This document is a draft summary report of a lead-containing paint survey conducted at various U.S. Army Corps of Engineers locations in the Upper Connecticut River Basin, including Otter Brook Lake. The survey identified nine structures and one bridge at Otter Brook Lake that contained lead-based paint, with a total of 139 X-ray fluorescence readings taken. Components testing positive for lead-based paint at each structure are listed, along with quantity, condition, substrate, color, and highest measured lead concentration. A photo log of each lead-based paint component is also provided in the appendix.

The related federal contract opportunity is a solicitation from the Department of the Army Corps of Engineers Engineering District New England for rehabilitation of the exterior of buildings at the Maintenance Building and Garage at Otter Brook Lake in Keene, New Hampshire. The work will address lead-based paint identified in the survey report. Response and award dates, pricing terms, and other solicitation details are not provided.

View the file

Other files

File Type Posted
Amendment W912WJ23Q0137-0001.pdf PDF
Attachments.pdf PDF
Solicitation W912WJ23Q0137.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIENT DRAFT SUMMARY REPORT

LEAD-CONTAINING PAINT SURVEYS

U.S. Army Corps of Engineers (USACE) Upper Connecticut River Basin | Various Locations

© 2017, Mabbett & Associates, Inc. 1 February 2017 Contract No. W912WJ-16-D-0004 TO#0003 APPENDIX B – OTTER BROOK LAKE Project No. R7063003.000.001 US Army Upper CT River Basin Lead Survey Report - FINAL DRAFT

Appendix B

Otter Brook Lake LCP Inventory & Photo Log

Contract No. W912WJ-16-D-0004 TO#0003 APPENDIX B – OTTER BROOK LAKE LCP INVENTORY

Otter Brook Lake On November 7, 2016, a limited LCP survey was performed at the Otter Brook Lake location (Project office at 480 Branch Road, Keene, NH 03431). During this survey nine (9) structures and one (1) bridge were surveyed and a total of 139 XRF readings were taken, including calibration checks. Building components testing positive for LCP are provided in the inventory below, along with their quantity, condition, substrate, color, and highest measured lead concentration. A photo log of each LCP component is also provided in this Appendix.

LCP Inventory Otter Brook Lake

Project Office - 480 Branch Road, Keene, NH 03431

Sample # Building BLD

# Component Substrate Condition Color

XRF

Result (mg/cm2)

2nd XRF Result

(mg/cm2) Quantity Unit

OB1-01 Gate House 8 Steel Bridge

Beam Metal Damaged Gray <9.9 1.0 EA

OB1-02 Gate House 8 Bridge Railing Metal Intact Silver 2.2 1.0 EA

OB1-03 Gate House 8 Extension Plate Metal Damaged Silver 2.3 18.0 LF

OB1-04 Gate House 8 Door Frame Metal Intact Green 1.0 34 LF

OB1-06 Gate House 8 Door Threshold Metal Damaged Green 1.8 14.5 LF

OB1-11 Gate House 8 Hatch Casing Metal Damaged Yellow 1.0 8.3 LF

OB1-12 Gate House 8 Railings Metal Intact Gray 3.4 1.0 EA

OB1-14 Gate House 8 Motor Lower

Level Metal Intact Green 1.0 1.0 EA

OB1-15 Gate House 8 Hydraulic

Reservoir Metal Intact Black 1.0 10.0 LF

OB1-18 Gate House 8 Hydraulic Pipes Metal Intact Dark

Beige 9.6 1.0 EA

OB2-04 Upper Annex 9 Window Bars Metal Intact Red 0.4 10.0 LF

OB2-06 Upper Annex 9 Interior Door Metal Intact Red 0.4 18.0 LF

OB2-07 Upper Annex 9 Trash Can Metal Damaged Green 0.4 9.0 LF

OB3-02 Project Office 10 Garage Door

Frame Wood Intact White 3.4 24.5 LF

OB3-03 Project Office 10 Old Window

Frame Wood Intact White 3.8 3.5 11.0 LF

OB3-04 Project Office 10 Old Window Sash Wood Intact White 1.1 4.3 LF

OB3-05 Project Office 10 Front Door

Header Wood Intact White 0.7 6.0 LF

OB3-06 Project Office 10

Side of Front Door Frame

Wood Intact White 1.0 14.5 LF

Contract No. W912WJ-16-D-0004 TO#0003 APPENDIX B – OTTER BROOK LAKE LCP INVENTORY Project No. R7063003.000.001 US Army Upper CT River Basin Lead Survey Report - FINAL DRAFT

LCP Inventory Otter Brook Lake

Project Office - 480 Branch Road, Keene, NH 03431

Sample # Building BLD

# Component Substrate Condition Color

XRF

Result (mg/cm2)

2nd XRF Result

(mg/cm2) Quantity Unit

OB3-08 Project Office 10 Bathroom Ext

Door Frame Wood Intact White 1.0 20.0 LF

OB3-13 Project Office 10 Fascia Wood Intact White 1.5 1.0 EA

OB3-15 Project Office 10 Attic Door Wood Intact Green 1.0 18.0 LF

OB3-18 Project Office 10 Wainscot Wood Intact Beige 1.0 1.0 EA

OB3-19 Project Office 10 Interior Window Wood Intact Beige 1.0 8.5 LF

OB3-22 Project Office 10 Sink Vanity Wood Intact Blue 1.0 7.0 LF

OB3-23 Project Office 10 Work Bench Wood Intact Teal 0.4 29.0 LF

OB3-24 Project Office 10 Door Trim Wood Intact Beige 1.0 17.5 LF

OB3-26 Project Office 10 Door-Paint

Locker Metal Intact Beige 1.0 18.0 LF

OB3-27 Project Office 10 Door Frame-

Paint Locker Metal Intact Gray 1.0 18.3 LF

OB4-01 House 11 Siding Wood Intact White 1.9 0.7 1.0 EA

OB4-02 House 11 Soffit Wood Intact White 8.9 9.0 LF

OB4-03 House 11 Fascia Wood Intact White 1.0 1.0 EA

OB4-04 House 11 Siding Wood Intact White 1.7 1546 SQFT

OB4-05 House 11 Ext Window Frame Wood Damaged White 2.8 9.0 LF

OB4-06 House 11 Ext Door Wood Damaged Green > 9.9 18.0 LF

OB4-07 House 11 Ext Door Frame Wood Intact White 2.6 3.9 19.0 LF

OB4-12 House 11 Int. Door Frame Wood Intact White > 9.9 18.5 LF

OB4-15 House 11 Stair Stringer Wood Intact White > 9.9 1.0 EA

OB4-17 House 11 Attic Door Wood Intact White 9.6 16.3 LF

OB4-18 House 11 Stair Trim Wood Intact White > 9.9 1.0 EA

OB4-19 House 11 Built in Shelf Wood Intact White > 9.9 15.0 LF

OB5-05 Lower Annex 12 Soffit Wood Damaged White 1.0 16.0 LF

OB6-02 Boat Annex 13 Int. Window Sash Wood Intact White 4.1 2.0 LF

OB6-03 Boat Annex 13 Int. Window Sash Wood Intact White 3.1 2.0 LF

OB6-05 Boat Annex 13 Upper Frame

Garage Door Metal Intact White 3.6 8.5 LF

Contract No. W912WJ-16-D-0004 TO#0003 APPENDIX B – OTTER BROOK LAKE PHOTO LOG

Otter Brook Lake – Photo Log of LCP Components

Garage Door Frame (OB3-02) Old Window Frame (OB3-03)

Old Window Sash (OB3-04) Front Door Header (OB3-05) & Frame (OB3-06)

Bath Ext Door Frame (OB3-08) Fascia (OB3-13)

Attic Door (OB3-15) Wainscot (OB3-18)

Interior Window (OB3-19) Sink Vanity (OB3-22)

Work Bench (OB3-23) Door Trim (OB3-24)

Paint Locker Door (OB3-26) & Frame (OB3-27) Siding-B-Side (OB4-01)

Soffit (OB4-02) & Fascia (OB4-03) Exterior Window Frame (OB4-05)

Exterior Wooden Green Door (OB4-06) Ext Wood Door Frame (OB4-07) & Siding (OB4-04

US Army Upper CT River Basin Lad Survey Report - FINAL DRAFT 18
US Army Upper CT River Basin Lad Survey Report - FINAL DRAFT 19
US Army Upper CT River Basin Lad Survey Report - FINAL DRAFT 20
US Army Upper CT River Basin Lad Survey Report - FINAL DRAFT 23
US Army Upper CT River Basin Lad Survey Report - FINAL DRAFT 24
US Army Upper CT River Basin Lad Survey Report - FINAL DRAFT 25

File details come from the government source that posted it. Updated .