Amendment W912WJ23Q0108-0002.pdf
PDF 585 KB Posted
- Attached to
- Concrete Repairs, Everett Dam, Weare, NH
- Solicitation number
- W912WJ23Q0108
About this file
This is an amendment to a federal solicitation for concrete repairs at the Everett Dam in Weare, New Hampshire. The amendment revises the scope of work to include additional spalling repair at the spillway bridge as shown in informational photos 12, 14 and figure 7. It also provides an updated site visit attendee list and extends the response deadline from August 8, 2023 to September 11, 2023 at 5:00 PM Eastern time. The solicitation is being conducted by the U.S. Army Corps of Engineers Engineering District New England under number W912WJ23Q0108 for concrete repairs at the Everett Dam. Polymer modified cementitious patching compound is specified for repair materials and must be applied according to the manufacturer's written specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ23Q0108-0002_Attachments.pdf | ||
| Amendment W912WJ23Q0108-0001.pdf | ||
| Solicitation W912WJ23Q0108.pdf | ||
| Specifications and Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W13G86320150250001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to post the site visit attendee list.
Amendment w ill also revise the requirements to include additional spalling repair at the Spillw ay bridge. Refer to question/response #2 for additional information.
Closing w ill be extended until September 11, 2023 at 5:00 PM Eastern.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0108
X 9B. DATED (SEE ITEM 11)
16-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2023
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:
JENNIFER M SAMELA / ADDED BY UPASS
W912WJ23Q0108
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
REQUEST FOR INFORMATION
Site Visit Attendee List
Name Organization Tim Calabrese Edward Paige Corporation Kevin Reinhard Coastal Engineering, LLC Bob Lie US Army Corps of Engineers Steve Dermody US Army Corps of Engineers Brad Clark US Army Corps of Engineers Tim Blanc Blanc Building & Masonry LLC Henri Bundo Aulson Bill Murphy Trident Jennifer Samela US Army Corps of Engineers
Question 1: Would shotcrete be considered an acceptable alternative concrete repair method for this project?
Response 1: Specification Section 03 01 00 specified Polymer Modified Cementitious Patching Compound for repair materials. Application for this repair materials shall be as specified by the approved product written manufacturer’s specifications.
Question 2: Is the additional spalling located in proximity to the spillway bridge pier to be included in this work?
Response 2: This amendment will serve to revise the requirements to include additional spalling repair at the Spillway bridge. Informational photos and figures will be included with this amendment. Informational photos 12 and 14, and figure 7 delineate this work. All work shall conform to the specifications for concrete repair as originally required.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Sep-2023 05:00 PM to 11-Sep-2023 05:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .