypad control panel: UL 864

e. Wiring and Wire Enclosure Components

f. Dual Technology Passive Infrared Sensors and Microwave Sensors (Motion Sensors): UL 639

g. High Security Balanced Magnetic Switch (BMS) (Door Sensors): UL 634

h. Photoelectric and Ionization Combination Smoke Detectors and Heat Detectors: UL 268

i. Alarm Sirens: UL 464

j. Fire Alarm Pull Station: UL 38

k. All Owner's and Installation manuals for new products being installed. These must be submitted prior to final payment.

l. Any lumber, wood filler, joint compound, hardware and miscellaneous supplies, connections, boxes, or connections needed.

m. Miscellaneous cleaning materials for area preparation and for final cleaning.

NOTE:

1. The Contractor provided materials and supplies listed above may not include all miscellaneous items needed for a sound and professional installation. It is the responsibility of the Contractor to provide any omitted items to complete the required work.

2. All Contractor supplied materials to be…