BHD GH Roof Replacement Plan.pdf

PDF 694 KB Posted

Attached to
Gatehouse Masonry Waterproofing, Birch Hill Dam, Royalston, MA
Solicitation number
W912WJ23Q0111
Issued by

About this file

This package includes construction drawings and specifications for a roof replacement project at Birch Hill Dam gatehouse in Royalston, Massachusetts. The project involves removing the existing 60-mil EPDM roof membrane and insulation down to the concrete deck, installing a new fully adhered 60-mil EPDM membrane with tapered insulation, adding new roof drains and walk pads, and reinstalling the lightning protection system. Drawing A-101 shows the roof plan with dimensions and notes. Drawing A-102 provides section and detail views of the new roofing system installation at scuppers, drains, seams and other elements. Specifications require verifying all dimensions, safely accessing the roof, and fully adhering the new membrane in accordance with the drawings and specifications.

The related federal contract opportunity is solicitation number W912WJ23Q0111 for gatehouse masonry waterproofing at Birch Hill Dam in Royalston, Massachusetts, issued by the Department of the Army Corps of Engineers New England District. The solicitation involves the roof replacement project shown in the construction drawings.

View the file

Other files

File Type Posted
Amendment W912WJ23Q0111-0002.pdf PDF
BHD GH Roof Plan.pdf PDF
Amendment W912WJ23Q0111-0001.pdf PDF
Solicitation W912WJ23Q0111.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

SHEET

IDENTIFICATION

NUMBER

US ARMY CORPS

OF ENGINEERS

D A

T E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E

P L

O T

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T

N O

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL

OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET

APPROVED FOR TECHNICAL ADEQUACY BY:

TECHNICAL LEAD ENGINEER DATE

DATE

DATE

DATE

DATE

APPROVED BY:

APPROVAL RECOMMENDED BY:

CHIEF, ENGINEERING / PLANNING DIVISION

VICINITY MAP

NOT TO SCALE

NOT TO SCALE

LOCATION PLAN

This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.

COVER SHEET

BHDT102.S03

BHRP101.S02

RRSGBS.DGN

DESIGN FILESHEET NO.

G-001

A-101

A-1023

INDEX TO DRAWINGS

SHEET TITLE

G-001

NEW ENGLAND

DISTRICT

U

S

A R

M Y

E N

G

IN

E E

R D

IS

T

R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N C

O R

D M

A S

S A

C H

U S

E T

T S

S

IZ

E

A N

S I

D

REVIEWED BY:

CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH

CHIEF, GEO-ENVIRONMENTAL BRANCH

REVIEWED BY:

CHIEF, DES BR / DEPUTY CHIEF, ENGINEERING/PLANNING DIVISION

C O

V E

R S

H E

E T

W A

T E

R R

E S

O U

R C

E S

D E

V E

L O

P M

E N

T P

R O

J E

C T

R E

P L

A C

E G

A T

E H

O U

S E

R O

O F

IN

G

S Y

S T

E M

B

IR

C H

H

IL

L D

A M

R O

Y A

L S

T O

N M

A

REPLACE GATEHOUSE

ROOFING SYSTEM

BIRCH HILL DAM

ROYALSTON,

MASSACUSETTS

D R

A W

IN

G

C O

D E

C O

N -B

H -4

ROOF PLAN

DETAILS

SHEET OF 3

D W

F

D W

F D

R D

D R

D

R R

S G

B S

.d g n

PROJECT

LOCATION

ATHOL

SO.

ROYALSTON

NEW HAMPSHIRE

MASSACHUSETTS

N

N

LAKE

DENNISON

N E

W B

O S

T O

N R

O A

D

G O

O D

N O

W R

O A

D

M A

IN

S

T R

E E

T

R O

Y A

L S

T O

N R

O A

D

PR

IE

ST

B

R O

O K

M

IL

L E

R S

R

IV

E R

PROJECT

LOCATION

TO BIRCH

HILL DAM

M

IL

L E

R S

R

IV

E R

RECREATION AREA

TO

LAKE DENNISON

(UNPAVED)

(U N

P A

V E

D R

O A

D

A-101

R O

O F

P L

A N

D W

F

D W

F

B H

R P

.s

D R

D

D R

D

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

SHEET

IDENTIFICATION

NUMBER

US ARMY CORPS

OF ENGINEERS

D A

T E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E

P L

O T

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T

N O

NEW ENGLAND

DISTRICT

U

S

A R

M Y

E N

G

IN

E E

R D

IS

T

R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N C

O R

D M

A S

S A

C H

U S

E T

T S

S

IZ

E

A N

S I

D

W A

T E

R R

E S

O U

R C

E S

D E

V E

L O

P M

E N

T P

R O

J E

C T

R E

P L

A C

E G

A T

E H

O U

S E

R O

O F

IN

G

S Y

S T

E M

B

IR

C H

H

IL

L D

A M

R O

Y A

L S

T O

N M

A

D R

A W

IN

G

C O

D E

C O

N -B

H -4

SHEET OF 3

SLOPE

S L

O P

E

SLOPE

S L

O P

E

SCALE : 1/4 "=1’-0"

A-1

/2

25’-2 1/2 "

S L

O P

E S

L O

P E

1/4 "/1’

1/4 "/1’

/4

/1

/4

/1

/4

/1

/4

/1

ROOF VENT TO

REMAIN AS SHOWN

ROOF VENT TO

REMAIN AS SHOWN

EXISTING FLOOD LIGHT

TO REMAIN

EXISTING FLOOD LIGHT

TO REMAIN

EXISTING LADDER

TO REMAIN AS IS.

EXISTING FLOOD LIGHT

TO REMAIN

EXISTING FLOOD LIGHT

TO REMAIN

EXISTING FLOOD LIGHT

WITH 1" ELECTRICAL

CONDUIT TO REMAIN

A-2

REMOVE AND REPLACE

EXISTING LIGHTNING

PROTECTION (TYP.)

REMOVE EXISTING 2" THICK

LAYER OF BALLAST ON EPDM

ROOF (TYP.), SAVE, AND REUSE

BIRCH HILL GATEHOUSE ROOF PLAN

1/4 " = 1’-0"

4’ 0 4’ 8’

NEW ROOF DRAIN

NEW ROOF DRAIN

NEW RUBBER WALK

PADS AS SHOWN (TYP.)

6. INSTALL NEW ROOF DRAIN PER SPEC.

REQUIREMENTS. VERIFY EXISTING

DRAIN SIZE IN THE FIELD PRIOR TO ORDERING NEW ROOF

DRAINS. SEE ROOF DRAIN DETAIL ON SHEET A-2.

7. INSTALL NEW RUBBER WALK PADS AS SHOWN PER

SPEC. REQUIREMENTS. ADHERE WALK PADS DIRECTLY

TO THE EPDM ROOFING SURFACE.

8. PLACE EXISTING STONE BALLAST SALVAGED DURING

ROOF REMOVAL AROUND ALL WALK PADS ON THE ENTIRE

ROOF SURFACE PER SPEC. REQUIREMENTS.

9. TIE NEW EPDM ROOF INTO EXISTING SCUPPER

FLASHING, SEE SCUPPER DETAILS ON SHEET A-2.

GENERAL NOTES:

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND

CONDITIONS IN THE FIELD.

2. THE ROOF SLAB IS APPROXIMATELY 20.5 FEET ABOVE FINISH

GRADE LEVEL. ACCESS TO THE ROOF BY THE EXISTING METAL LADDER

REQUIRES THE USE OF A SAFETY BELT. ACCESS TO THE LOWER END

OF THE EXISTING METAL LADDER REQUIRES THE USE OF A PORTABLE

LADDER.

3. THE EXISTING 60 MIL EPDM ROOF SYSTEM AND ALL

INSULATING MATERIAL IS TO BE REMOVED ENTIRELY PER

SPEC. REQUIREMENTS. EXISTING STONE BALLAST

IS TO BE REMOVED, SAVED, AND REUSED.

4. REMOVE EXISTING LIGHTNING PROTECTION SYSTEM

AND ANY ELECTRICAL CONDUIT ATTACHED TO EXISTING FLOOD

LIGHTS BEFORE INSTALLING NEW ROOFING MATERIALS. RE-INSTALL

LIGHTNING PROTECTION AND ELECTRICAL CONDUIT AFTER ROOFING

IS INSTALLED.DISCONNECT ELECTRICAL POWER PRIOR TO CONDUIT

REMOVAL, RECONNECT UPON COMPLETION OF WORK.

5. INSTALL NEW 60 MIL EPDM ROOF MEMBRANE

FULLY ADHERED WITH TAPERED INSULATION TO THE EXISTING 4"

CONCRETE DECK PER SPEC REQUIREMENTS. ROOF SLOPE 1/4 " = 12"

N

D W

F

D W

F D

R D

D R

D

C O

V E

R S

H E

E T

A-102

B H

D T

.s

/2

SCALE : 1 1/2 "=1’-0"

SECTION AT SCUPPER

EXISTING CONC. SLAB

LAP EDGE SEALANT

60 MIL EPDM ROOF

MEMBRANE FULLY

ADHERED

EXISTING MASONRY

TO REMAIN

EXISTING 14" X 7" ALUM.

SCUPPER TO REMAIN

NEW EPDM FLASHING TO TIE INTO

EXISTING ALUMINUM SCUPPER

2" OF RIGID

INSULATION WITH

TAPERED INSULATION

SCALE : 3"=1’-0"

R00F DRAIN DETAIL

EXISTING CONCRETE

ROOF SLAB

60 MIL ROOFING MEMBRANE

FULLY ADHERED

EXISTING DRAIN PIPE

SCALE : 3"=1’-0"

TYPICAL SEAM LAP DETAIL

60 MIL ROOFING MEMBRANE

FULLY ADHERED

LAP EDGE SEALANT

SPLICING CEMENT

60 MIL ROOFING MEMBRANE

FULLY ADHERED

TYP. TYP.

NEW CLAMPING RING

NEW DECK CLAMP

TAPERED INSULATION

FASTEN TO ROOF DECK

AS RECOMMENDED

TAPERED AND

RIGID INSULATION

FASTEN TO ROOF DECK

AS RECOMMENDED

NEW DRAIN TO FIT

EXISTING PIPE

ROOFING MEMBRANE

TO EXTEND UNDER

CLAMPING RING

SCALE : 1 1/2 "=1’-0"

2 X 6 PT WOOD

BLOCKING SECURE TO DECK

WITH 3/8 " FASTENERS @ 48"

O.C.

EXISTING CONC. SLAB

LAP EDGE SEALANT

BONDING

ADHESIVE

8"

60 MIL EPDM ROOF

MEMBRANE FULLY

NEW PARAPET DETAIL

EPDM MEMBRANE FLASHING

INSULATION WITH

TAPERED INSULATION

SCALE : 1 1/2 "=1’-0"

EXISTING CONC. SLAB

60 MIL EPDM ROOF

MEMBRANE FULLY

A-2

INSULATION WITH

TAPERED INSULATION

A-2 A-1

A-2 A-1 A-1

A-1 A-1

TERMINATION BAR WITH

SEALANT

2 3

4 5

LAP EDGE

SEALANT

STAINLESS STEEL

CLAMPING RING

PRE MOLDED EPDM MEMBRANE

PIPE BOOT FLASHING

STONE

BALLAST

STONE BALLAST

STONE BALLAST

STONE BALLAST

STONE BALLAST

NEW ROOF VENT DETAIL

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

SHEET

IDENTIFICATION

NUMBER

US ARMY CORPS

OF ENGINEERS

D A

T E

S U

B M

IT

T

E D

B Y

P L

O T

S C

A L

E

P L

O T

D A

T E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T

N O

NEW ENGLAND

DISTRICT

U

S

A R

M Y

E N

G

IN

E E

R D

IS

T

R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N C

O R

D M

A S

S A

C H

U S

E T

T S

S

IZ

E

A N

S I

D

W A

T E

R R

E S

O U

R C

E S

D E

V E

L O

P M

E N

T P

R O

J E

C T

R E

P L

A C

E G

A T

E H

O U

S E

R O

O F

IN

G

S Y

S T

E M

B

IR

C H

H

IL

L D

A M

R O

Y A

L S

T O

N M

A

D R

A W

IN

G

C O

D E

C O

N -B

H -4

SHEET OF 3

RRSGBS.pdf
BHRP101.pdf
BHDT102.pdf

File details come from the government source that posted it. Updated .