Revised Specs.pdf

PDF 93 KB Posted

Attached to
Maintenance Dredging Narraguagus River, Milbridge, Maine
Solicitation number
W912WJ24B0015
Issued by

About this file

This document is an amendment to a federal solicitation for maintenance dredging of the Narraguagus River Federal Navigation Project in Milbridge, Maine. The proposed work involves dredging approximately 150,000 cubic yards of predominantly fine-grained material from shoaled areas of the 11-foot, 9-foot, and 6-foot channels and anchorages, and disposing of the material at the designated Douglas Island Disposal Site located 2.5 miles away. The work must be performed using a mechanical dredge between November 1, 2024 and May 15, 2025. The estimated construction cost is $1 million to $5 million. The solicitation is an Unrestricted Invitation for Bid under NAICS code 237990 with a $37 million size standard. All responsible sources may submit bids to be considered by the U.S. Army Corps of Engineers, New England District.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
W912WJ24B0015 Amendment 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mai nt enance Dr edgi ng, Nar r aguagus Ri ver , Mi l br i dge, Mai ne Amendment 0001

DOCUMENT 00 00 01

AMENDMENT 0001 OF SOLI CI TATI ON

PART 1 GENERAL

1. 1 CHANGES TO SPECI FI CATI ONS

1. 1. 1 Revi sed Sect i ons

The speci f i cat i on sect i ons l i s t ed bel ow ar e del et ed and ar e r epl aced wi t h r evi sed sect i ons of t he same sect i on number as i ndi cat ed. Changes i n t he t ext ar e i ndi cat ed by addi t i ons and del et i ons. Added t ext i s i dent i f i ed by gr een under scor i ng and del et ed t ext i s i dent i f i ed by r ed over st r i ke.

Copi es of t he r evi sed sect i ons ar e at t ached.

Sect i on 01 54 00 DREDGI NG PLANT AND EQUI PMENT Sect i on 35 20 23 MECHANI CAL DREDGI NG

- - End of Document - -

DOCUMENT 00 00 01 Page 1

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 54 50

DREDGI NG PLANT AND EQUI PMENT

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PLANT AND EQUI PMENT

1. 3. 1 Locat i on Dat a Col l ect i on f or Dr edge Bucket

1. 3. 2 Suf f i c i ent Capaci t y

1. 3. 3 Reduct i on i n Capaci t y

1. 3. 4 I nspect i ons and Cer t i f i cat i ons

1. 4 LI CENSE REQUI REMENTS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 54 50 Page 1

SECTI ON 01 54 50

DREDGI NG PLANT AND EQUI PMENT

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2024) Saf et y and Occupat i onal Heal t h ( SOH) Requi r ement s

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

46 CFR Subchapt er M Towi ng Vessel s

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pl ant and Equi pment

Submi t a schedul e of t he pl ant and equi pment t he Cont r act or wi l l empl oy i n t he per f or mance of t he wor k of t hi s cont r act . Al so, submi t copi es of al l appl i cabl e i nspect i ons and cer t i f i cat i ons f or al l f l oat i ng pl ant and equi pment .

1. 3 PLANT AND EQUI PMENT

1. 3. 1 Locat i on Dat a Col l ect i on f or Dr edge Bucket

The dr edge pl ant must be equi pped t o r ecor d r eal t i me l ocat i on dat a f or t he posi t i on of t he bucket , t o i ncl ude hor i zont al and ver t i cal posi t i oni ng ( xyz dat a) . Thi s dat a must be avai l abl e on a cont i nuous basi s.

1. 3. 2 Suf f i c i ent Capaci t y

The Cont r act or shal l keep on t he j ob suf f i c i ent pl ant and equi pment t o meet t he r equi r ement s of t he wor k. The pl ant and equi pment shal l be i n sat i sf act or y oper at i ng condi t i on and be capabl e of saf el y and ef f i c i ent l y per f or mi ng t he wor k. The pl ant and equi pment shal l be subj ect t o i nspect i on by t he Cont r act i ng Of f i cer and/ or hi s r epr esent at i ves at al l t i mes.

SECTI ON 01 54 50 Page 2

1. 3. 3 Reduct i on i n Capaci t y

No r educt i on i n t he capaci t y of t he pl ant and equi pment empl oyed on t he wor k shal l be made except by wr i t t en per mi ssi on of t he Cont r act i ng Of f i cer . The measur e of t he capaci t y of t he pl ant and equi pment shal l be i t s act ual per f or mance on t he wor k cover ed by t hi s cont r act .

1. 3. 4 I nspect i ons and Cer t i f i cat i ons

Pr i or t o commencement of wor k at t he s i t e, t he Cont r act or shal l make avai l abl e t o t he Cont r act i ng Of f i cer Repr esent at i ve f or r evi ew, copi es of al l appl i cabl e i nspect i ons and cer t i f i cat i ons of f l oat i ng pl ant and equi pment as r equi r ed by Feder al , St at e and l ocal l aws and r egul at i ons.

See al so EM 385- 1- 1, Sect i ons 16, 18, 19, and 20. Such i nspect i ons and cer t i f i cat i ons shal l be cur r ent and mai nt ai ned i n f or ce f or t he dur at i on of t hi s cont r act . Each i t em of f l oat i ng pl ant and equi pment shal l have on boar d a wast e oi l management pl an whi ch det ai l s t he i nt ended di sposal met hod f or wast e oi l .

Each vessel exceedi ng t went y- si x f eet i n l engt h, excl udi ng sheer , whi ch i s used f or pushi ng, haul i ng al ongsi de, or any ot her met hod of t owi ng shal l adher e t o t he r equi r ement s set f or t h i n 46 CFR Subchapt er M.

The pl ant and equi pment shal l be subj ect t o t he i nspect i on of t he Cont r act i ng Of f i cer and/ or t he COR at al l t i mes. The r esponsi bi l i t y f or act ual super vi s i on and di r ect i on of dr edgi ng oper at i ons i ncl udi ng t he saf e and ef f i c i ent oper at i on of dr edge pl ant and equi pment l i es wi t h t he Cont r act or .

1. 4 LI CENSE REQUI REMENTS

Each vessel exceedi ng t went y- si x f eet i n l engt h, excl udi ng sheer , whi ch i s used f or pushi ng, haul i ng al ongsi de, or any ot her met hod of t owi ng, and not r equi r ed by l aw t o have a val i d Cer t i f i cat e of I nspect i on by t he U. S.

Coast Guar d, shal l be under t he act ual di r ect i on and cont r ol of a per son l i censed f or t owi ng i n t he geogr aphi c ar ea of t he wor k by t he U. S. Coast Guar d. Li censed per sons shal l not per f or m command or ot her dut i es i n excess of t wel ve hour s i n any consecut i ve t went y- f our hour per i od except i n an emer gency.

1. 5 AUTOMATI C I DENTI FI CATI ON SYSTEM REQUI REMENTS

Al l dr edge and pl ant equi pment shal l be r egi st er ed wi t h t he AUTOMATI C I DENTI FI CATI ON SYSTEM ( AI S) i n or der t o ensur e t hat t he ent i r e f oot pr i nt of t he Cont r act ' s wor ki ng vessel s and scows ar e avai l abl e on mar i ne t r af f i cker ' s el ect r oni c char t di spl ays.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

SECTI ON 01 54 50 Page 3

SECTI ON TABLE OF CONTENTS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

SECTI ON 35 20 23

MECHANI CAL DREDGI NG

PART 1 GENERAL

1. 1 REFERENCES

1. 2 GENERAL I NFORMATI ON

1. 3 ENVI RONMENTAL COMPLI ANCE AND PROTECTI ON

1. 4 UNDERWATER DI VI NG OPERATI ONS

1. 5 DEFI NI TI ONS

1. 5. 1 Feder al Navi gat i on Pr oj ect ( FNP)

1. 5. 2 Shoal i ng

1. 5. 3 Shoal

1. 5. 4 Mai nt enance Dr edgi ng

1. 5. 5 Mai nt enance Mat er i al

1. 6 SUBMI TTALS

1. 7 ORDER OF WORK

1. 8 ENVI RONMENTAL WI NDOWS

1. 9 NOTI FI CATI ONS

1. 9. 1 Not i ce of Mi spl aced Mat er i al

1. 9. 2 Not i ce of Need f or Dr edgi ng Sur vey

1. 9. 3 Rel ocat i on of Navi gat i on Ai ds

1. 9. 4 Pl acement of Dr edgi ng Ai ds

1. 10 MATERI AL TO BE DREDGED

1. 10. 1 Resul t s of Expl or at i ons

1. 10. 2 I nt er pr et at i on

1. 10. 3 Debr i s

1. 10. 4 Ar t i f i c i al Obst r uct i ons and Ot her Mat er i al

1. 10. 5 Har d Mat er i al

1. 11 DEBRI S MANAGEMENT

1. 12 EXI STI NG SI TE CONDI TI ONS

1. 13 WORK AREA

1. 13. 1 Access

1. 13. 1. 1 Cont r act or Access

1. 13. 1. 2 Emer gency Access

1. 13. 2 Pr ot ect i on of Exi st i ng Wat er ways

1. 13. 3 Pr ot ect i on of Exi st i ng St r uct ur es

1. 13. 4 Pr ot ect i on of Ut i l i t y Li nes

1. 13. 5 Uni dent i f i ed Pi pel i nes or Ut i l i t i es

1. 13. 6 Saf et y of St r uct ur es

1. 14 I NSPECTI ON OF WORK

1. 14. 1 Met hod of Communi cat i on

1. 14. 2 Tr anspor t at i on

1. 15 FUEL OI L HANDLI NG

1. 16 DOCKS, PI ERS, AND MOORI NGS

1. 16. 1 Act i ve Docks, Pi er s, Gangway and Moor i ngs

1. 16. 2 Der el i ct Moor i ngs

1. 16. 3 Fl oat s

1. 17 PERMI TS

1. 18 BASI S FOR BI DS

PART 2 PRODUCTS

SECTI ON 35 20 23 Page 1

PART 3 EXECUTI ON

3. 1 DREDGI NG PLANT AND ASSOCI ATED EQUI PMENT

3. 1. 1 Gener al Requi r ement s

3. 1. 2 Dr edgi ng Pl ant

3. 1. 3 Associ at ed Equi pment

3. 1. 3. 1 Tow Boat s

3. 1. 3. 2 Scows

3. 1. 4 Ot her Equi pment

3. 2 CONDUCT OF DREDGI NG WORK

3. 2. 1 Gener al

3. 2. 2 Dr edgi ng Oper at i on Pl an

3. 2. 3 I nt er f er ence wi t h Navi gat i on

3. 2. 4 Dr edge Posi t i oni ng Syst em

3. 2. 5 Si gnal Li ght s

3. 2. 6 Sal vaged Mat er i al

3. 2. 7 Met hod of Communi cat i on

3. 2. 8 Pl ant and Equi pment Removal

3. 3 VESSELS USED FOR TRANSPORTI NG DREDGED MATERI AL

3. 4 DI SPOSAL OF DREDGED MATERI AL

3. 4. 1 Di sposal Si t es

3. 4. 2 Non- Desi gnat ed Di sposal Si t es

3. 5 DREDGI NG LI MI TS

3. 5. 1 Al l owabl e Over dept h

3. 5. 2 Si de Sl opes

3. 5. 3 Excessi ve Dr edgi ng

3. 6 CONTRACTOR QUALI TY CONTROL

3. 7 SHOALI NG

3. 8 FI NAL CLEANUP AND DEMOBI LI ZATI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 35 20 23 Page 2

SECTI ON 35 20 23

MECHANI CAL DREDGI NG

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2024) Saf et y and Occupat i onal Heal t h ( SOH) Requi r ement s

1. 2 GENERAL I NFORMATI ON

Thi s Sect i on cover s t he per f or mance f or al l wor k r equi r ed t o r emove t he speci f i ed mat er i al s f r om wi t hi n t he pr escr i bed wor k ar ea l i mi t s as i ndi cat ed, and pl acement of t he dr edge mat er i al wi t hi n t he pr escr i bed desi gnat ed di sposal s i t e. The Cont r act or i s r esponsi bl e f or maki ng t hei r own i nvest i gat i on of submer ged, sur f ace, and over head st r uct ur es i n t he wor k ar eas and ot her l ocat i ons t hey f i nd necessar y t o t r aver se. The Cont r act or shal l ver i f y s i t e condi t i ons i n advance of dr edgi ng oper at i ons.

1. 3 ENVI RONMENTAL COMPLI ANCE AND PROTECTI ON

The Cont r act or shal l compl y wi t h condi t i ons and r equi r ement s of envi r onment al per mi t ( s) . The Gover nment wi l l secur e t he envi r onment al per mi t ( s) f or dr edgi ng and pl acement of mat er i al as i ndi cat ed under Subpar t ENVI RONMENTAL PERMI TS AND COMMI TMENTS i n Sect i on 01 57 19

TEMPORARY ENVI RONMENTAL CONTROLS.

Dur i ng t he l i f e of t he cont r act , t he Cont r act or shal l pr ovi de and mai nt ai n envi r onment al pr ot ect i ve measur es. Al so, t he Cont r act or shal l be pr epar ed and r esponsi bl e f or pr ovi di ng envi r onment al c l ean- up and pr ot ect i ve measur es r equi r ed t o cor r ect condi t i ons, such as hazar dous mat er i al , oi l spi l l s , or l oss of debr i s, t hat occur dur i ng t he dr edgi ng oper at i ons. The Cont r act or shal l compl y wi t h Feder al , St at e, and l ocal r egul at i ons per t ai ni ng t o wat er , ai r , and noi se pol l ut i on. Ref er t o Sect i on 01 57 19

TEMPORARY ENVI RONMENTAL CONTROLS.

1. 4 UNDERWATER DI VI NG OPERATI ONS

I n t he event t hat under wat er di v i ng oper at i ons become necessar y due t o t he wor k of t hi s cont r act , such oper at i ons shal l be conduct ed i n accor dance wi t h EM 385- 1- 1, Sect i on 30.

1. 5 DEFI NI TI ONS

1. 5. 1 Feder al Navi gat i on Pr oj ect ( FNP)

The FNP under t hi s cont r act i s def i ned as t he 11- f oot deep ent r ance channel , a 9- f oot - deep channel , a 6- f oot - deep channel , t wo 6- f oot - deep anchor ages, t wo 9- f oot - deep anchor ages, an 11- f oot - deep anchor age, and a

SECTI ON 35 20 23 Page 3

6- f oot - deep t ur ni ng basi n.

1. 5. 2 Shoal i ng

Shoal i ng i s t he deposi t i on, or bui l d- up, of sedi ment i n t he Feder al Navi gat i on Pr oj ect ( FNP) causi ng a r educt i on i n t he wat er dept h.

1. 5. 3 Shoal

An ar ea of deposi t ed sedi ment wher e t he wat er dept h i s l ess t han t he r equi r ed dept h.

1. 5. 4 Mai nt enance Dr edgi ng

Mai nt enance Dr edgi ng under t hi s cont r act i s def i ned as t he r emoval of shoal ed mat er i al t hat has accumul at ed wi t hi n t he Feder al Navi gat i on Pr oj ect ( FNP) s i nce t he compl et i on of t he l ast mai nt enance dr edgi ng.

1. 5. 5 Mai nt enance Mat er i al

Mai nt enance mat er i al i s def i ned as shoal s and sedi ment s t hat have accumul at ed wi t hi n t he Feder al Navi gat i on Pr oj ect af t er pr evi ous mai nt enance dr edgi ng oper at i ons. Mai nt enance mat er i al al so i ncl udes accumul at ed sedi ment mat er i al t hat s l oughs of f s i de s l opes.

1. 6 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Dr edgi ng Oper at i on Pl an; G, RO

Submi t a wor k pl an f or accompl i shi ng t he dr edgi ng wor k of t hi s cont r act .

Debr i s Management Pl an

Devel op and submi t a debr i s management pl an t o t he Cont r act i ng Of f i cer f or r evi ew.

Scows

Submi t scow car ds f or each scow t o be used f or cont r act wor k.

Scow car ds shal l have i nf or mat i on speci f i ed i n par agr aph " Scows" .

Desi gnat ed Haul Rout e; G, RO

SD- 05 Desi gn Dat a

Equi pment and Per f or mance Dat a

The Cont r act or shal l f ur ni sh pr oof of el ect r oni c posi t i oni ng equi pment cal i br at i on t o t he Cont r act i ng Of f i cer .

SECTI ON 35 20 23 Page 4

Dai l y Repor t of Oper at i ons

Submi t Dai l y Repor t of Oper at i ons f or each dr edge. Thi s r epor t shal l be submi t t ed on a dai l y basi s as speci f i ed under subpar t bel ow t i t l ed " Cont r act or Qual i t y Cont r ol . "

Mont hl y Repor t of Oper at i ons

Submi t a Mont hl y Repor t of Oper at i ons f or each mont h or par t i al mont h' s wor k as speci f i ed under subpar t bel ow t i t l ed " Cont r act or Qual i t y Cont r ol . "

1. 7 ORDER OF WORK

a. The Cont r act or shal l pr epar e and submi t t o t he Cont r act i ng Of f i cer f or r evi ew and appr oval a pr ogr ess schedul e i n accor dance wi t h Sect i on 01 11 00 SUMMARY OF WORK, Par agr aph " Wor k Sequence" and Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS, Subpar t 1. 9. 1 " Envi r onment al Dr edge Wi ndow" .

b. Ther e i s no speci f i c or der of wor k f or t hi s pr oj ect . The dr edgi ng per f or med by al l dr edges shal l be cont i nuous wi t hi n r eaches appr oved by t he Cont r act i ng Of f i cer .

c. The Gover nment r eser ves t he r i ght t o change t he or der of wor k at any t i me.

1. 8 ENVI RONMENTAL WI NDOWS

Al l wor k shal l be accompl i shed wi t hi n t he desi gnat ed envi r onment al wi ndows speci f i ed under Subpar t PERI OD OF PERFORMANCE, ENVI RONMENTAL WI NDOW, AND DREDGI NG AND DI SPOSAL PERI OD i n Sect i on 01 11 00 SUMMARY OF WORK and Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS, Subpar t 1. 9. 1, " Envi r onment al Dr edge Wi ndow" .

1. 9 NOTI FI CATI ONS

1. 9. 1 Not i ce of Mi spl aced Mat er i al

The Cont r act or shal l not i f y t he Cont r act i ng Of f i cer and t he U. S. Coast Guar d Mar i ne Saf et y Of f i ce of any mi spl aced mat er i al .

1. 9. 2 Not i ce of Need f or Dr edgi ng Sur vey

Ref er t o Sect i on 01 71 23 FI ELD ENGI NEERI NG FOR DREDGI NG f or met hod of measur ement , qual i t y cont r ol sur veys, Gover nment and Cont r act or sur veys, vol ume comput at i ons, and r equi r ed not i ce t o t he Cont r act i ng Of f i cer .

1. 9. 3 Rel ocat i on of Navi gat i on Ai ds

The Cont r act or shal l not r emove, change t he l ocat i on of , obst r uct , wi l l f ul l y damage, make f ast t o, or i nt er f er e wi t h any ai d t o navi gat i on.

The Cont r act or shal l not i f y t he U. S. Coast Guar d Di st r i ct Commander , i n wr i t i ng, wi t h a copy t o t he Cont r act i ng Of f i cer , 30 days i n advance of t he t i me he pl ans t o dr edge adj acent t o any ai ds whi ch r equi r e r el ocat i on t o f aci l i t at e t he dr edgi ng oper at i on. A copy of t he not i f i cat i on shal l be pr ovi ded t o t he Cont r act i ng Of f i cer .

SECTI ON 35 20 23 Page 5

1. 9. 4 Pl acement of Dr edgi ng Ai ds

The Cont r act or shal l not i f y and obt ai n appr oval f r om t he U. S. Coast Guar d f or al l buoys, dr edgi ng ai d mar ker s t o be pl aced i n t he wat er , and dr edgi ng ai d mar ker s af f i xed wi t h a l i ght pr i or t o t he i nst al l at i on.

Dr edgi ng ai d mar ker s and l i ght s shal l not be col or ed or pl aced i n a manner t hat t hey wi l l obst r uct or be conf used wi t h navi gat i on ai ds.

1. 10 MATERI AL TO BE DREDGED

1. 10. 1 Resul t s of Expl or at i ons

a. Expl or at i ons consi st i ng of cor e sampl es t o det er mi ne t he char act er of mat er i al s t o be r emoved have been made by t he Gover nment f or sel ect ed ar eas of t hi s pr oj ect . Gr ai n s i ze anal ysi s r esul t s ar e at t ached at t he end of Sect i on 00 32 00 GEOTECHNI CAL DATA. Al t hough t he r esul t s of such expl or at i ons ar e r epr esent at i ve of subsur f ace condi t i ons at t hei r r espect i ve l ocat i ons and f or t hei r r espect i ve ver t i cal r eaches, l ocal var i at i ons i n t he subsur f ace mat er i al s ar e t o be expect ed and, i f encount er ed, wi l l not be consi der ed mat er i al l y di f f er ent wi t hi n t he pur vi ew of t he cont r act .

b. Fi f t een sedi ment sampl es ( A t hr ough 0) wer e col l ect ed i n Jul y 2021, except st at i on I , J and L wer e col l ect ed on August 2022 by USACE, New Engl and Di st r i ct t o anal yze and measur e t he gr ai n s i zes of t he mat er i al t o be r emoved f r om wi t hi n t he Feder al Navi gat i on Pr oj ect .

Test r esul t s i ndi cat ed t hat t he mat er i al was pr edomi nant l y f i ne- gr ai ned sedi ment . For sampl i ng l ocat i ons wi t hi n t he Feder al Navi gat i on Pr oj ect , r ef er t o t he " Sedi ment Sampl e Locat i ons" Fi gur e i ncl uded i n t he Sui t abi l i t y Det er mi nat i on at t achment at t he end of t he speci f i cat i on document .

c. I t i s t he r esponsi bi l i t y of t he Cont r act or t o car ef ul l y exami ne t he condi t i ons t hat exi st at t he s i t e of t he pr oposed wor k, and t o r evi ew t he cont r act document s and any ot her i nf or mat i on gat her ed f or use i n det er mi ni ng equi pment , means, and met hods f or t he execut i on of t he wor k r equi r ed i n t hi s cont r act . Thi s i s not onl y f or t he pur pose of maki ng t hei r own det er mi nat i on r egar di ng t he char act er of t he mat er i al t o be dr edged, but al so f or t he pur pose of not i ng t he pr esence of any condi t i ons whi ch may i mpact t hei r pr oduct i v i t y or abi l i t y t o compl et e t he wor k. I mpact s t o t he pr oj ect whi ch ar e f ound t o be r esul t i ng f r om a l ack of appr opr i at e due di l i gence on behal f of t he Cont r act or shal l not be r ecogni zed as a l egi t i mat e basi s f or r enegot i at i ng t he t er ms of payment f or , or t he pr osecut i on or compl et i on of , t he Wor k.

d. Pr i or t o bi ddi ng, t he Cont r act or may, at i t s di scr et i on and expense, conduct addi t i onal i nvest i gat i ons t o f ur t her det er mi ne condi t i ons at t he s i t e and det er mi ne t he char act er of t he mat er i al .

1. 10. 2 I nt er pr et at i on

Subsur f ace i nvest i gat i on dat a i s pr ovi ded f or i nf or mat i onal pur poses onl y and i s f or t he conveni ence of t he Cont r act or . The dat a per t ai ns t o t he speci f i c l ocat i ons i ndi cat ed onl y and no assur ance i s gi ven t hat t hese condi t i ons ar e r epr esent at i ve of condi t i ons bet ween bor i ngs or ar eas adj acent t her et o. The r esponsi bi l i t y l i es wi t h t he Cont r act or t o i nt er pr et subsur f ace condi t i ons t hat may af f ect t he Wor k.

SECTI ON 35 20 23 Page 6

1. 10. 3 Debr i s

Al l debr i s r emoved f r om t he dr edgi ng ar ea wi l l be separ at ed and st ockpi l ed f or di sposal by t he Cont r act or , i n accor dance wi t h l ocal , Feder al and st at e l aws and r egul at i ons, at an upl and si t e suppl i ed by t he Cont r act or .

Di sposal shal l be t he r esponsi bi l i t y of t he Cont r act or and di sposal shal l be out si de of t he pr oj ect l i mi t s.

1. 10. 4 Ar t i f i c i al Obst r uct i ons and Ot her Mat er i al

Except f or t he ut i l i t y l ocat i ons i ndi cat ed on t he cont r act dr awi ngs, t he Gover nment has no addi t i onal knowl edge of exi st i ng debr i s, boul der s, cabl es, pi pes, or ot her ar t i f i c i al obst r uct i ons or of any wr ecks, wr eckage, or ot her mat er i al t hat woul d necessi t at e t he use of expl osi ves or t he empl oyment of addi t i onal equi pment f or economi cal r emoval . I f act ual condi t i ons di f f er f r om t hose st at ed or shown, or bot h, an adj ust ment i n cont r act pr i ce or t i me f or compl et i on, or bot h, wi l l be made i n accor dance wi t h " FAR 52. 236- 2, Di f f er i ng Si t e Condi t i ons" .

1. 10. 5 Har d Mat er i al

The Gover nment has no knowl edge of har d mat er i al ( f r agment s t oo l ar ge t o be r emoved i n one pi ece by t he dr edge) such as exi st i ng boul der s, wr ecks or wr eckage, or ot her mat er i al of such si ze or char act er as t o r equi r e t he use of expl osi ves or speci al or addi t i onal equi pment f or i t s economi cal r emoval . I n case t he act ual condi t i ons di f f er f r om t hose st at ed or shown, or bot h, an adj ust ment i n cont r act pr i ce or t i me of compl et i on, or bot h, wi l l be made i n accor dance wi t h " FAR 52. 236- 2, Di f f er i ng Si t e Condi t i ons. "

1. 11 DEBRI S MANAGEMENT

A Debr i s Management Pl an shal l be devel oped, r evi ewed by t he Cont r act i ng Of f i cer , and f ol l owed by t he Cont r act or . Debr i s r emoved f r om t he bot t om dur i ng dr edgi ng oper at i ons, whi ch i s not sui t abl e f or di sposal at t he desi gnat ed di sposal s i t e, shal l be col l ect ed and r emoved f r om t he wor k s i t e. Al l obj ect s t hat become di s l odged f r om t he bot t om sedi ment s dur i ng dr edgi ng act i v i t i es and f l oat t o t he sur f ace shal l be col l ect ed, separ at ed and st ockpi l ed f or di sposal upl and. Di sposal of debr i s shal l not be per mi t t ed on r i ver banks, navi gabl e wat er ways, or at t he di sposal s i t e.

Each day dur i ng dr edgi ng oper at i ons, t he Cont r act or shal l use a boat t o col l ect and r emove f l oat i ng debr i s r esul t i ng f r om pr oj ect act i v i t i es.

Thi s debr i s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j obsi t e. Cont ai ner s f or t empor ar y st or age of t he col l ect ed debr i s shal l be mai nt ai ned on t he dr edge or suppor t bar ge. The r emoval and di sposal of t hi s debr i s shal l be accompl i shed at no addi t i onal cost t o t he Gover nment .

1. 12 EXI STI NG SI TE CONDI TI ONS

I t i s hi ghl y r ecommended t hat t he bi dder s exami ne t he si t e of t he wor k, i ncl udi ng t he di sposal ar ea and deci de f or t hemsel ves as t o t he condi t i ons af f ect i ng t hei r oper at i ons. See Cont r act Cl ause ent i t l ed: " SI TE

I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK. "

SECTI ON 35 20 23 Page 7

1. 13 WORK AREA

1. 13. 1 Access

1. 13. 1. 1 Cont r act or Access

The Cont r act or shal l be r esponsi bl e f or pr ovi di ng and mai nt ai ni ng access necessar y f or i t s equi pment and pl ant t o and f r om t he wor k s i t e, moor i ng ar ea, and di sposal ar ea. The Cont r act or shal l ascer t ai n t he envi r onment al condi t i ons whi ch can af f ect t he access such as c l i mat e, wi nds, cur r ent s, waves, dept hs, shoal i ng, and scour i ng t endenci es.

1. 13. 1. 2 Emer gency Access

The Cont r act or shal l be r esponsi bl e f or pr ovi di ng and mai nt ai ni ng access necessar y f or f i r eboat s and f i r st r esponder s i n t he event of a f i r e or emer gency.

1. 13. 2 Pr ot ect i on of Exi st i ng Wat er ways

The Cont r act or shal l conduct hi s oper at i ons i n such a manner t hat mat er i al or ot her debr i s ar e not pushed out si de of dr edgi ng l i mi t s or ot her wi se deposi t ed i n exi st i ng s i de channel s, basi ns, docki ng ar eas, or ot her ar eas bei ng ut i l i zed by vessel s. The Cont r act or wi l l be r equi r ed t o change hi s met hod of oper at i ons as may be r equi r ed t o compl y wi t h t he above r equi r ement s. Shoul d any bot t om mat er i al or ot her debr i s be pushed i nt o ar eas descr i bed above, as a r esul t of t he Cont r act or ' s oper at i ons, t he mat er i al must be pr ompt l y r emoved at no addi t i onal cost t o t he Gover nment .

1. 13. 3 Pr ot ect i on of Exi st i ng St r uct ur es

a. The Cont r act or shal l conduct t he dr edgi ng oper at i on such t hat i t does not under mi ne, weaken or ot her wi se i mpai r exi st i ng st r uct ur es l ocat ed i n or near t he ar eas t o be dr edged. The Cont r act or shal l i nvest i gat e t he exi st i ng st r uct ur es at t he s i t e and pl an t he dr edgi ng wor k accor di ngl y.

b. The Cont r act or shal l be hel d r esponsi bl e f or any damage t o any exi st i ng st r uct ur es or f aci l i t i es r esul t i ng f r om dr edgi ng. Damage r esul t i ng f r om dr edgi ng oper at i ons shal l be r epai r ed pr ompt l y by t he Cont r act or at t he Cont r act or ' s expense. Damage t o st r uct ur es or f aci l i t i es r esul t i ng f r om t he Cont r act or ' s negl i gence wi l l r esul t i n suspensi on of dr edgi ng and r equi r e pr ompt r epai r at t he Cont r act or ' s expense as a pr er equi s i t e t o t he r esumpt i on of dr edgi ng.

1. 13. 4 Pr ot ect i on of Ut i l i t y Li nes

Exi st i ng ut i l i t y l i nes t hat ar e made known t o t he Cont r act or pr i or t o or dur i ng dr edgi ng shal l be pr ot ect ed f r om damage dur i ng dr edgi ng, and i f damaged, shal l be sat i sf act or i l y r epai r ed by t he Cont r act or at no addi t i onal cost t o t he Gover nment .

I n t he event t hat t he Cont r act or damages any exi st i ng ut i l i t y l i nes t hat ar e not shown on t he Cont r act Dr awi ngs or t he l ocat i ons of whi ch ar e not known t o t he Cont r act or , r epor t shal l be made i mmedi at el y t o t he Cont r act i ng Of f i cer . I f t he Cont r act i ng Of f i cer det er mi nes t hat r epai r s shal l be made by t he Cont r act or , such r epai r s wi l l be or der ed under t he Cont r act Cl ause ent i t l ed DI FFERI NG SI TE CONDI TI ONS.

SECTI ON 35 20 23 Page 8

1. 13. 5 Uni dent i f i ed Pi pel i nes or Ut i l i t i es

Any uni dent i f i ed pi pel i nes or ut i l i t i es t hat may be f ound wi t hi n t he l i mi t s of t he wor k, dur i ng t he cour se of dr edgi ng shal l not be di st ur bed nor shal l excavat i on be per f or med at t hi s l ocat i on unl ess appr oved by t he Cont r act i ng Of f i cer . I f act ual condi t i ons di f f er f r om t hose st at ed or shown, or bot h, an adj ust ment i n cont r act pr i ce or t i me f or compl et i on, or bot h, wi l l be made i n accor dance wi t h " FAR 52. 236- 2, Di f f er i ng Si t e Condi t i ons. "

1. 13. 6 Saf et y of St r uct ur es

The pr osecut i on of wor k shal l ensur e t he st abi l i t y of pi er s, bul kheads, and any ot her st r uct ur es l y i ng on or adj acent t o t he s i t e of t he wor k, i nsof ar as st r uct ur es may be j eopar di zed by dr edgi ng oper at i ons. Repai r damage r esul t i ng f r om dr edgi ng oper at i ons, i nsof ar as such damage may be caused by var i at i on i n l ocat i ons or dept h of dr edgi ng, or bot h, f r om t hat i ndi cat ed or per mi t t ed under t he cont r act .

1. 14 I NSPECTI ON OF WORK

I nspect t he wor k, keep r ecor ds of wor k per f or med, and ensur e t hat gages, t ar get s, r anges, and ot her mar ker s ar e i n pl ace and usabl e f or t he i nt ended pur pose. See Sect i on 01 45 00 CONTRACTOR QUALI TY CONTROL, and Sect i on 35 20 23. 13 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM: SCOW -

MONI TORI NG PROFI LE.

1. 14. 1 Met hod of Communi cat i on

For t he dur at i on of t he cont r act pr ovi de t he Cont r act i ng Of f i cer wi t h t wo por t abl e t wo- way VHF mar i ne r adi os capabl e of communi cat i ng wi t h t he Cont r act or ' s mar i ne pl ant and t o pr ovi de communi cat i on bet ween t he dr edge cr ew, di sposal cr ew, and t he Cont r act i ng Of f i cer .

1. 14. 2 Tr anspor t at i on

The Cont r act or shal l pr ovi de, at t he r equest of t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) , t he use of such boat s, boat men, l abor er s, and mat er i al f or mi ng a par t of t he or di nar y and usual equi pment and cr ew of t he equi pment or mar i ne pl ant as may be r easonabl y necessar y i n i nspect i ng and moni t or i ng t he wor k. The Cont r act or shal l pr ovi de, at t he r equest of t he COR, sui t abl e t r anspor t at i on f r om al l poi nt s on shor e desi gnat ed by t he COR t o and f r om t he var i ous pi eces of pl ant , and t he wor k s i t e.

1. 15 FUEL OI L HANDLI NG

The Cont r act or shal l assur e t hat al l f uel oi l t r ansf er oper at i ons t o or f r om i t s pl ant compl y wi t h al l Feder al , st at e, and l ocal l aws, codes and r egul at i ons.

1. 16 DOCKS, PI ERS, AND MOORI NGS

1. 16. 1 Act i ve Docks, Pi er s, Gangway and Moor i ngs

The Nar r aguagus Ri ver Har bor mast er wi l l be r esponsi bl e f or t he r emoval of al l v i s i bl e moor i ngs wi t hi n t he l i mi t s of t he Feder al Navi gat i on Pr oj ect ( FNP) at no cost t o t he Cont r act or . Moor i ngs wi l l be r emoved f r om t he dr edge ar ea pr i or t o t he Cont r act or ' s mobi l i zat i on t o t he s i t e.

SECTI ON 35 20 23 Page 9

1. 16. 2 Der el i ct Moor i ngs

Der el i ct moor i ngs l ocat ed by t he Cont r act or dur i ng dr edgi ng oper at i ons, or ot her wi se made known t o t he Cont r act or , shal l be r epor t ed t o t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer wi l l ver i f y t he l ocat i on of t he moor i ngs and any pot ent i al hazar ds t o navi gat i on. The Cont r act or shal l be pr epar ed t o r emove der el i ct moor i ngs, t r anspor t , unl oad and r ecor d a coor di nat e of each pl aced der el i ct moor i ng i n t he Der el i ct Moor i ng Pl acement Ar ea as shown on sheet G- 002 and C- 106.

1. 16. 3 Fl oat s

Pr i or t o t he Cont r act or ' s mobi l i zat i on t o t he s i t e, t he Nar r aguagus Ri ver Har bor mast er wi l l r emove t he f l oat i ng dock, pi er and gangway f r om t he nor t heast of t he f eder al channel as desi gnat ed and shown on t he Cont r act Dr awi ng sheet C- 101. The Cont r act or shal l be awar e t hat al t hough t he f l oat i ng dock i s t o be r emoved, t hei r pi er s wi l l r emai n i n pl ace. The Cont r act or shal l al so be awar e t hat t he dock, pi er and gangway i n t he sout h of t he st at e anchor age as desi gnat ed and shown on t he Cont r act Dr awi ng sheet C- 106 wi l l r emai n i n pl ace and undi st ur bed. The Town wi l l r et ur n t he f l oat i ng dock and moor i ngs af t er t he dr edgi ng wor k i s accept ed by t he Gover nment .

1. 17 PERMI TS

The Cont r act or shal l compl y wi t h condi t i ons and r equi r ement s of t he Cor ps of Engi neer s Per mi t and ot her St at e or Feder al per mi t s. The Cont r act i ng Of f i cer wi l l secur e t he per mi t f or dr edgi ng and di sposal of mat er i al as i ndi cat ed.

1. 18 BASI S FOR BI DS

For uni t pr i ce bi d, see SF 1442, " Sol i c i t at i on, Of f er and Awar d" and " Schedul e of Bi d I t ems. "

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 DREDGI NG PLANT AND ASSOCI ATED EQUI PMENT

3. 1. 1 Gener al Requi r ement s

Pl ant and equi pment shal l meet t he r equi r ement s of Sect i on 01 54 50

DREDGI NG PLANT AND EQUI PMENT.

3. 1. 2 Dr edgi ng Pl ant

a. Al l dr edgi ng under t hi s cont r act shal l be per f or med usi ng a mechani cal t ype dr edge wi t h scows. The use of hydr aul i c dr edgi ng wi l l not be per mi t t ed on t hi s pr oj ect . No dr aggi ng of mat er i al wi l l be al l owed except as di r ect ed by t he Cont r act i ng Of f i cer .

b. Mat er i al r emoved by dr edgi ng shal l be l oaded ont o scows, t r anspor t ed, and di sposed of at t he appr oved di sposal s i t e as speci f i ed bel ow.

Over f l ow of scows whi l e dr edgi ng shal l not be per mi t t ed.

SECTI ON 35 20 23 Page 10

3. 1. 3 Associ at ed Equi pment

3. 1. 3. 1 Tow Boat s

Al l t ow boat s used f or t owi ng t o di sposal ar eas shal l be equi pped wi t h DGPS and t r ack r ecor di ng navi gat i onal equi pment or appr oved equi val ent el ect r oni c navi gat i on equi pment , r adar , cor r ect ed compass, mar i ne r adi o, and dept h soundi ng equi pment whi ch i s t o be mai nt ai ned i n oper at i ng condi t i on dur i ng each t ow. The t ow boat s ut i l i zed by t he Cont r act or f or t hi s pur pose shal l be of a s i ze adequat e f or t owi ng i n l ar ge r i ver s wi t h s i gni f i cant cur r ent and shal l have necessar y r eser ve power f or maneuver i ng wi t h scows and under emer gency condi t i ons as wel l as f or cont r ol of scows at t he di sposal poi nt .

3. 1. 3. 2 Scows

a. Fai l ur e t o r epai r l eaks or a change i n t he met hod of oper at i on whi ch i s r esul t i ng i n spi l l age wi l l r esul t i n suspensi on of dr edgi ng oper at i ons and r equi r e pr ompt r epai r or change of oper at i on t o pr event spi l l age as a pr er equi s i t e t o t he r esumpt i on of dr edgi ng.

b. The Cont r act or shal l pr ovi de and mai nt ai n mar ki ngs on al l scows cl ear l y i ndi cat i ng t he dr af t of t he scow and shal l pr ovi de scow car ds f or each scow used on t he cont r act wor k. The scow car ds shal l show di mensi ons and vol umes of i ndi v i dual pocket s of scows and t ot al vol umes f or var yi ng dept hs bel ow coami ng or t op of pocket s. The Cont r act or shal l al so pr ovi de dr af t ver ses di spl acement cur ves f or al l scows. Thi s i s t o enabl e t he Cont r act i ng Of f i cer per sonnel t o make a det er mi nat i on of scow vol ume and cor r espondi ng dr af t s under par t i al and f ul l l oad condi t i ons. These measur ement s ar e t o be made at t he t i me of i ni t i al use of each scow. The scow vol ume est i mat es ar e f or use i n connect i on wi t h di sposal ar ea moni t or i ng st udi es and ar e not i nt ended t o be used i n det er mi ni ng quant i t i es dr edged. At t he begi nni ng of t he wor k and as addi t i onal scows ar r i ve on t he pr oj ect , suf f i c i ent t i me shal l be al l owed by t he Cont r act or and assi st ance of Cont r act or per sonnel shal l be made avai l abl e by t he Cont r act or f or t he pur pose of obt ai ni ng t he measur ement s of each scow under var i ous par t i al and f ul l l oad condi t i ons. Dur i ng t he ent i r e per i od of cont r act wor k, t he Cont r act or shal l pr ovi de and mai nt ai n suf f i c i ent spot or f l oodl i ght s t o per mi t t he r eadi ng of t he dr af t on t he s i des of scows at bow and st er n f r om t he t ow boat at ni ght and when vi s i bi l i t y i s i mpai r ed.

c. The Cont r act or shal l achi eve pr oper c l osur e and wat er t i ght ness of pocket door s t o el i mi nat e seepage or l eakage of mat er i al . The use of pl ast i c mat er i al t o cover cr acks i n scow pocket s wi l l not be al l owed.

3. 1. 4 Ot her Equi pment

Submi t al l ot her equi pment speci f i cat i ons and oper at i ng par amet er s f or r evi ew and appr oval by t he Cont r act i ng Of f i cer pr i or t o mobi l i zat i on. No addi t i onal compensat i on shal l be consi der ed i f ot her equi pment i s al l owed.

3. 2 CONDUCT OF DREDGI NG WORK

3. 2. 1 Gener al

Dr edgi ng shal l consi st of t he r emoval and sat i sf act or y di sposal of al l mat er i al encount er ed t o achi eve t he r equi r ed dept hs and si de sl opes as

SECTI ON 35 20 23 Page 11 shown on t he Cont r act Dr awi ngs and as speci f i ed her ei n.

3. 2. 2 Dr edgi ng Oper at i on Pl an

At l east 30 cal endar days pr i or t o i ni t i at i ng any dr edgi ng, t he Cont r act or shal l submi t a det ai l ed dr edgi ng oper at i on pl an f or r evi ew and comment by t he Cont r act i ng Of f i cer . Dr edgi ng shal l not commence unt i l pl an has been accept ed, t o t he sat i sf act i on, of t he Cont r act i ng Of f i cer . The pl an shal l i ncl ude, but not be l i mi t ed t o, descr i pt i on of mechani cal dr edgi ng ( bucket , c l amshel l ( gr ab) or di pper ( backhoe) ) oper at i ons, sequence of wor k, ant i c i pat ed pl ant and equi pment ; Expect ed coor di nat i on r equi r ement s;

access, l ayout of dr edgi ng l i mi t s, dr edgi ng t o pr oj ect dept hs, r et ent i on of mat er i al , sur vey r equi r ement s; pr oposed measur es t o avoi d over dr edgi ng;

s i de s l ope mat er i al r emoval met hodol ogy; s i de s l opes or box cut ; anchor i ng l ocat i ons; qual i t y cont r ol sur vey pr ocedur es; ant i c i pat ed pr obl em ar eas of pr oj ect ; and al l ant i c i pat ed navi gat i on channel c l osur es.

3. 2. 3 I nt er f er ence wi t h Navi gat i on

Mi ni mi ze i nt er f er ence wi t h t he use of channel s and passages. The Cont r act i ng Of f i cer wi l l di r ect t he shi f t i ng or movi ng of dr edges or t he i nt er r upt i on of dr edgi ng oper at i ons t o accommodat e t he movement of r ecr eat i onal and commer ci al vessel s and f l oat i ng equi pment , i f necessar y.

The Cont r act or shal l compl y wi t h al l r equest s f r om t he Cont r act i ng Of f i cer t o move or i nt er r upt dr edgi ng oper at i ons f or a per i od of 2 hour s or l ess at no addi t i onal cost t o t he Gover nment .

3. 2. 4 Dr edge Posi t i oni ng Syst em

The dr edge shal l be equi pped wi t h an el ect r oni c dr edge bucket posi t i oni ng syst em ( DBPS) consi st i ng of Real - t i me Ki nemat i c Di f f er ent i al Gl obal Posi t i oni ng Syst em ( RTK- DGPS) , and posi t i oni ng and t r acki ng sof t war e, t o enabl e accur at e posi t i oni ng of t he dr edge. At a mi ni mum, t he RTK- DBPS shal l be capabl e of pr esent i ng a dr edge pr i sm f i l e on a gr i d, and pr ovi de t he oper at or a r eal - t i me, heads- up di spl ay of t he bucket and dr edge i n r el at i on t o s i t e bat hymet r y, r equi r ed el evat i on and al l owabl e over dept h sur f aces, and any obst acl es, i n pl an and sect i on v i ews.

3. 2. 5 Si gnal Li ght s

Each ni ght , bet ween sunset and sunr i se and dur i ng per i ods of r est r i ct ed vi s i bi l i t y , pr ovi de l i ght s f or f l oat i ng pl ant s and equi pment , appl i cabl e pi pel i ne, r anges, and mar ker s. Al so, pr ovi de l i ght s f or buoys t hat coul d endanger or obst r uct navi gat i on. When ni ght wor k i s i n pr ogr ess, mai nt ai n l i ght s f r om sunset t o sunr i se f or t he obser vat i on of dr edgi ng oper at i ons.

Li ght i ng shal l conf or m t o Uni t ed St at es Coast Guar d r equi r ement s f or v i s i bi l i t y and col or .

3. 2. 6 Sal vaged Mat er i al

Anchor s, chai ns, and ot her ar t i c l es of val ue whi ch ar e br ought t o t he sur f ace dur i ng dr edgi ng oper at i ons shal l r emai n, or become, t he pr oper t y of t he Gover nment , and shal l be deposi t ed on shor e at a conveni ent l ocat i on near t he s i t e of t he wor k, as di r ect ed.

3. 2. 7 Met hod of Communi cat i on

For t he dur at i on of t he cont r act , t he Cont r act or shal l pr ovi de t he Cont r act i ng Of f i cer wi t h t wo ( 2) por t abl e t wo- way VHF mar i ne r adi os. One

SECTI ON 35 20 23 Page 12 of whi ch i s capabl e of communi cat i ng wi t h t he Cont r act or ' s mar i ne pl ant and anot her whi ch i s capabl e of pr ovi di ng communi cat i on bet ween t he dr edge and di sposal cr ews and t he Cont r act i ng Of f i cer .

3. 2. 8 Pl ant and Equi pment Removal

Upon compl et i on of t he wor k, pr ompt l y r emove pl ant and equi pment , i ncl udi ng r anges, buoys, pi l es, and ot her mar ker s or obst r uct i ons.

3. 3 VESSELS USED FOR TRANSPORTI NG DREDGED MATERI AL

Al l naut i cal vessel s and conveyance syst ems shal l be oper at ed, l oaded and unl oaded i n such a manner as t o pr event over f l ow, spi l l s , l eaks, or ot her l oss of dr edged mat er i al s bet ween poi nt of pi ck- up and poi nt of deposi t i on wi t hi n t he di sposal ar ea. Under no condi t i ons shal l any bar ge or scow t r anspor t i ng dr edged mat er i al s have l ess t han 1 f oot of f r eeboar d. Thi s means t her e shal l be at l east 1 f oot bet ween t he t op of dr edged mat er i al s and/ or wat er i nsi de t he scow or bar ge and t he t op edge of t he bar ge or scow. Al l vessel s f or t r anspor t i ng dr edged mat er i al s shal l be wat er t i ght , wi t h al l weep hol es or openi ngs seal ed t o pr event any l eakage of wat er or dr edged mat er i al s. Any modi f i cat i ons t o vessel s t o al l ow addi t i onal f r eeboar d shal l be appr oved by t he Cont r act i ng Of f i cer . Al l vessel s f or t r anspor t i ng dr edged mat er i al must be i nspect ed and appr oved by t he Cont r act i ng Of f i cer 7 days pr i or t o t he st ar t of dr edgi ng. The Cont r act or shal l demonst r at e t hat al l vessel s ar e sound and wat er t i ght .

3. 4 DI SPOSAL OF DREDGED MATERI AL

3. 4. 1 Di sposal Si t es

a. Gener al :

( 1) Dr edged mat er i al shal l be pl aced i n scows and t r anspor t ed t o and di sposed of at t he desi gnat ed di sposal s i t e. Pr ovi de f or saf e t r anspor t at i on and di sposal of dr edged mat er i al s. Mat er i al shal l be deposi t ed and di st r i but ed evenl y at t he di sposal s i t e.

( 2) Do not r emove l oaded or par t i al l y l oaded scows f r om t he dr edge ar ea unt i l t he l oad has been measur ed by t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) . Not i f y t he COR when scows ar e r et ur ned t o t he dr edge ar ea.

( 3) Pr ovi de f or saf e t r anspor t at i on and di sposal of dr edged mat er i al s. Tr anspor t and di spose of dr edged mat er i al at t he di sposal s i t e speci f i ed. Ant i c i pat ed weat her condi t i ons shal l be det er mi ned pr i or t o depar t i ng f or t he di sposal s i t e.

( 4) Year - r ound, di sposal vessel s i ncl udi ng t ugs, bar ges, and scows t r ansi t i ng bet ween t he dr edge si t e and t he di sposal s i t e shal l oper at e at speeds not t o exceed 10 knot s. For unant i c i pat ed condi t i ons, a vessel may oper at e at a speed necessar y t o mai nt ai n saf e maneuver i ng speed i nst ead of t he r equi r ed 10 knot s. The i nt ent of t hi s condi t i on i s t o r educe t he pot ent i al f or vessel col l i s i ons wi t h endanger ed t ur t l es, f i sh, and whal es.

b. Desi gnat ed Di sposal Si t es

( 1) Dougl as I s l and Di sposal Si t e ( DI DS) :

SECTI ON 35 20 23 Page 13

DI DS i s l ocat ed 2. 5 mi l es f r om t he Nar r aguagus Ri ver FNP. The di sposal s i t e i s s i t uat ed i n out er Nar r aguagus Bay and l i es i n a shel t er ed ar ea bet ween a peni nsul a t o t he nor t hwest and i s l ands t o t he sout heast , sout h, and sout hwest . . Di sposal shal l occur wi t hi n t he pol ygon def i ned by t he t ar get coor di nat es pr ovi ded bel ow.

Di sposal Tar get Coor di nat es at DI DS ( ME St at e Pl ane - I s l and Zone NAD83 US Feet ) :

a. N 293887. 20, E 1152956. 59

b. N 292056. 82, E 1155062. 25

c. N 291823. 43, E 1154972. 66

d. N 291165. 97, E 1153127. 38

e. N 291207. 84, E 1151928. 11

( 2) USACE el ect r oni c coor di nat es of t he DI DS boundar y wi l l be document ed and moni t or ed by Gover nment i nspect or s dur i ng t he cour se of t he wor k. The el evat i on of t he di sposal mound( s) shal l not be hi gher t han - 20 f eet Mean Lower Low Wat er ( MLLW) . Al l di sposal shal l be done wi t h t he scow at a compl et e hal t . Thi s r equi r ement must be f ol l owed except when weat her or sea st at e cr eat e unsaf e condi t i ons i n whi ch case di sposal wi t h t he scow movi ng onl y f ast enough t o mai nt ai n saf e cont r ol ( gener al l y l ess t han one knot ) wi l l be per mi t t ed. Di sposal shal l not be at t empt ed i f t he above condi t i ons cannot be met .

Ant i c i pat ed weat her condi t i ons shal l be det er mi ned pr i or t o depar t i ng f or t he di sposal s i t e. Di sposal at t he Dougl as I s l and Di sposal Si t e may be per f or med wi t h t he scow i n mot i on at a speed no gr eat er t han 2 knot s as l ong as t he r el ease of t he mat er i al f r om t he scow ( as det er mi ned by t he dr af t change r ecor ded by t he Dr edgi ng Qual i t y Management ( DQM) Syst em) can be achi eved wi t hi n 300 f eet of t he speci f i ed t ar get .

c. Desi gnat ed Haul Rout e:

( 1) Dr edged mat er i al bei ng t r anspor t ed t o t he desi gnat ed di sposal s i t e shal l be t r anspor t ed al ong t he desi gnat ed haul r out e. The haul r out e has been coor di nat ed bet ween t he Gover nment and t he Mai ne Di vi s i on of Mar i ne Resour ces ( DMR) , and publ i shed l ocal l y i n a newspaper of gener al c i r cul at i on as a not i ce t o f i sher men t o r emove f i shi ng gear f r om t he haul r out e.

The at t achment at t he end of t hi s speci f i cat i on sect i on, t i t l ed " Haul Rout e" , pr ovi des a gener al l ayout of t he est abl i shed haul r out e f r om t he dr edge si t e t o t he Dougl as I s l and Di sposal Si t e.

( 2) The Cont r act or must not i f y t he publ i c of t he desi gnat ed haul r out es i n accor dance wi t h Sect i on 01 11 00 SUMMARY OF WORK, subpar agr aph t i t l ed " Publ i c Not i ce" .

3. 4. 2 Non- Desi gnat ed Di sposal Si t es

a. The deposi t of dr edged mat er i al s at unaut hor i zed or non- desi gnat ed di sposal s i t es i s pr ohi bi t ed and shal l be consi der ed mi spl aced mat er i al and wi l l r esul t i n t he suspensi on of dr edgi ng oper at i ons unt i l mi spl aced mat er i al i s r emoved and pr oper l y di sposed of t o t he sat i sf act i on of t he Gover nment . Cont r act or f ur ni shed di sposal ar eas wi l l not be per mi t t ed.

b. The Cont r act or shal l i mmedi at el y not i f y t he Cont r act i ng Of f i cer and t he U. S. Coast Guar d Mar i ne Saf et y Of f i ce of any mi spl aced mat er i al .

SECTI ON 35 20 23 Page 14

Cost s f or t he r emoval and r e- di sposal of mi spl aced mat er i al shal l be at t he expense of t he Cont r act or .

3. 5 DREDGI NG LI MI TS

3. 5. 1 Al l owabl e Over dept h

To cover unavoi dabl e i naccur aci es of dr edgi ng pr ocesses, dr edge mat er i al s r emoved t o t he over dept hs and wi t hi n t he dr edgi ng l i mi t s as shown on t he Cont r act Dr awi ngs wi l l be measur ed and pai d f or at f ul l cont r act pr i ce.

For speci f i ed over dept hs r ef er t o Cont r act Dr awi ngs.

3. 5. 2 Si de Sl opes

a. Mat er i al dr edged t o pr ovi de f or f i nal i ndi cat ed si de sl opes wi l l be measur ed and pai d f or at t he appl i cabl e uni t pr i ce. The mat er i al may be dr edged f r om t he or i gi nal posi t i on or by dr edgi ng t he space bel ow t he pay sl ope pl ane at t he bot t om of t he s l ope f or upsl ope mat er i al capabl e of f al l i ng i nt o t he cut . Payment wi l l not be made f or mat er i al i n excess of t he amount or i gi nal l y l y i ng above t he pay sl ope pl ane. The l i mi t i ng amount of s i de- sl ope over dept h wi l l be measur ed ver t i cal l y.

b. Dr edgi ng on si de sl opes shal l f ol l ow, as c l osel y as pr act i cabl e, t he l i nes i ndi cat ed on t he Cont r act Dr awi ngs. An al l owance wi l l be made f or dr edgi ng beyond t he l i nes i ndi cat ed or speci f i ed f or s i de s l opes.

The al l owance wi l l be det er mi ned by pr oj ect i ng a l i ne upwar ds, par al l el i ng t he pr oj ect desi gn si de sl opes, f r om t he i nt er sect i on of t he over dept h dr edgi ng l i mi t ( at a poi nt l ocat ed ver t i cal l y bel ow t he l i mi t of dr edgi ng at t he t op of s l ope) . The amount of mat er i al excavat ed f r om si de sl opes wi l l be det er mi ned by ei t her cr oss- sect i ons or comput er , or bot h.

c. The Cont r act or shal l exer ci se car e i n dr edgi ng al ong t he si de sl opes near whar f s, docks, and pi er s so as not t o over dr edge t o such an ext ent as t o under mi ne t he st r uct ur es or i n any way i mpai r t he st abi l i t y of such st r uct ur es.

3. 5. 3 Excessi ve Dr edgi ng

Mat er i al t aken f r om beyond t he l i mi t s, as speci f i ed above under subpar agr aphs " Al l owabl e Over dept h" and " Si de Sl opes" , wi l l be deduct ed f r om t he t ot al amount dr edged as excessi ve over dept h dr edgi ng, or excessi ve s i de- sl ope dr edgi ng f or whi ch payment wi l l not be made.

3. 6 CONTRACTOR QUALI TY CONTROL

a. The Cont r act or shal l pr epar e, mai nt ai n, and submi t f or appr oval a Dai l y Repor t of Oper at i ons usi ng Eng For m No. 4267 ( Mechani cal Dr edgi ng) , and shal l pr ovi de t he Cont r act i ng Of f i cer wi t h s i gned copi es t her eof wi t h t he Dai l y Qual i t y Cont r ol Repor t s as r equi r ed i n Sect i on 01 45 00 QUALI TY CONTROL. A copy of t he f or m used f or Repor t of Oper at i ons i s at t ached at t he end of Sect i on 01 45 00 QUALI TY

CONTROL.

b. I n addi t i on t o t he dai l y r epor t ( s) , t he Cont r act or shal l pr epar e a Mont hl y Repor t of Oper at i ons f or each mont h or par t i al mont h' s wor k on ENG For m No. 4267 ( Mechani cal Dr edgi ng) . The mont hl y r epor t ( s) shal l be submi t t ed t o t he Cont r act i ng Of f i cer on or bef or e t he 7t h of each

SECTI ON 35 20 23 Page 15 mont h, consol i dat i ng t he pr evi ous mont h' s wor k. Upon compl et i on of t he pr oj ect , t he Cont r act or shal l submi t a consol i dat ed pr oj ect r epor t , combi ni ng t he mont hl y r epor t s.

c. Addi t i onal l y, one copy of t he r epor t s shal l be mai nt ai ned by t he Cont r act or on each dr edge f or t he Cont r act i ng Of f i cer ' s i nspect i on pur…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .