Amendment W912WJ24Q0101-0001.pdf
PDF 591 KB Posted
- Attached to
- Sluice Gate Operator and Stem Replacement, Control Installation, Mansfield Hollow Lake, Mansfield, CT
- Solicitation number
- W912WJ24Q0101
About this file
This document is an amendment to a solicitation for the Sluice Gate Operator and Stem Replacement, Control Installation project at Mansfield Hollow Lake in Mansfield, Connecticut. The amendment provides responses to industry questions, including details on the water flow, water management responsibilities, and lack of liquidated damages for this project. It also extends the closing date for offers from April 26, 2024 to April 29, 2024.
The original solicitation is for a small business set-aside contract to furnish equipment, materials, and labor to replace the sluice gate actuator, stem, stem guides/brackets, and nut(s), as well as install a new mechanical and electric sluice gate actuator and controls. The magnitude of construction is between $25,000 and $100,000, and the applicable NAICS code is 238290 with a $22 million small business size standard. All vendors must have an active SAM.gov registration to be considered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W912WJ24Q0101.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W13G86322860070001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to provide responses to questions from industry.
Closing is extended until April 29, 2024 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Apr-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0101
X 9B. DATED (SEE ITEM 11)
12-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Apr-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:
JENNIFER M SAMELA / ADDED BY UPASS
W912WJ24Q0101
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION
Question 1: Is the bottom full of water where the gate is?
Response 1: The average minimum flow is around 1 foot of water in the conduit or 40 cubic feet per second (CFS).
The flow can go lower during dry periods, and as high as 600 CFS during high water events.
Question 2: How will water flow be stopped when working on the gate? If we have to open the gate to clean it and work on it.
Response 2: Cribbing/ water flow control was outlined. Water will continue to flow through when wooden cribbing will be in place. Sluice gate will be supported in the open position with wooden cribbing, at approximately two feet (2’) open.
Question 3: How much water will flow through the gate when put on cribbing per the specs?
Response 3: Two feet of water and approximately 80 cubic feet per second.
Question 4: Who is responsible for managing this water?
Response 4: Project site itself is managed by USACE/ Mansfield Project staff. Within the scope of the contract, water management with the movement/ maintenance of gates falls on the contractor.
Question 5: Where can the water be pumped to out of the area we are working?
Response 5: Water will not likely have to be pumped out since conduit is angled downstream. If water is a concern, gate can be closed fully to work on/ in the sluice gate and the structure itself. This can be discussed with the TPOC during pre-construction conference.
Question 6: Are their liquidated damages on this project?
Response 6: There are no liquidated damages for this project.
Question 7: Is there any sort of outage window when the work has to be performed?
Response 7: At this point there is no scheduled outage during this period. Period of Performance will be 270 days from Notice to Proceed.
W912WJ24Q0101
Question 8: Will this project be tax exempt for permanent materials?
Response 8: Yes, the awarded Contractor may request a tax exempt certificate from the Government post-award.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 26-Apr-2024 05:00 PM to 29-Apr-2024 05:00 PM.
(End of Summary of Changes)