Amendment 0002.pdf
PDF 537 KB Posted
- Attached to
- Concrete Repairs, Blackwater Dam, Webster, NH
- Solicitation number
- W912WJ25B0003
About this file
This is Amendment 0002 to solicitation W912WJ25B0003 for Concrete Repairs at Blackwater Dam in Webster, NH, issued by the US Army Corps of Engineers New England District. The amendment provides responses to contractor questions and clarifies that the FRP liner in the conduits is not included in the scope of work - only the conduit bullnose requires repair per Section 03 01 00.
Key details clarified include: time period restrictions apply for the bullnose concrete repair work (referenced in Section 01 11 00); historical stream elevations between mid-June through September are 516 feet +/- 3 feet; a job site trailer is not required; no utilities or water access will be provided on site; a bid bond is required per clause 52.228-1; and scaffolding is allowed at the dam face but contractors must prevent damage to existing structures and properly fill/seal any concrete penetrations needed for securing scaffolding. The amendment has an effective date of November 29, 2024, and does not extend the original solicitation response deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0002 is necessary to provide responses to RFIs. All other aspects remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Nov-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ25B0003
X 9B. DATED (SEE ITEM 11)
12-Nov-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Nov-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ25B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
1. Is the FRP liner in the conduits included in this work?
Government Response: The FRP in the conduits is not included in the scope of work. Only the conduit bullnose is required to be repaired. Refer to Section 03 01 00.
2. Is there a time period restriction for the bullnose concrete repair work?
Government Response: Yes, please refer to Section 01 11 00, Summary of Work, 1.3 Time of Year Restrictions for Conduit Bullnose Work.
3. What is the anticipated depth of the water at the time of the required diversion?
Government Response: Refer to Spec Section 02 40 00, Para 2.2, third paragraph states that “Historical stream elevations between mid-June through the end of September is 516 feet +/- 3 feet. The stream will fluctuate at the time of construction as the weather will dictate and there is no absolute.”
4. Is a job site trailer a requirement?
Government Response: No, a job site trailer is not a requirement.
5. Will there be access to utilizes or water at the site?
Government Response: No. Please refer to Section 01 50 00, Temporary Construction Facilities and Controls, Sections 1.11.2 and 3.3.
6. Is a bid bond required?
Government Response: Yes, refer to 52.228-1.
7. Are there scaffolding restrictions at the face of the dam?
Government Response: Scaffolding is allowed; however, the Contractor must ensure to prevent any/all damage to existing structures at that location. The Contractor is required to fill and seal any penetration in the concrete necessary to secure scaffolding.
(End of Summary of Changes)