Sluice Gate Operator and Stem Replacement, Control Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation number
W912WJ24Q0101
Issued by

About this file

This document is a Request for Quotations (RFQ) for a construction contract to replace the sluice gate actuator, stem, stem guides/brackets and nut(s), and install a new mechanical and electric sluice gate actuator and controls on the existing sluice gate at Mansfield Hollow Dam Dike B in Mansfield, CT.

The work is set-aside for small businesses under NAICS code 238290, with a small business size standard of $22 million. The magnitude of the construction is between $25,000 and $100,000. Vendors must have an active registration in SAM.gov to be considered. Quotes are due by April 26, 2024. The period of performance is 270 days from the Notice to Proceed. Payment and performance bonds are required for contracts over $150,000 and $35,000, respectively. Prospective vendors are strongly encouraged to conduct a site visit prior to providing a quote. The government will award the contract based on price alone.

View the file

Other files

File Type Posted
Amendment W912WJ24Q0101-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANSFIELD HOLLOW LAKE

JOHN RENZONI

141 MANSFIELD HOLLOW RD

MANSFIELD CENTER CT 06250-9802

TEL: 978-318-8355 FAX:

W13G86322860070001

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ24Q0101 12-Apr-2024 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

26-Apr-2024(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8324JENNIFER M SAMELA

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ24Q0101

Section B - Supplies or Services and Prices

INSTRUCTIONS TO VENDORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or

JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT

WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE ATTENTION OF

JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

**QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT

JENNIFER.M.SAMELA@USACE.ARMY.MIL.

NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 3:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company names:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration

(CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business Unique Entity Identifier (UEI): _______________________________

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE

ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job MHD Replace Sluice Gate Actuator/Stem

FFP

Contractor shall furnish all equipment, materials, and labor to (a) replace sluice gate actuator, stem, stem guides/brackets and nut(s), and (b) install mechanical and electric sluice gate actuator and controls, on existing sluice gate at Dike B, Mansfield Hollow Dam, Mansfield, CT in accordance with the Statement of Work.

FOB: Destination

PURCHASE REQUEST NUMBER: W13G86322860070001

PSC CD: Y1QA

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

SLUICE GATE ACTUATOR & STEM REPLACEMENT,

AND CONTROL INSTALLATION

U.S. ARMY CORPS OF ENGINEERS

MANSFIELD HOLLOW DAM; DIKE B

MANSFIELD CENTER, CT

STATEMENT OF WORK

I. General:

1. Scope Contractor will furnish all equipment, materials, and labor to (a) replace sluice gate actuator, stem, stem guides/brackets and nut(s), and (b) install mechanical and electric sluice gate actuator and controls, on existing sluice gate at Mansfield Hollow Dam Dike B.

2. Location Mansfield Hollow Dam Dike B is located behind residence at 131 Warrenville Rd (Route 89), Mansfield Center, CT 06250

See below for photographs and maps which contain further location information.

The Technical Point of Contact for this project is Park Ranger John Renzoni; 860-923- 2982 (office) or email john.v.renzoni@usace.army.mil

3. Site Visit Site visits are strongly recommended to gauge the full scope of work and provide an accurate quote. No extra payment will be considered for perceived additional work caused by unfamiliarity with the site conditions and requirements. Contact the Technical Point of Contact, Park Ranger John Renzoni; john.v.renzoni@usace.army.mil / 860-923- 2982 to arrange a site visit.

Note: Contact the Technical Point of Contact to arrange a site visit as vehicle access is restricted by a gate; however, location can be reached on foot with a short walk from gate.

4. Schedule The period of performance shall be 270 days from Notice to Proceed. Work shall be performed Monday through Friday between the hours of 7:00 AM and 3:30 PM unless otherwise approved by the Technical Point of Contact. Any proposed changes to an approved schedule must be submitted to the Technical Point of Contact in writing and are not finalized until approved. No work shall be done on weekends or Government holidays.

All pre-construction submittals shall be submitted within 30 days of Notice to Proceed.

The Government reserves up to 21 days for review and acceptance on each submittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government’s response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-construction submittals.

5. Safety

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1- 1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 2, SSHO. A Level 2 SSHO is a designated employee with collateral duty safety and occupational health (SOH) responsibilities that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.b.

Level 2 SSHOs must possess:

OSHA 30-hour general industry or construction safety training (or equivalent).

24 hours of documented SOH-related competency training.

3 years of related, cumulative safety experience within the last ten years.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the prime contractor’s SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employes work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Fo rm_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.

a.

6. Electrical

a. General: All electrical work shall comply All electrical work shall comply with EM 385-1-1 (Sections 11 & 12) and applicable National Electrical Safety Code (NESC), National Electric Code (NEC), National Fire Protection Association (NFPA), OSHA and USACE regulations. In the circumstance there is a discrepancy between the codes and regulations listed above, the most stringent shall apply.

b. Qualified Person: Electrical work shall be performed by a Qualified Person (QP) with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman Electrician may hold, depending on the work being performed, and should be identified in the appropriate AHA. Journeyman/Apprentice ratio shall be in accordance with State, Local and Federal requirements applicable to where the work is being performed.

c. All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used. Appropriate personal protective equipment will be worn and/or utilized at all times, and adequately match the level of associated risk.

d. Emergency Procedures and Training. Employees exposed to shock hazard and those employees responsible for taking action in case of emergency shall be trained in accordance with EM 385-1-1 Section 03.A, OSHA 29 CFR 1910.151, and NEPA 70E 110.2c. The training shall include methods to release of victims from contact with exposed energized electrical conductors or circuit parts. Employees shall be regularly instructed in methods of first aid and emergency procedures, such as approved methods of resuscitation.

e. All equipment and circuits to be worked on shall be de-energized before work is started. Personnel shall be protected by a Hazardous Energy Control Program (HECP) and procedures in accordance with EM 385-1-1, Section 12. Positive means shall be provided for rendering controls or devices inoperable while repairs or adjustments are being made to the machines they control.

f. If work MUST be performed on an energized system, then the employer must first demonstrate that de-energizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations (i.e., testing, troubleshooting, etc.).

i. Energized work may never be performed without prior authorization. Once it has been determined that equipment must be worked on in an energized condition, an energized work permit shall be submitted to the Technical Point of Contact for acceptance. > See NFPA 70E and EM 385-1-1, Section 11.A.02.c for permit requirements.

7. Confined Space

a. General: The requirements of this section are applicable to contractors when employees are working in a confined space. Contractors are responsible for establishing, implementing, and managing a confined space program in accordance with EM 385-1-1; Section 34, 29 CFR 1910.146, and ANSI Z117.1.

b. Submittals: An activity/site-specific Confined Space Entry Plan is required to be submitted and accepted by the Technical Point of Contact (Technical Point of Contact) prior to any work being completed in a confined space. The plan shall contain and adequately address the Confined Space Program elements of 29 CFR

1910.146 and those defined in EM 385-1-1 Section 34.A.06-07.

c. Confined Space Competent Person (CSCP): A person with thorough knowledge of

OSHA’s Confined Space Standard, 29 CFR 1910.146, designated in writing by the employer to be responsible for the immediate supervision, implementation and monitoring of the confined space program, who through training, knowledge and experience in confined space entry is capable of identifying, evaluating and addressing existing and potential confined space hazards and, who has the authority to take prompt corrective measures with regard to such hazards. The CSCP shall be onsite at all times while work in a confined space is being performed.

NOTE: All USACE confined spaces will be considered Permit Required Confined Spaces (PRCS) until the CSCP has evaluated the activities and associated hazards.

After an adequate analysis, to include air monitoring, the space may be reclassified as a Non-permit Required Confined Space (NPRCS).

d. PRCS Permit: The CSCP shall complete and sign a PRCS permit (see EM 385-1-1;

Form 34-1 for non-mandatory example) and shall be responsible for enforcing the use of permits for entry into all PRCSs at the facility/site.

e. Rescue Team: Site specific rescue procedures shall be established and documented in the Confined Space Entry Plan. The CSCP shall coordinate with local emergency responders to determine if they are capable of a timely (5 minutes) rescue from the specific CS. If the local emergency responders do not have the appropriate rescue capability, the rescue capability should be developed on-site.

f. Employee Training: All employees entering PRCS or NPRCS, authorized attendants, supervisors and managers, and workers within visual contact of the CS shall be trained to understand the requirements of the facility/site-specific CSE Program and procedures and emergency retrieval procedures.

i. Initial CS training. All entrants, authorized attendants, and supervisor or managers shall receive an initial CS training course that includes hands-on practical exercise with all the equipment; rescue exercise; and completing the CS permit. The training shall include, as a minimum: the roles and responsibilities in conducting an entry; specialized training on the use, calibration, and maintenance of monitoring, communications, and retrieval equipment; the hazards of the entry and the control of the hazards of the entry.

Training shall be documented and included in the within the Confined Space Entry Plan.

ii. Before each activity requiring entry into a CS, the entrant, authorized attendants, supervisor/managers, and workers in close proximity, shall review the site-specific entry procedures, the use of the air monitoring, personal protective equipment, and retrieval equipment. Emergency responders should be invited to the training review.

g. Site-Specific Hazards:

i. *PM must provide a list of any known hazards and controls in the confined space*

8. Fall Protection

a. General: The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1- 1, Section 21.

b. Submittals: A site-specific Fall Protection and Prevention Plan is required to be submitted and approved by the Technical Point of Contact prior to any work being completed at heights. USACE can provide a non-mandatory, fillable template plan.

However, the contractor is permitted to submit their own plan, at a minimum it must address the items listed in EM 385-1-1, Section 21.D.01:

i. Duties and responsibilities. Identify CPs and QPs and their responsibilities and qualifications;

ii. Description of the project or task performed;

iii. Training requirements to include safe use of fall protection equipment;

iv. Anticipated hazards and fall hazard prevention and control;

v. Location of anticipated anchorages that will be installed during the project;

vi. Rescue plan and procedures;

vii. Design of anchorages/fall arrest and horizontal lifeline systems:

viii. Inspection, maintenance, and storage of fall protection equipment;

ix. Incident investigation procedures;

x. Evaluation of program effectiveness;

xi. Inspection and oversight methods employed.

c. A Competent Person (CP) shall be onsite at all times while work at heights is being performed. The CP must be designated in writing and be trained in accordance with EM 385-1-1, Section 21.C.04. This includes a minimum of 24-hour CP in fall protection training made up of classroom and practical hands-on components.

NOTE: CPs may only approve non-certified anchorages that are capable of holding 5000 lbs. All other anchorages and horizontal lifelines must be certified by a QP or engineer with related experience.

d. Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems. A PFAS consist of a full body harness, connecting means, and an anchorage system.

9. Preconstruction Conference Prior to the start of any site work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act for the Contractor. This conference will be held at the time and location agreeable to the government and contractor. No site work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Preconstruction Conference:

•Authority of the Technical Point of Contact •Contractor’s Safety Program (including sub-contractors) •Accident Prevention Plan and Activity Hazard Analysis •Confined Space Entry Plan •Weekly Safety Meetings (Documented on NED Form 251) •Accident Reporting (ENG Form 3394) •Safety Data Sheet (SDS) requirements •Correspondence, Communication and Administrative Procedures •Invoice and payment

10. Permits

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

11. Security The contractor will comply with all established security policies on project grounds. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.

12. Contractor Conduct

Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.

13. Flooding Mansfield Hollow Dam is primarily a Flood Risk Management Project. Occasional retention of floodwaters may inundate portions of the dam property, dike system, access to the sluice gate or access roads in the areas covered by this contract. The Technical Point of Contact will notify the Contractor as areas are closed because of floodwaters.

When flooding ends and waters recede, the Technical Point of Contact will notify the Contractor as areas reopen and services may resume.

Note: The average minimum flow is around 1 foot of water in the conduit or 40 cubic feet per second (CFS). The flow can go lower during dry periods, and as high as 600 CFS during high water events.

14. Payment

After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the contractor may request progress payment.

All invoices may be mailed to:

U.S. Army Corps of Engineers West Thompson Lake 449 Reardon Rd.

North Grosvenordale, CT 06255 Or sent via email to john.v.renzoni@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary

Contractor will furnish all equipment, materials, and labor to (a) replace sluice gate actuator, stem, stem guides/brackets and nut(s), and (b) install mechanical and electric sluice gate actuator and control, on existing sluice gate at Mansfield Hollow Dam Dike B.

2. Submittals Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 14 days of the Government’s response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

Pre-Construction Submittals: Submitted within 30 days of notice to proceed. Submittals must be accepted prior to the commencement of any field work activities.

a. Accident Prevention Plan

b. Activity Hazard Analysis

c. Confined Space Entry Plan

d. Fall Protection and Prevention Plan

e. Manufacturer Data sheets, specifications, and/or cut sheets for any products used

f. Warranty paperwork, including type, etc.

g. Current Valid State Electricians License

h. ENG Form 6282 (Site Safety and Health Officer Designation Letter)

i. OSHA 30-hour general industry or construction safety training (or equivalent).

j. 24 hours of documented SOH-related competency training.

3. Clean Up and Waste Disposal

The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the Government.

Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.

4. Environmental Protection Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned daily when working onsite.

Water, air, and land resources shall not be adversely impacted during the work. The contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.

5. Sustainability & Environmentally Preferred Products

Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels.

Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

Furthermore, the contractor should also meet the BioPreferred Program requirements.

The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio based content level requirements.

6. Personal Protective Equipment It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

7. Government Resources

The government may supply any electricity necessary for the operation of the unit post installation, but no existing electricity is available at the worksite. The contractor shall have to provide their own electricity for installation. The contractor shall supply his own means of communication (telephone) as well. There is not a restroom available at the contract site, and there is no access to potable water at the contract site. The contractor would have to provide these resources or have an acceptable alternative plan for these resources.

8. Damage to Government and Private Property The contractor shall be responsible for restoring all Government facilities or structures damaged because of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person because of the contractor’s operation. The contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

9. Contractor’s Personnel –

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note: At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor’s employees strictly comply with Code of Federal Regulations Title 36, Chapter III, Part 327, and all federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor’s Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

10. Omissions

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

11. Quality Assurance The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

12. Other Contracts The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

13. Receiving and Storing Materials The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods.

Government employees will not receive materials or supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.

14. Existing Conditions Mansfield Hollow Dike B is a remote site, therefore has no utilities or restroom facilities.

The crest of Dike B is paved with asphalt and is approximately 11’ wide with steel cable guide rails on both sides.

Access to site is restricted to vehicles by a locked gate. Contractor will be given a combination for lock to access site as needed once contract is awarded.

Mansfield Hollow Dam Dike B utilizes a single Chapman Valve Manufacturing Company 48” x 60” Table 4 Sluice Gate, which was installed in 1949 and is manually operated by hand crank or by ¾” drill.

The actuators, floor stand, stem, stem guides/brackets, stem cover, and stem nut(s) shall be replaced. The sluice gate shall be re-aligned, cleaned, and lubricated. The sluice gate can be access by a series of ladders inside the conduit. (see separate attachment for informational photos and as-built plans).

Maintenance/ equipment hatch opening is approximately 75” X 27”. Ladder access hatch opening is approximately 33” X 27”. Inside dimensions of the concrete structure is approximately 92” X 72” with a working platform and railing of approximately 36” X

72”. Inside of operator structure has 3 separate working platforms, all of which are the same size. Access ladder to lower levels is approximately 24” X 22”.

Existing gate stem is approximately 42’ 5 7/8” in overall length and is 3” in diameter.

Gate stem is broken up into three sections with the top section measuring 9’ 6”and the keyway section is 9’in length. The middle section measures 20’ and the last section connecting to the sluice gate measures 11’ 9 1/8”. 2 couplings connect these three stem sections together and again the bottom section connects to the sluice gate itself. Three (3) brackets/stem guides are in place to allow for the gate to travel straight up and down.

These dimensions and more are broken down in the attached informational photos and as-built plans.

This is a permit required confined space.

Part 2 Products:

1. Materials and Equipment – General

a. The intent of this material section is not to specify every product to be used in the execution of the work. Rather, to define the expected standards to be followed and the quality of the product to be used.

b. All construction material shall be new, un-used and be first quality material or products. In addition, construction material shall be produced domestically or manufactured domestically in accordance with the Buy American Act.

c. Electrical and mechanical components will meet or exceed national electrical codes and specifications as listed. All electrical components will operate on portable generator power until commercial power is installed on site (at a later date, outside of this contract).

2. Sluice Gate Actuator

a. Shall be compatible with existing sluice gate mechanicals.

b. Shall be operated on portable generator power until commercial power is installed on site (at a later date, outside of this contract).

c. Shall operate one existing Chapman Valve Manufacturing Company 48” x 60” Table

4 Sluice Gate.

d. Shall be of the mechanical electrical type (no electronic only system).

e. Shall have one independent electrical main disconnect and one circuit breaker.

f. Interior and exterior components and enclosures shall be rated for a corrosive and wet environment.

g. Shall operate at a minimum rate of six inches (6”) per minute in both directions (up and down).

h. Shall have operating functions and features on actuator, as listed below in “Sluice

Gate Control System” section.

i. Shall operate in temperature range of minus twenty (-20) and one-hundred fifty (150) degrees Fahrenheit.

j. Shall have low maintenance requirements.

k. Shall have heaters to prevent moisture buildup in outdoor housing when commercial power is installed (at a later date, outside of this contract).

l. Shall have internal, gear type, limit switches set to automatically stop at fully open and fully closed, with overload protection.

m. Shall include a clear, non-yellowing stem cover, sealed from the elements, with a fully open and fully closed indicator marked on the stem and/or cover.

n. Shall have a coating suitable for a 500-hour salt spray standard.

o. Shall have manufacturer’s warranty.

3. Sluice Gate Control System

a. Shall consist of two operating methods, mechanical and electrical

b. Shall meet or exceed manufacture of actuator specifications

i. Sluice Gate Control: Mechanical

1) Operation will be by hand wheel being attached to the actuator and manually rotating the wheel to operate the gate. Wheel will be removable to prevent unauthorized use. Two (2) wheels will be provided.

a) Shall have a manual, mechanical, lockable (by padlock), declutch system to disconnect the electric motor and allow hand wheel operation.

b) Mechanical wheel shall be mounted in a vertical position, be at a reasonable height, and accessible for single operator use.

ii. Sluice Gate Control: Electrical

1) Operation will consist of two electrical systems: Remote and Local.

System shall be operable by portable generator until commercial power is installed (at a later date, outside of this contract).

a) Remote:

i) Will be installed in line with top (crest) of Dike B allowing operator to stand on the top stair platform for operation. Final location to be determined by contractor and Technical Point of Contact.

ii) Shall be secured in lockable cover to prevent unauthorized use.

iii) Contactors, lights, enclosures shall be rated for a corrosive and wet environment.

iv) Shall have three momentary contact pushbuttons for “OPEN” /

“STOP” / “CLOSE” gate functions.

v) Shall have colored indicator lights for “OPEN” (GREEN) /

“CLOSE” (RED) / “FAULT” (YELLOW) functions.

b) Local:

i) Shall be integrated in/on actuator.

ii) Shall be secured in lockable cover to prevent unauthorized use.

iii) Contactors, lights, enclosures shall be rated for a corrosive and wet environment.

iv) Shall have three momentary contact pushbuttons for “OPEN” / “STOP” / “CLOSE” gate functions.

v) Shall have a three-way, lockable switch; able to lock in LOCAL, OFF, or REMOTE operation.

vi) Shall have colored indicator lights for “OPEN” (GREEN) / “CLOSE” (RED) / “FAULT” (YELLOW) functions.

iii. Electrical and control conduit, wire, fittings, fasteners, and support structure:

1) New mounting structure and 120/240V, 1Ø, 3W, 16 Pole minimum, electrical panel with main circuit breaker will be installed on the top (crest) of the dike near the metal staircase on the roads edge (see separate attachment for informational photo with proposed location and layout, final location will be determined by TPOC). Panelboard shall be provided in a NEMA 3R enclosure.

2) A new NEMA L14-30R (30-Amp, 125/250 Volt) twist-lock portable generator inlet will power the subpanel and operator. Inlet will be provided in a weatherproof, pad-lockable cover. The panelboard shall be equipped with an interlock, or a manual transfer switch shall be provided such that the portable generator source and utility source cannot be closed on simultaneously.

3) Wires will be in rigid galvanized conduit, which will be anchored and ran approximately 40’ along the outside of stair runners down to the operator platform and into a weatherproof junction box.

4) Rigid galvanized conduit shall be installed from weatherproof junction box to new actuator.

5) Power will be sufficient, with voltage drop considerations, to operate the new electric sluice gate equipment.

6) Electrical work, fittings, conduit, wires, and panels shall comply with National Electrical Code (NEC).

7) All enclosures shall be properly marked to comply with NEC standards

8) All enclosures shall be lockable with a government supplied padlock

9) One additional weatherproof NEMA 5-20R, 125-Volt, 20-Amp, GFCI type duplex receptacle, with in-use, weatherproof, pad-lockable cover will be installed.

10) Wire, conduit, cable, enclosures, and all electrical fittings shall be weatherproof and rust resistant.

11) Electric and staircase will also be bonded/grounded with two independent grounding locations opposite of each other.

iv. Electrical Power Supply

1) Portable generator (power supply provided by government after installation)

2) Operator will initially be set up to run off a NEMA L14-30R portable generator inlet as noted above. This will be discussed between contractor and the Technical Point of Contact

4. Sluice Gate Stem, stem guides/brackets and Nut(s) Replacement

a. The products provided shall meet or exceed the original manufacture design. The manufacturing requirements are noted in the as-built drawings (attached).

b. Stem shall be sized appropriately to operate a 48” x 60” sluice gate.

c. Gate stem guides/brackets shall be sized correctly to new gate stem.

5. Sluice Gate Floor Stand

a. Shall be installed and aligned to industry standards.

b. Stem guides/brackets shall be aligned to industry standards.

c. Floor stand shall be anchored and grouted to concrete operator pad.

d. Refer to as-built drawings (attached) for more information.

Part III. Execution:

1. Safety Equipment: It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment (Hardhats, Hand Protection, Eye Protection, Fall Protection etc.) when and where necessary.

2. Contractor Qualifications:

a. All work shall be performed by Qualified Personnel with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman Professional may hold, depending on work being performed.

3. Electric Sluice Gate Actuator and Control Installation shall occur in accordance with the scope of work and local and federal laws and the National Electric Code.

a. Work Area will be restricted to contractors and USACE Employees

b. Before sluice gate is taken out of service, the schedule and work must be approved by the Technical Point of Contact.

c. Sluice gate will be supported in the open position with wooden cribbing, at approximately two feet (2’) open.

d. Install sluice gate actuator, electrical mounting structure, electrical panel, control wires and local control unit. Conduit will be 2”. in size and be placed on the side of the stair runners down to operator.

e. Install weatherproof junction box on side of concrete operator platform and run 1” galvanized conduit from weatherproof junction box to new sluice gate actuator.

f. Inspect, clean, and lubricate all mechanicals. This includes sluice gate stem and sluice gate guides and channels.

g. Install remote control system buttons at electrical panel on top stair platform in line with top (crest) of Dike B.

h. Remove sluice gate temporary supporting wooden cribbing.

i. Set and adjust electromechanical sluice gate actuator stopping limits at fully open and fully closed positions.

j. Test sluice gate actuator using portable generator, with Technical Point of Contact.

i. Test Mechanically:

1) Operate sluice gate actuator system using hand wheel, six inches (6”) of movement in each direction (up and down).

ii. Test Electrically:

1) Operate sluice gate actuator manually to raise sluice gate up to a height of four inches (4”) before testing electrically to ensure correct wiring.

2) Operate sluice gate actuator control system type (Remote and Local) in each direction (up and down) three full cycles.

3) Sluice gate actuator shall operate electrically at the specified speed and stop independently at specified increments of fully open and fully closed.

4) Make necessary adjustments to system.

k. Contractor will be responsible for disposal of all items removed in this contract.

l. Contractor is responsible for site cleanup.

ATTACHMENTS

PLEASE REFER TO THE ATTACHMENTS INCLUDED WITH THIS SOLICITATION FOR ADDITIONAL

INFORMATION.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 270 dys. ANP 1 MANSFIELD HOLLOW LAKE

JOHN RENZONI

141 MANSFIELD HOLLOW RD

MANSFIELD CENTER CT 06250-9802

978-318-8355 FOB: Destination

961102

Access Driveway

Informational Photos & Plans

Mansfield Hollow Dam, Dike B Location and Access Driveway Location (Overhead)

Mansfield Hollow Dam, Dike B Top View

Mansfield Hollow Dam, Dike B Gate Operator Platform

Mansfield Hollow Dam, Dike B Gate Operator (Front View)

Mansfield Hollow Dam, Dike B Gate Operator (Side View)

Mansfield Hollow Dam, Dike B Operator (view from top of dike w/ 40” wide stairs)

Mansfield Hollow Dam, Dike B proposed electrical layout and location (final location determined by TPOC)

Mansfield Hollow Dam; Dike B Sluice Gate Operator Close Up Manual Hand Crank Assy.

Mansfield Hollow Dam; Dike B Sluice Gate Operator Closeup Nomenclature

Mansfield Hollow Dam; Dike B Sluice Gate Operator Closeup Nomenclature

Mansfield Hollow Dam Dike B – Gate Stem, Guides and Couplers

Mansfield Hollow Dam Dike B – Gate Stem, Guides and Couplers

Mansfield Hollow Dam Dike B – Gate Stem

Mansfield Hollow Dam Dike B – Gate Stem & Sluice Gate

Mansfield Hollow Dam Dike B – Gate Stem and Sluice Gate Connection

Mansfield Hollow Dam Dike B – Gate Stem & Sluice Gate Connection

Mansfield Hollow Dam, Dike B: As-Built Drawings for Reference

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements.