Pre-Solicitation Notice.pdf
PDF 78 KB Posted
- Attached to
- Maintenance Dredging of the Federal Navigation Project at Stony Creek Harbor in Branford, Connecticut.
- Solicitation number
- W912WJ25BA008
About this file
This pre-solicitation notice describes a small business set-aside Invitation for Bid (IFB) for maintenance dredging of the Stony Creek Federal Navigation Project in Branford, Connecticut, issued by the U.S. Army Corps of Engineers, New England District. The project involves dredging approximately 51,900 cubic yards of fine-grained/silt material from an 8.17-acre area, including a 6-foot deep entrance channel and maneuvering basin, with material to be transported and placed at the Central Long Island Disposal Site.
The procurement is categorized under NAICS code 237990 with a $37M size standard, and has an estimated construction cost between $1-5 million. Dredging operations are scheduled to begin October 1, 2025, with completion required by December 31, 2025. Contractors must achieve a minimum production rate of 22,600 cubic yards per 30 consecutive calendar days. The full solicitation will be available online through the System of Award Management (SAM) website in mid-May 2025, with questions to be directed to the Contract Specialist via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stony Creek Federal Navigation Project Dredging Pre-Solicitation Notice
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Stony Creek Federal Navigation Project, located in Branford, Connecticut.
This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about three months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.
The Stony Creek Harbor FNP consists of an entrance channel 6 feet deep, 100 feet wide from deep water in Long Island Sound to a point 800 feet north of the public wharf at Stony Creek, and a maneuvering basin 6 feet deep totaling 3.2 acres adjacent to the channel north of the wharf. The proposed work consists of dredging up to approximately 51,900 cubic yards (CY) of shoaled material over an 8.17-acre area. The material is fine-grained/silt and will be transported by scow and placed at Central Long Island Disposal Site (CLDS), approximately 11 miles away.
Dredging operations can start on October 1, 2025, for maintenance dredging using a mechanical dredge and placement in open water at CLDS. All work must be complete by December 31, 2025.
In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 22,600 CY per 30 consecutive calendar day period.
This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-May 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://beta.sam.gov/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at brian.t.mannion@usace.army.mil.