This document package includes photos, figures, and repair details for concrete repairs needed at the Everett Lake Dam in Weare, New Hampshire. The scope of work involves repairing cracks, spalls, voids, and other defects in the concrete structures of the dam's weir boxes, intake tower, conduit transition ceiling, and access bridge pier. The repairs range from 2 to 6 inches deep and encompass approximately 126 square feet of material removal and replacement. Figures and details provide location information and specifications for repair methods. The related federal contract opportunity is solicitation number W912WJ23Q0108 from the Department of the Army Corps of Engineers Engineering District New England for completing the concrete repairs according to the scope of work.

View the file

Other files

File Type Posted
Amendment W912WJ23Q0108-0002.pdf PDF
Amendment W912WJ23Q0108-0001.pdf PDF
Solicitation W912WJ23Q0108.pdf PDF
Specifications and Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Everett Lake Dam Concrete Repairs

U.S. Army Corps of Engineers

Everett Lake Dam Flood Control Project

Weare, NH

Scope of Work Photos, Figures, and Details

July 2023

PHOTOS

Photo 1: Overview of Everett Lake Dam Showing Work and Staging Areas

Photo 2: Control Weir Box at Upstream Side of Everett Lake Dam Showing Approximate Repair Areas

Bottom of West Wall

Scour Gouge/Void

Bottom of Stop

Log Guide

Spall/Gouge

Bottom of North

Wall Slab Scour

Stop Logs, TYP for all

Weirs

Photo 3: Control Weir Box – Stop Log Guide Spall/Gouge

24” Tall x 6” Wide x 6” Average Depth +/‐

Approximately 1 SF

Stop Logs, TYP for all weirs

Photo 4: Control Weir Box – Slab Scour at Base of North Wall

4’ Wide x 6’ Long x 3” Average Depth +/‐

Approximately 24 SF

Photo 5: Control Weir Box – Bottom of West Wall Scour Gouge/Void

12” Tall x 24” Long x 3” Average Depth +/‐

Approximately 2 SF

Photo 6: Center Conduit Transition Ceiling Repair Location

4’ Wide x 6’‐6” Long x 2” Average Depth +/‐

Approximately 26 SF

Photo 7: Center Conduit Transition Ceiling Repair Area

Photo 8: Access to Weir Box from Trash Cleaning Platform

Note: Contractor must provide own fall protection measures into weir box as well as own ladders.

Ladder Needed for Access into

Weir Box

Photo 9: Intake Tower Repair Area

Service Bridge

Intake Tower (East

Side Repair Area)

Weir Box Access

Photo 10: Spall on East Side of Intake Tower

Note: Spall may wrap around opening corner.

2’ Wide x 2’ High x 2” Average Depth +/‐

Approximately 4 SF

Photo 11: Crack on East Side of Intake Tower

Approximate upper extent of crack

Approximate lower extent of crack

10‐20mils wide x 10’ Long +/‐

Photo 12: Access Spillway Bridge Pier Repair Location

Photo 13: Access Spillway Bridge Pier Repair Area

Approximately 55 SF +/‐ with an Average Repair Depth of 2”

Repair Area on

Bull Nose

Repair Area on

Spillway Surrounding

Bull Nose

Photo 13: Concrete Spillway Spall Repair

Note: 1. Spall area is located about 15’ SW of access road bridge pier.

2. Tap concrete surface within the repair area and identify unsound hollow sounding concrete. Square off repair area with limit at least 3” beyond hollow sounding area.

3. Remove unsound concrete and repair within the squared off limit. Removal and repair approach to be similar to “Repair to Conduit Transition Ceiling” as shown on Detail 3.

FIGURES

Figure 1: Partial Plan of Outlet Works Showing Weir Box and Intake Tower

Figure 2: Partial Elevation of Outlet Works Showing Wier Box and Intake Tower

FLOW

Figure 3: Plan of Weir Box Showing Repair Locations

Figure 4: Elevation of Weir Box Showing Repair Locations

Trash Cleaning

Platform

Low Water Level Allowed at this Level for Duration of 1 week

Figure 5: Plan of Center Conduit Transition Showing Ceiling Repair Area

Figure 6: Typical Intake Tower Elevation View Showing Repair Locations to Be Repaired on the East Elevation Only

EL. 449.00

Figure 7: Access Bridge Pier Elevation View Showing Repair Location

Spall + 24 SF

Figure 8: New Timber Stop Logs for Weir Box

Note: Stop log timber shall be Select Structural S4S Douglas Fir. Rip to achieve 6” high as noted.

REPAIR DETAILS

Detail 1a: Repair Details for Stop Log Guide Spall/Gouge - 1

Detail 1b: Repair Details for Stop Log Guide Spall/Gouge - 2

Detail 1c: Repair Details for Stop Log Guide Spall/Gouge - 3

Detail 2: Typical Concrete Repair for Weir Box Slab Scour, Weir Box West Wall Scour Gouge/Void, and Access Bridge Pier Repair

TYPICAL REPAIR PATCH BETWEEN 2 AND 6 INCHES DEEP

Detail 3: Repairs to Conduit Transition Ceiling

REPAIRS TO CONDUIT TRANSITION CEILING

Detail 4: Corner Spall Repair to Intake Tower