Amendment W912WJ25QA018-0003.pdf

PDF 3 MB Posted

Attached to
Storage Building Construction, Buffumville Lake, Charlton, MA
Solicitation number
W912WJ25QA018
Issued by

About this file

This document is a Standard Form 30 Amendment to Solicitation W912WJ25QA018 for a storage building construction project at Buffumville Lake in Charlton, Massachusetts. The amendment provides responses to eight industry questions and announces an additional site visit on May 5, 2025, at 9:00 AM Eastern. Key technical details include: the building will be an unheated, uninhabited storage space approximately 40' wide by 50' long, located in Climate Zone 5, requiring R-13 insulation for walls and ceiling. The project involves constructing a pre-engineered truss metal building with a single-phase 200A electrical feed, twelve outlets, and additional electrical conduit work to connect to the main distribution panel.

The solicitation is set aside for small businesses under NAICS code 236220 with a size standard of $45 million, with a construction value between $100,000 and $250,000. The contract requires an active SAM.gov registration, and vendors must comply with the National Electrical Code during installation. Two site visit attendee lists are included, featuring representatives from various construction companies and the U.S. Army Corps of Engineers. The solicitation closing remains May 13, 2025, at 5:00 PM Eastern, with all other terms and conditions remaining unchanged.

View the file

Other files

File Type Posted
Amendment W912WJ25QA018-0002.pdf PDF
Attachments 25QA018_Revised.pdf PDF
Amendment W912WJ25QA018-0001.pdf PDF
Solicitation W912WJ25QA018.pdf PDF
Attachments 25QA018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been modified to:

REQUEST FOR INFORMATION

QUESTION 1: What is the purpose of the building, and will it be heated? Depending on those factors, the insulation values called out in the contract might contradict the Massachusetts State Building Code 780 CMR which is also called out.

RESPONSE 1: According to 780 CMR 25.210, combined with the allowances for metal building construction, the insulation values specifically called out for the walls and ceiling do not contradict Massachusetts State Building Code 780 CMR. The building will be an unheated space and uninhabited, intended solely for storage. Combined with being located in Climate Zone 5, the minimum R-value mandated by the state is R-13 for the walls and ceiling.

QUESTION 2: It was noted during the formal site visit that the existing electrical conduit which will be used to feed power to the storage building is not entirely connected to the main panel within the Buffumville office. How will this be addressed?

RESPONSE 2: The Statement of Work has been revised to include additional work to extend the existing 2" electric metallic tubing (EMT) conduit stub out to the main distribution panel in the project office.

Please refer to the revised Statement of Work and revised Attachments for additional information.

QUESTION 3: Would the Government be willing to provide photos & location of the existing main distribution panel?

RESPONSE 3: Please see the revised Attachments for additional photos.

QUESTION 4: Will an additional formal site visit be scheduled?

RESPONSE 4: Yes, an additional site visit has been scheduled for Monday, May 5, 2025 at 9:00 AM Eastern at 48 Old Oxford Road, Charlton, MA 01507.

QUESTION 5: Are there benchmark elevations on property?

RESPONSE 5: Please refer to the Statement of Work section 16.a.ii Execution, "The Contractor is responsible for all layout and field engineering required for the completion of this project. The Government will not provide any survey services."

QUESTION 6: Would you accept an engineered wood framed and wood trussed building?

RESPONSE 6: No, as specified in the Statement of Work, the building shall be a pre-engineered truss metal building.

W912WJ25QA0180003

QUESTION 7: The 200A feed to the new building, is this Single phase or Three Phase?

RESPONSE 7: The main distribution panel in the office is fed by Three phase power. From there, the 200A feed to the new building shall be Single phase.

QUESTION 8: The twelve (12) outlets in the new building. How many separate 20A circuits supplying them?

RESPONSE 8: Outlets located on the same wall may be tied to the same circuit, however it is the Contractor's responsibility to ensure that the number of circuits and amount of outlets tied to them comply with the National Electrical Code in service at the time of installation. This information must be provided during pre-approval of the outlet locations from the Technical Point of Contact.

ADDITIONAL SITE VISIT ATTENDEES

James Higgins - U.S. Army Corps of Engineers

Dave Ray - Icarus Construction Services, LLC

Lionell D Thompson Jr. - Icarus Construction Services, LLC

Karan Amin - Essex Building Group Inc

Mike Harriman - Harrco Industries LLC

Adan Giverson - Millennium Builders, Inc.

Ben Misterra - Rothwell Construction LLC

SITE VISIT ATTENDEES

James Higgins - U.S. Army Corps of Engineers

Stan Carter - R. Zoppo Corp.

Gary Emond - Kelly Construction Services Inc.

Lamont Davis - Anvil Steel Engineering Inc.

Carter Beliveau - Kelly Construction Services Inc.

Doug Cyr - Gale Construction Company

Nimesh Patel - Vedant Construction Inc.

James West - Bassett Contracting

W912WJ25QA0180003

IDCode: J
Page: 1
Pages: 3
AmendNo: 0003
EffDate: 07 MAY 2025
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ25QA018
SolDate: 22 APR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: AMENDMENT IS NECESSARY TO PROVIDE RESPONSES TO QUESTIONS FROM INDUSTRY AND PROVIDE AN ADDITIONAL SITE VISIT ATTENDEE LIST. QUESTIONS #7-#8 ARE APPLICABLE TO THIS AMENDMENT.

SOLICITATION CLOSING REMAINS MAY 13, 2025 AT 5:00 PM EASTERN.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 07 MAY 2025