Solicitation W912WJ23Q0137.pdf

PDF 834 KB Posted

Attached to
Maintenance Building and Garage Exterior Rehabilitation, Otter Brook Lake, Keene, NH
Solicitation number
W912WJ23Q0137
Issued by

About this file

This request for quotations from the U.S. Army Corps of Engineers Engineering District New England solicits quotes for the exterior rehabilitation of the maintenance building and lower garage at Otter Brook Lake in Keene, New Hampshire. The scope of work includes removing degraded siding, windows, and roofing materials containing lead paint from both structures and installing new rigid siding, windows, architectural asphalt shingles, and PVC trim. Quotes are due by close of business on September 1, 2023. The contractor must furnish all labor, materials, and equipment to complete the work within 90 days of receiving a notice to proceed and coordinate schedule with the government. Safety, insurance, and other standard contract requirements also apply.

View the file

Other files

File Type Posted
Otter Brook Lake Lead Survey.pdf PDF
Amendment W912WJ23Q0137-0001.pdf PDF
Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OTTER BROOK LAKE PROJ OF

MICHAEL SERVANT

480 BRANCH ROAD

KEENE NH 03431-9801

TEL: 978-318-8300 FAX:

SEE SCHEDULE

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ23Q0137 18-Aug-2023 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

01-Sep-2023(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8324JENNIFER M SAMELA

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ23Q0137

Section B - Supplies or Services and Prices

INSTRUCTIONS TO VENDORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or

JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT

WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE ATTENTION OF

JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

**QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT

JENNIFER.M.SAMELA@USACE.ARMY.MIL.

NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 3:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company names:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration

(CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business Unique Entity Identifier (UEI): _______________________________

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE

ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Maintenance Building Exterior Rehab

FFP

Contractor shall furnish all labor, materials, and equipment necessary to rehabilitate the exterior of the Maintenance Building at Otter Brook Lake, Keene, NH in accordance with the Statement of Work.

FOB: Destination

PURCHASE REQUEST NUMBER: W13G86319548120001

PSC CD: Y1QA

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Lower Garage Exterior Rehab

FFP

Contractor shall furnish all labor, materials, and equipment necessary to rehabilitate the exterior of the Lower Garage at Otter Brook Lake, Keene, NH in accordance with the Statement of Work.

FOB: Destination

PURCHASE REQUEST NUMBER: W13G86319548120002

PSC CD: Y1QA

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

MAINTENANCE BUILDING AND LOWER GARAGE EXTERIOR REHAB

U.S. ARMY CORPS OF ENGINEERS

OTTER BROOK LAKE

KEENE, NH

STATEMENT OF WORK

I. General:

1. Scope – Furnish all labor, materials, and equipment necessary to rehabilitate the exterior of the Maintenance Building (69’ x 33’) and Lower Garage (26 x 26’) single story buildings at Otter Brook Lake.

a. Maintenance Building: Remove and dispose of degraded vinyl siding, clapboards and windows containing lead paint and install rigid siding, windows, and PVC exterior trim.

b. Lower Garage: Remove existing roofing material, clapboards, windows and install architectural asphalt shingles, rigid siding, windows, and PVC exterior trim.

2. Location – Otter Brook Lake is located at 480 Branch Road, Keene, New Hampshire, 03431.

3. Site Visit – Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact (TPOC) for the project is Park Ranger Michael Servant, 978-318-8300 or michael.e.servant@usace.army.mil

4. Schedule – The work shall commence within 15 days from the receipt of the Notice to Proceed, proceed diligently, and be completed no later than 90 days from the Notice to Proceed. The Contractor will coordinate with the Government for the estimated start date.

Work shall be performed Monday through Friday 7:00 AM to 3:30 PM unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays. All submittals to include safety and product submittals shall be submitted, reviewed, and accepted within 30 days of Notice to Proceed.

5. Safety Requirements – All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

a. Accident Prevention Plan:

The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below.

A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.

A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Weekly safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

b. Activity Hazard Analysis (AHA):

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work.

The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

c. Emergency Response:

Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.

d. Required Personnel:

The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.

In addition, when emergency medical services are not accessible within five (5) minutes of the work location and there are two (2) or more workers onsite, at least two (2) employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.

*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Statement of Work, based on the characteristics of the project*

e. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.

The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.

6. Fall Protection:

a. General: The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1-1, Section 21.

b. Submittals: A site-specific Fall Protection and Prevention Plan is required to be submitted and approved by the Government Designated Authority (GDA) prior to any work being completed at heights. USACE will provide a non-mandatory, fillable template plan. However, the contractor is permitted to submit their own plan, at a minimum it must address the items listed in EM 385-1-1, Section 21.D.01:

i. Duties and responsibilities. Identify CPs and QPs and their responsibilities and qualifications;

ii. Description of the project or task performed;

iii. Training requirements to include safe use of fall protection equipment;

iv. Anticipated hazards and fall hazard prevention and control;

v. Location of anticipated anchorages that will be installed during the project;

vi. Rescue plan and procedures;

vii. Design of anchorages/fall arrest and horizontal lifeline systems:

viii. Inspection, maintenance, and storage of fall protection equipment;

ix. Incident investigation procedures;

x. Evaluation of program effectiveness;

xi. Inspection and oversight methods employed

c. NOTE: It is realized that means of fall protection for the first person establishing anchorages can be difficult. In this situation, fall protection may not be required while the individual is installing the initial anchorage point. Once this is installed, fall protection is required. These activities need to be addressed in the AHA and Fall Protection and Prevention Plan.

d. Competent Person (CP): The person designated in writing by the employer to be responsible for immediate supervising, implementing, and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards. The CP shall:

i. Be onsite at all times while work at height is being performed;

ii. Be trained in accordance with EM 385-1-1, Section 21.C.04, to include a minimum of 24 hour CP in fall protection training made up of classroom and practical hands-on components.

iii. Prepare, update, review and approve fall protection and prevention plans;

iv. Review procedures as workplace activities change to determine if additional practices, procedures, or training need to be implemented;

v. Supervise the selection, installation, use and inspection of non-certified anchorages;

vi. Verify End Users who work at heights are trained and authorized to do so;

vii. Inspect fall protection equipment at the frequency required by the manufacturer and

EM 385-1-1.

e. Qualified Person (QP): A person with a recognized degree, or professional certificate, with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, evaluating and specifying fall protection and rescue systems. The QP shall:

i. Be trained to the applicable level, as described in EM 385-1-1, Section 21.C.03;

ii. Provide technical support for the fall protection program;

iii. Have advanced understanding and knowledge of the requirements, equipment, systems, physical sciences, and engineering principles that affect fall protection and rescue systems;

iv. Supervise the design, selection, installation and inspection of certified anchorages and horizontal lifelines;

v. Be qualified to select proper fall protection and rescue equipment;

NOTE: CPs may only approve non-certified anchorages that are capable of holding 5000 lbs. All other anchorages and horizontal lifelines must be certified by a QP

f. End User: A person who has been trained and authorized by the employer on the use of assigned fall protection equipment in a typical fall hazard situation. They must have an understanding of workplace activities and follow the policy, procedures, and instructions of the Competent Person regarding the use of fall protection, rescue systems, and related equipment. They shall:

i. Be trained by a CP in accordance with EM 385-1-1, Section 21.C.05, to include hands-on training and practical demonstrations

ii. Bring all unsafe or hazardous conditions or actions that may cause injury to them or others, to the attention of the CP;

iii. Properly use, inspect, maintain, store and care for their fall protection equipment and systems;

iv. Inspect all fall protection equipment or damage or defects, prior to each use.

v. Understand the nature of fall hazards in the work area and how to properly mitigate them;

vi. Calculate free fall distances and clearance requirements of fall protection systems;

vii. Understand the site-specific rescue procedures;

g. Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems. A PFAS consist of a full body harness, connecting means, and an anchorage system. General this equipment is certified for users within the capacity range of 130 to 310 lbs, including the weight of the worker, equipment, and tools. A CP shall inspect the equipment at least once semi-annually and whenever the equipment is subject to a fall or impact.

i. Full body harnesses shall meet the requirements of ANSI Z359 and be used in accordance with EM 385-1-1, Section 21.I.06. Body belts and full body harnesses meeting only the requirements of the ANSI A10.14 shall not be used. All full body harnesses shall be equipped with Suspension Trauma Preventers such as stirrups, relief steps, or similar in order to provide short-term relief from the effects of orthostatic intolerance.

ii. All energy free fall energy absorbing lanyards shall meet the requirements of ANSI Z359.13 and be used in accordance with EM 385-1-1, Section 21.I.07.

NOTE: When an anchor point is below the dorsal D-ring, a free fall (FF) distance greater than 6 ft (1.8 m) is created. For these situations, a 12 ft (3.6 m) FF energy absorbing lanyard shall be used in accordance with manufacturer’s instructions and recommendations. A 12 ft (3.6 m) FF energy absorbing lanyard does not refer to the lanyard length. Instead, it refers to a FF that is greater than 6 ft (1.8 m) up to 12 ft which is created by the anchor point being located below the dorsal D-ring. The maximum length of the lanyard used shall not exceed 6 ft. (See Figure 21-4 in the EM 385-1-1.

Self-Retracting Devices (SRDs) shall meet the requirements of the ANSI/ASSE Z359.14 standard and be used in accordance with EM 385-1-1, Section 21.I.07.d

All scaffolding, aerial work platforms, scissor lifts, or similar must be used in accordance with EM 385-1-1, Section 22.

7. Lead Based Paint Abatement:

a. General: The requirements of this section are applicable to contracts involving activities that disturb Lead-based paint (LBP). All LBP activities, training, and submittals shall comply with EM 385-1-1, Section 06.C; 29 CFR 1910.1025; 29 CFR 1926.62; as well as State, and local requirements.

b. Submittals: A site-specific Lead Compliance Plan is required to be submitted and accepted by the Technical Point of Contact (TPOC) prior to initiating lead abatement tasks. This plan shall be developed as an appendix to the Accident Prevention Plan (APP) and describe procedures to be followed to protect contractor and government employees, the environment, and general public from lead hazards while performing lead hazard control activities. Specifically, the Lead Compliance Plan shall address the following:

i. A description of each work activity in which lead is emitted, to include equipment and materials used, controls in place, crew size, job responsibilities, operating procedures, and maintenance practices, work activity locations and lead-containing components keyed to the project drawings;

ii. Description of means to be used to achieve exposure compliance, including any engineering controls;

iii. Employee exposure assessment procedures to monitor and document employee lead exposure. Exposure monitoring shall include two types:

1) Initial determination (may be omitted if there is sufficient objective/historical data showing action level compliance according to the requirements); and

2) Continued exposure monitoring required as a result of initial exposure determinations.

iv. Protective clothing, housekeeping procedures to prevent spread of lead contamination both in and beyond the lead hazard control area, and hygiene facilities and practices to prevent employees from inadvertent ingestion of lead;

v. Administrative controls to limit employee exposure to lead, including employee rotation schedule to be employed, if engineering controls or Personal Protection Equipment (PPE) fail to eliminate exposures exceeding the Permissible Exposure Limit (PEL);

vi. Medical surveillance procedures to monitor employee exposures and ensure fitness for wearing respiratory protection;

vii. Competent person (CP) and employee training required;

viii. Detailed sketches identifying lead hazard control areas, including decontamination areas and facilities, critical barriers, and physical and air distribution boundaries;

ix. Perimeter or other area air monitoring outside or adjacent to the regulated area;

x. Security required for each lead hazard control area; and

xi. Waste generation, characterization, transportation, and disposal (including recordkeeping).

c. Required Certifications and Licenses:

i. The contractor must be licensed in lead abatement by the Environmental Protection Agency (EPA) or applicable state where the work will be completed.

ii. At least one onsite employee will be designated as the lead abatement competent person and be certified as a Lead Abatement Supervisor by the EPA or applicable state where the work will be completed.

iii. At a minimum, site workers involved with lead abatement activities must be certified as Lead Abatement Workers by the EPA or applicable state where the work will be completed.

iv. Copies of certificates and licenses shall be kept on site and available for review if requested by the Technical Point of Contact.

d. Final Clearance Sampling: For interior lead abatement projects, a 3rd party, independent clearance examiner must assess the areas impacted by the abatement activities. The examiner must be a Certified Industrial Hygienist (CIH), Certified Risk Assessor, or a Certified Lead-Based Paint Inspector.

i. Clearance sampling shall be completed in accordance with ASTM E1728 and

ASTM E3074. Samples must be analyzed by a laboratory recognized by the EPA’s National Lead Laboratory Accreditation Program (NLLAP).

ii. Specific Clearances must meet the following

1. Floors <40 µg/sq. ft

2. Window sill <250 µg/sq. ft

3. Window well <400 µg/sq. ft 4.

8. Asbestos Abatement (if required if tar paper found under clapboards)

a. Specific Safety Section – Asbestos Abatement

i. General: The requirements of this section are applicable to contracts involving activities that disturb Asbestos-Containing Materials . All Asbestos- Containing Materials activities, training, and submittals shall comply with Occupational Health and Safety Administration (OSHA) Class II work practices, the EM 385-1-1, Section 06.C; 29 CFR 1910.1001; 29 CFR 1926.1101; CFR 61, Subpart A and M; as well as State, and local requirements.

ii. Submittals: A site-specific Asbestos Abatement Plan is required to be submitted and accepted by the Technical Point of Contact prior to initiating asbestos abatement tasks. This plan shall be developed as an appendix to the Accident Prevention Plan and describe procedures to be followed to protect employees and the environment from asbestos hazards while performing work that will disturb Asbestos-Containing Materials. Specifically, the Asbestos Abatement Plan shall address the following:

1) A description of each activity where asbestos will be disturbed, including

OSHA class of work, equipment required, controls to be used, crew size, job responsibilities, maintenance practices, and locations keyed to project drawings;

2) The method of notification of other employers at the worksite;

3) A description of regulated areas, types of containment, decontamination unit plan, and engineering controls;

4) Air monitoring plan – Perform air sampling for personal, area and clearance monitoring in accordance with 29 CFR 1910.1101 and EM 385- 1-1 Section 06.C. The plan shall include the number of samples to be collected, analytical method to be used, and sample turnaround time.

Submit the name, address, and telephone number of the testing laboratory selected for the analysis and reporting of airborne concentrations for asbestos fibers along with documentation of the American Industrial Hygiene Association (AIHA) accredited laboratory. Breathing zone air samples must be taken for at least 25% of the workers in each shift, or a minimum of two, whichever is greater. Air sampling must be representative of the 8-hour time weighted average (TWA) and 30-minute short term exposure of each employee. Employees must be notified of the sample results no later than 5 working days after the beginning of abatement activities. The testing laboratory must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.

5) Personal Protection Equipment (PPE), including respirators and clothing;

6) Housekeeping procedures to prevent the spread of contamination and dust, both in and beyond the regulated area;

7) Hygiene facilities and practices;

8) Competent Persons and employee training required;

9) Medical surveillance, as required, to assess exposure and to monitor employee fitness to perform work tasks while wearing PPE (to include respiratory protection devices);

10) Waste generation, containerization, transportation, and disposal (including recordkeeping); and

11) Security, fire, and medical emergency response procedures.

iii. Required Certifications and Licenses:

1) The contractor must hold a current asbestos abatement license, for the applicable state where the work will be completed.

2) At least one onsite employee will be designated as the Asbestos Competent Person and hold a current Asbestos Abatement Supervisor Certification, for the applicable state where the work will be completed.

3) At a minimum, site workers must hold a current Asbestos Abatement Worker Certificates, for the applicable state where the work will be completed.

4) Copies of certificates and licenses shall be kept on site and available for review if requested by the Technical Point of Contact.

9. Pre-Construction Conference – Prior to the start of any work, the Technical Point of

Contact will schedule and conduct a “Pre-Construction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Construction Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor’s Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis (Submitted & accepted prior to start of work on site)

iv. Fall Protection and Prevention Plan IAW EM 385-1-1, Section 21

v. Safety Meetings (Documented on NED Form 251)

vi. Accident Reporting (ENG Form 3394)

vii. Safety Data Sheet (SDS) requirements

viii. Contractor’s Equipment

ix. Correspondence, Communication, Security and Administrative Procedures.

x. Invoice and payment.

10. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

11. Security – The contractor will comply with all established security policies at Otter Brook Lake. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hours’ notice of any such closure.

12. Payment – After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.

For jobs greater than 30 days the contractor may request progress payment.

All invoices may be mailed to:

U.S. Army Corps of Engineers Otter Brook Lake

480 Branch Road Keene, NH 03431

Or Emailed to michael.e.servant@usace.army.mil and Christie.l.baker@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary – Furnish all labor, materials, and equipment necessary to rehabilitate the exterior of the Maintenance Building (69’ x 33’) and Lower Garage (26 x 26’) single story buildings at Otter Brook Lake.

a. Maintenance Building: Remove and dispose of degraded vinyl siding, clapboards and windows containing lead paint and install rigid siding, windows, and PVC exterior trim.

b. Lower Garage: Remove existing roofing material, clapboards, windows and install architectural asphalt shingles, rigid siding, windows, and PVC exterior trim.

2. Submittals – Although the Government technically reviews submissions required by this Statement of Work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government All submittals to include safety and product submittals shall be submitted, reviewed, and accepted within 30 days of Notice to Proceed. Submittals must be accepted prior to the commencement of any field activities.

Accident Prevention Plan Activity Hazard Analysis OSHA 10 Certification CPR & First Aid Certification Fall Protection and Prevention Plan (if applicable) Lead Compliance Plan and associated licenses/certifications Manufacturer’s product documentation for windows, vinyl siding, and roofing system (installation instructions, warranty, etc.)

Warranty information Documentation of proper disposal of lead paint

3. Existing Conditions:

a. Maintenance Building: The building is a residential-style single-story building that is approximately 69 ft x 33 ft with a total of 12 (twelve) windows. Vinyl siding at the Otter Brook office was replaced in 2011 over the original clapboards. A Lead Containing Paint (LCP) survey identified multiple areas containing LCP on this structure. Due to this, the clapboards, and trim shall be removed and properly disposed of as LCP materials.

Replacement windows were installed in 1996 and need upgrading due to mechanical wear and to increase energy efficiency. Under the clapboards may be tar paper containing asbestos. Any tar paper under the clapboards shall be assumed to contain asbestos and will remain undisturbed and covered with a quality house wrap.

b. Lower Garage: This building is a 26’ x 26’ single story garage building with 2 (two) windows. The current siding, windows and roofing are in poor condition and in need of replacing. A LCP survey identified the building soffit as containing LCP. Under the clapboards may be tar paper containing asbestos. Any tar paper under the clapboards shall be assumed to contain asbestos and will remain undisturbed and covered with a quality house wrap.

Note: LCP Reports may be provided upon request.

4. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

5. Clean Up and Waste Disposal – The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.

6. Environmental Protection – Containers for excess and/ or waste materials, rubbish, etc.

shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.

7. Sustainability & Environmentally Preferred Products – Under the Comprehensive

Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products.

Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level

8. Building Protection – Any involved building or structure, and all of its contents shall be protected from the elements during the duration of this contract. The contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather related event that could cause damage to the building and or any of its contents during all phases of this contract.

9. Personal Protective Equipment - It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

10. Government Resources – The government will supply any electricity necessary for the project work from points of existing outlets when available. The contractor shall carefully conserve the use of electricity provided. The contractor shall supply his own means of communication (telephone). There is a restroom and potable water available at the contract site.

11. Damage to Government and Private Property – The contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the contractor’s operation. The contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

12. Contractor’s Personnel –

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

b. Employee Conduct - The Contractor shall be responsible for seeing that the firm’s employees strictly comply with the Code of Federal Regulations Title 36, Chapter III, Part 327, and all federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor’s Employees - The Technical Point of Contact may require the

Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

13. Omissions – This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

14. Quality Assurance – The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

16. Receiving and Storing Materials – The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.

Part 2 Products:

All products shall be new, unused and to the satisfaction of the TPOC. Products shall be approved by the TPOC prior to installation. In addition, construction material shall be produced domestically or manufactured domestically in accordance with the Buy American Act.

1. Windows

a. Maintenance Building

1. Seven (7) new construction windows 30 ¾” x 52 ½” Windows, one (1) 30 ¾” x 36

¾”, four (4) 32” x 56 ½”

2. White in Color

3. 5/8” contoured internal grilles

4. 3” casing

5. 0.30 U Factor

6. Built in J-Channel

i. Each window trim will include an apron, stool, and window stop replacement

ii. Each window will be insulated with window spray foam insulation

iii. 3” PVC clamshell exterior molding, pre primed white

b. Lower Garage

1. Two (2) new construction 33 ½” x 39 ¾” Windows

2. White in Color

3. 5/8” contoured internal grilles

4. 3” casing

5. Built in J-Channel

i. Each window trim will include an apron, stool, and window stop replacement

ii. Each window will be insulated with window spray foam insulation

iii. 3” PVC clamshell exterior molding, pre primed white

2. Roofing

a. Lower Garage

1. Architectural asphalt shingles (matching existing lower garage shingle color)

2. Install high temperature ice and water shield 6’ up from the eaves

3. Install synthetic underlayment on remaining areas

4. Install matching metal drip edge, rake edges and ridge cap

5. 26’ ridge vent with cap installed

3. Vinyl Siding

a. Maintenance Building

1. White in color

2. Textured wood grain surface

3. Insulated D4 vinyl siding .044 thick

4. 5/8” J-channel

5. Synthetic House wrap system including seam and flashing tape

6. Gable Vents

7. Electrical Blocks for lighting

8. Soffit, fascia, garage door, door trim in PVC trim material

1. White in color

2. Textured wood grain surface

3. Non-Insulated D4 vinyl siding .044 thick

4. 5/8” J-channel

5. Synthetic House wrap system including seam and flashing tape

6. Soffit, fascia, garage door in PVC trim material

4. Miscellaneous Materials

The contractor shall supply all other necessary materials to properly execute the contract

Part 3 Execution:

1. Demolition:

The contractor shall remove and legally dispose of the existing material and equipment identified below in accordance with all federal, state, and local laws and regulations.

a. Maintenance Building:

1. The existing vinyl siding, clapboards (and tar paper if present), facia, soffit, exterior trim

2. All existing exterior wood trim containing lead paint.

3. All existing windows

1. The existing roofing material to include roof shingles, ice belt, roof underlayment

2. The existing clapboards (and tar paper if present), facia, soffit, rake boards and flashing.

3. All existing exterior wood trim

4. All existing windows

Note: Documentation of proper disposal shall be provided by the contractor and the facility where lead paint containing demolition debris is taken for disposal. If tar paper is present under clapboards, documentation of proper disposal shall be provided by the contractor and the facility where asbestos containing materials are taken for disposal.

2. Installation:

The contractor shall install all materials and equipment in accordance with the applicable codes, the manufacturer’s specifications and in a manner that is consistent with the industry standards for each applicable trade.

a. Maintenance Building:

1. Windows

i. Windows will be fitted as to not allow any gaps between mounting surfaces and windows

ii. Trim will be replaced to include replacement of the window stop, apron, stool, and interior stop

iii. Windows will be insulated with a spray foam insulation designed for windows to ensure there is no air draft

iv. All trim will be neatly installed to not leave any gaps between trim pieces or walls

v. The use of a silicone caulking or similar sealant is to be used to ensure an airtight seal on all windows

vi. Any nail holes will be filled with wood filler to provide a smooth surface for paint and stain

2. Insulated Vinyl siding

i. Quality synthetic house wrap system including seam and flashing tape shall be installed prior to new vinyl siding.

ii. Replace all vinyl siding and necessary flashing to provide a professional appearance and waterproof shell.

iii. Contractor shall not install damaged materials or equipment.

1. Windows

i. Windows will be fitted as to not allow any gaps between mounting surfaces and windows

ii. Trim will be replaced to include replacement of the window stop, apron, stool, and interior stop

iii. Windows will be insulated with a spray foam insulation designed for windows to ensure there is no air draft

iv. All trim will be neatly installed to not leave any gaps between trim pieces or walls

v. The use of a silicone caulking or similar sealant is to be used to ensure an airtight seal on all windows

vi. Any nail holes will be filled with wood filler to provide a smooth surface for paint and stain.

2. Vinyl siding

i. Synthetic house wrap system including seam and flashing tape shall be installed prior to new vinyl siding.

ii. Replace all vinyl siding and necessary flashing to provide a professional appearance and waterproof shell.

iii. Contractor shall not install damaged materials or equipment.

3. Roofing

i. Install high temperature ice and water shield 6’ up from the eaves

ii. Install synthetic underlayment on remaining areas

iii. Install matching metal drip edge and rake edges

iv. Ridge cap to be installed with prefabricated matching ridge cap

v. Architectural asphalt shingles shall be installed on the entire roof (Matching existing lower garage shingle color) per manufacturer’s recommendation

ATTACHMENTS

PLEASE REFER TO THE ATTACHMENTS INCLUDED WITH THIS SOLICIATION FOR ADDITIONAL

INFORMATION

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 90 dys. ANP 1 OTTER BROOK LAKE PROJ OF

MICHAEL SERVANT

480 BRANCH ROAD

KEENE NH 03431-9801

978-318-8300 FOB: Destination

961405

0002 90 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination 961405

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations.