Amendment W912WJ23Q0106-0005.pdf

PDF 386 KB Posted

Attached to
Forest Inventory and Management Plan, West Hill Dam, Uxbridge, MA.
Solicitation number
W912WJ23Q0106
Issued by

About this file

This amendment modifies a solicitation for a forest inventory and management plan for 560 acres of land located across Uxbridge, Northbridge, and Upton, Massachusetts. The United States Army Corps of Engineers is seeking a Massachusetts licensed consulting forester to complete the work within 180 days of award. The amendment provides responses to vendor questions, extends the response deadline to August 2nd, 2023, and details security training requirements for all contract personnel. It also notes that maps and attachments are available online.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is being issued to provide responses to questions from industry. Closing has been extended to August 2, 2023 at 2:00 PM Eastern.

Quotes should be emailed to Jennifer M. Samela at jennifer.m.samela@usace.army.mil

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jul-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0106

X 9B. DATED (SEE ITEM 11)

29-Jun-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2023

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ23Q0106

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

REQUEST FOR INFORMATION

Question 1: Is a management plan needed for 560 acres total or for each area (Uxbridge, Northbridge, and Upton)?

Response 1: The management plan is for a total of 560 acres, which are located in Uxbridge, Northbridge, and Upton, MA.

Question 2: When is the work expected to be done before and is there a period of time assigned to this project (ex.

Number of weeks)?

Response 2: Work shall be completed within 180 days from the contract award.

Question 3: Do you have a survey plan for the land or the tax map references?

Response 3: The survey plan is included in the file “Attachments”, which will be posted to SAM.gov.

Question 4: Has the property been harvested recently?

Response 4: The last selective timber harvest at West Hill Dam was completed in 2015 on approximately 25 acres upstream of the dam and southwest of the wildlife management grassland area. There was also a small 3.5-acre harvest conducted on the downstream side of the dam the same year.

Question 5: Is there a survey of the property?

Response 5: No, there has never been a full forest survey conducted.

Question 6: Is there a documentation of the land being 560 acres?

Response 6: Maps are included in the file “Attachments”, which will be posted to SAM.gov.

Question 7: Will USACE provide geo-rectified aerial imagery for use by the contractor, or must the contractor procure independently?

Response 7: The Government will not provide geo-rectified aerial imagery. The Contractor will be required to supply/procure any required aerial imagery.

Question 8: The scope requires a Massachusetts registered consulting forester. Can that requirement be waived?

[Contractor] can obtain that service, but would need to include in a proposal. Note that Massachusetts requires that certification for forest harvest, but not for forest inventory; and that federal sovereign immunity does not require such, but I realize that DoD may follow State regulations more as a courtesy than as a requirement.

Response 8: Per the Performance Work Statement, the contractor shall be a Massachusetts Licensed Consulting Forester. Licensed Consulting Forester from any state within the confines of the United States.

Question 9: Is the training mentioned on pages 3 and 4 of the solicitation required for personnel not present on site?

Who is the applicable contract personnel?

Response 9: Per the solicitation, Security Requirements, General Security Requirements and Guidance: the security requirements (to include training) apply to all contract personnel supporting the performance requirements of the contract. That includes personnel on site, and any contractor personnel supporting any aspect of the contract, to include submittals, invoicing, and oversight for example.

Question 10: Is the DoD and Army security training (page 3) different than the Suspicious Activity Reporting training (on page 4)?

Response 10: The requirements can be met by completing the iWatch training attached to this amendment.

Question 11: Are there any training fees or is it free?

Response 11: There are no fees for completing the iWatch training.

Question 12: Where and who gives the training?

Response 12: The Technical Point of Contact can provide training to the awarded contractor to complete.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Jul-2023 02:00 PM to 02-Aug-2023 02:00 PM.

The following have been modified:

INSTRUCTIONS TO VENDORS

PLEASE DIRECT QUESTIONS TO NATHANIEL J. CORDOVA JENNIFER M. SAMELA AT (978) 318-8256

8324 OR NATHANIEL.J.CORDOVA@USACE.ARMY.MIL JENNIFER.M.SAMELA@USACE.ARMY.MIL.

THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL

CASES.

** QUOTES CAN BE E-MAILED TO NATHANIEL J. CORDOVA JENNIFER M. SAMELA AT

NATHANIEL.J.CORDOVA@USACE.ARMY.MIL JENNIFER.M.SAMELA@USACE.ARMY.MIL.

THE BID SCHEDULE MUST BE COMPLETED AND SUBMITTED FOR A QUOTE TO BE

CONSIDERED COMPLETE.

In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

Provide Unique Entity Identifier (UEI): ___________________________ Provide CAGE code: ____________________________ Provide TAX ID: __________________________ Per FAR Part 52.212-3 Alt I, the Contractor is required to complete the On-line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru (m) of this clause and return with quote.

POTENTIAL VENDORS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS

PRICE ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.