This is a Performance Work Statement with accompanying maps and photos showing the areas requiring chemical vegetation control services at Franklin Falls Dam and Blackwater Dam in New Hampshire. The document includes four informational maps and one reference photo detailing specific treatment areas.
Map 1 shows the Franklin Falls Dam treatment areas marked in red for spraying. Map 2 provides access information for Franklin Falls Dam, with color-coded zones indicating vehicle access (purple and orange areas) and foot-access only areas (pink). A reference photo shows the concrete spillway at Franklin Falls Dam with adjacent vegetation. Maps 3 and 4 detail the treatment areas at Blackwater Dam and Little Hill Dike respectively, with red shaded areas indicating where vegetation control is required. The total treatment area across all locations is approximately 45.38 acres, encompassing rip-rap stone slopes, rock interfaces, roadway edges, concrete structures, inlets, dikes, and spillways. The contractor must provide their own means of access and egress, noting that some areas are only accessible by foot.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ25Q0010-0001.pdf | ||
| Solicitation W912WJ25Q0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHEMICAL VEGETATION CONTROL SERVICES
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS AND BLACKWATER DAMS
PERFORMANCE WORK STATEMENT
Informational Map
Informational Map 1: Franklin Falls Dam Treatment Area(s). All vegetation to be sprayed as described for ITEM NO. 1.
Informational Map 2: How to access areas to be treated at the Franklin Falls Dam Area.
PLEASE NOTE: The entire area is not drivable; this is means of access to the location. Some areas may still need to be walked after driving to them. The pink area is only accessible by foot. The
Contractor must provide their own means of access and egress to this area.
Informational Photo
Informational Photo 1: Reference View of Spillway at Franklin Falls Dam.
Informational Map 3: Blackwater Dam Treatment Area(s). All vegetation to be sprayed as described for ITEM NO. 2.
Informational Map 4: Little Hill Dike Treatment Area(s). All vegetation to be sprayed as described for