Sheet C-5.pdf
PDF 3 MB Posted
- Attached to
- Tree Clearing, Ely Mine, Vershire, VT
- Solicitation number
- W912WJ24Q0035
About this file
This document contains a federal contract solicitation and related engineering plans. The solicitation is for tree clearing services encompassing 21.1 acres at the Ely Copper Mine Superfund site in Vershire, Vermont. The work includes furnishing all labor, materials, and equipment to clear trees from the specified area. This is a small business set-aside procurement with a NAICS code of 561730 and size standard of $9.5 million. Vendors must have an active SAM registration to be considered. The engineering plans show the remedial design for OU1 of the Ely Copper Mine Superfund site, including waste and source areas, staging locations, and details for replacing existing culverts. The Army Corps of Engineers District in New England is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ24Q0035-0003.pdf | ||
| Solocator-2024-01-12 11-10-23 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-00-04 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-18-10 (1).jpg | JPG image | |
| Sheet C-1_Revised 17 Jan 2024.pdf | ||
| Solocator-2024-01-12 10-06-13 (1).jpg | JPG image | |
| Map_Historic Features.pdf | ||
| Solocator-2024-01-12 10-04-58 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-08-07 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-17-51 (1).jpg | JPG image | |
| Amendment W912WJ24Q0035-0002.pdf | ||
| Solocator-2024-01-12 11-08-59 (1).jpg | JPG image | |
| Solocator-2024-01-12 11-08-41 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-05-03 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-06-10 (1).jpg | JPG image | |
| Solocator-2024-01-12 10-10-13 (1).jpg | JPG image | |
| Map_Wells.pdf | ||
| Sheet C-1 Winter Tree Clearing Plan_REVISED.pdf | ||
| Amendment W912WJ24Q0035-0001.pdf | ||
| Attachments.pdf | ||
| Solicitation W912WJ24Q0035.pdf | ||
| Sheet C-1 Winter Tree Clearing Plan.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MW-2
MW-1
MW-3
MW-4
MW-6
MW-5
SO
UT
H
VE
RS
HI
RE
R
O
AD
SOUTH VERSHIRE ROAD
SCHOOLHOUSE BROOK
(P
AV
ED
80069-OVERVIEW-PLANS.dwg
REMEDIAL ACTION
OVERVIEW PLAN
00 200' 400'
GRAPHIC SCALE
SHEET
SHEET TITLE
CAD DRAWING FILE:
CHECKED BY:
80069-OVERVIEW-PLANS.dwg
DRAWN BY:
NOBIS PROJECT NO.
DATE:
REVISIONS
NO. DATE DESCRIPTION
ELY COPPER MINE
SUPERFUND SITE
OU1 REMEDIAL DESIGN
SOUTH VERSHIRE ROAD
VERSHIRE, VERMONT
FINAL DESIGN
(100%)
JANUARY 2020
80069.11
SM
AB
Nobis Group® 18 Chenell Drive
Concord, NH 03301 T(603) 224-4182 www.nobis-group.com
C-5
GENERAL LEGEND
STAGING AREA
SETTLING BASIN
VALLEY CELL CONTAINMENT AREA
WASTE MANAGEMENT AREA
LIMIT OF WASTE/COVER SYSTEM
LIMIT OF CLEARING
SOURCE AREA LEGEND
UPPER WASTE AREA (UWA)
LOWER WASTE AREA (UWA)
ORE ROAST BEDS (ORB)
DEVELOPMENT ROCK PILE
TAILING AREAS (TA)
PONDS 4 & 5 AREA
ELY BROOK UPPER REACH (EB-UR)
ELY BROOK MIDDLE REACH (EB-MR)
ELY BROOK LOWER REACH (EB-LR)
ELY BROOK TRIBUTARY-1 (EBT-1)
ELY BROOK TRIBUTARY-3 (EBT-3)
UNDERGROUND WORKINGS (UGWs)
GREEN CROW BORROW
SOURCE AREA
ELY BROOK / ELY BROOK TRIBUTARY
VERMONT ASSOCIATION OF SNOW TRAVELERS (VAST) TRAIL
NOTES:
1. VAST TRAIL MUST REMAIN OPERATIONAL DURING WINTER MONTHS WHEN
CONSTRUCTION IS NOT ON-GOING.
2. REFER TO SHEET G-1 FOR GENERAL NOTES AND LEGEND.
3. REPLACEMENT OF EXISTING AND FORMER STONE CULVERTS 1-5 SHALL BE
PERFORMED USING 24" DIAMETER TRIPLE WALL HDPE DRAINAGE PIPE
INSTALLED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. MINIMUM
COVER SHALL BE 18" OR AS SPECIFIED BY MANUFACTURER, WHICHEVER IS
GREATER.
APRIL 2023
AB
BK
Greatwoods
Dwight Hills Forestry
E6COMJMS
Highlight
E6COMJMS
Highlight
File details come from the government source that posted it. Updated .