Amendment W912WJ23Q0031-0001.pdf

PDF 760 KB Posted

Attached to
Trash, Recycling, and Construction/Debris Dumpsters, Cape Cod Canal, Buzzards Bay, MA
Solicitation number
W912WJ23Q0031
Issued by

View the file

Other files

File Type Posted
Amendment W912WJ23Q0031-0003.pdf PDF
Amendment W912WJ23Q0031-0002.pdf PDF
Solicitation W912WJ23Q0031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to questions from industry. A revised Performance Work Statement is included.

Closing remains January 6, 2022 at 2:00 PM Eastern.

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0031

X 9B. DATED (SEE ITEM 11)

23-Dec-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Dec-2022

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ23Q0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

Question 1. Please clarify whether the dumpster for recycling at the Cape Cod Canal Field Office is a 10 CY dumpster or a 6 CY dumpster? The Bid Schedule says 10 CY, but Table 1.0 on p. 14 says 6 CY.

Response 1: The recycling container shall be a 10 CY container. The PWS is revised.

Question 2: Section A, 3 Contract Term: Will the Army consider changing a single option year to four option years? We suggest it is in the Army’s best interest to do so for the following reasons: 1) To maintain continuity of service, as most US Army contracts for solid waste and recycling are for 5 years (1 base year and 4 option years); 2) To provide a better price because the cost of dumpsters and roll-offs is expensive and it would be better to spread that cost over 5 years; and 3) To avoid unnecessary solicitations and the inevitable gaps requiring temporary agreements, as is currently the case.

Response 2: The schedule will remain as a base and one option year per the Performance Work Statement.

Question 3: Are any documents required to be submitted with the response in addition to the completed Bid Schedule and the Reps and Certs?

Response 3: The SF1449 with vendor signature on page 1, CAGE Code or UEI entered on page 3, and the completed Bid Schedule shall be provided when submitting a quote.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PERFORMANCE WORK STATEMENT

TRASH, SINGLE-STREAM RECYCLING,

CONSTRUCTION & DEMOLITION RECEPTACLES AND SERVICE

U.S. ARMY CORPS OF ENGINEERS

CAPE COD CANAL

BUZZARDS BAY, MA.

PERFORMANCE WORK STATEMENT

A. GENERAL

1. Performance Requirements – Furnish all equipment, materials, labor, and transportation necessary to provide and service trash and single-stream (mixed) recycling and construction and debris dumpsters along the Cape Cod Canal. Services are to be provided in accordance with the following scope of work and schedule. Work shall be performed to the satisfaction of the Technical Point of Contact.

2. Location – The Cape Cod Canal Project area is located in the towns of Sandwich and Bourne Massachusetts. The project office is located at 40 Academy Drive in Buzzards Bay, Massachusetts.

3. Contract Term – The contract period of performance is from contract award through 31 December 2023 with one option year at the government’s discretion. The option year period of performance will be 1 January 2024 through 31 December 2024. The Pre-Work Conference shall be completed within 14 days of contract award, and safety paperwork shall be submitted, reviewed, and accepted within 30 days of contract award.

4. Site Visit- Contact the Technical Point of Contact, Park Ranger, Andrew Fino at 978-318- 8565 or email at: Andrew.N.Fino@usace.army.mil to arrange a site visit.

5. Safety Requirements - All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA) federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

a. Abbreviated Accident Prevention Plan:

The Contractor shall prepare an Abbreviated Accident Prevention Plan (AAPP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable AAPP template is available upon request.

However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.

A preparatory meeting shall be conducted by the prime contractor to discuss the AAPPcontents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

b. Activity Hazard Analysis:

An Activity Hazard Analysis shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

Note: As part of the AAPP and AHAs, include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:

Procedures for periodic sanitation inspections.

Procedures for disinfecting project sites in accordance with Centers of Disease

Control and Prevention (CDC) guidelines.

Site specific measures to practice social distancing while working on the project.

Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.

A list of Personal Protective Equipment to be used in accordance with CDC and state guidelines.

c. Emergency Response:

Emergency procedures shall be documented in the Abbreviated Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.

d. Required Personnel:

The Contractor shall designate one employee as the site’s Competent Person who is responsible for ensuring a safe environment for all employees. The Competent Person shall be present at the project site and report to the contractor’s upper management. The Competent Person is required to have related construction and/or service experience.

When emergency medical services are not accessible within five (5) minutes of the work location and there are two (2) or more workers onsite, at least two (2) employees shall be trained in First Aid and CPR. Minimum qualifications are listed in EM 385-1- 1, Section 03.A.02.c.

e. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the Technical Point of Contact within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the Technical Point of Contact. ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within five (5) working days of the incident.

The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the Technical Point of Contact no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the Technical Point of Contact shall be electronically.

6. Pre-Work Conference - Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-Work Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor’s Safety Program (including sub-contractors).

iii. Abbreviated Accident Prevention Plan and Activity Hazard Analysis (Submitted & accepted prior to start of work on site)

iv. Safety Meetings (Documented on NED Form 251)

v. Accident Reporting (ENG Form 3394)

vi. Safety Data Sheet (SDS) requirements

vii. Contractor’s Equipment

viii. Correspondence, Communication, Security and Administrative Procedures.

Invoice and payment.

7. Schedule- Services will be performed from contract award until 31 December 2023 during the base year and 1 January 2024 until 31 December 2024 during the option year if the contract is renewed. Table 1.0 identifies the location letter, location and rental description, and the rental dates and frequency of service.

Table 1.0 Location

Letter Location and Rental Description Rental Dates and Frequency of Service

A Cape Cod Canal Field Office

– One (1) Trash Receptacle (10-yd)

– One (1) Recycle Receptacle (610-yd)

-Twice Weekly (January- December) -Twice Monthly (January- December)

B Cape Cod Canal Field Office -One (1) Construction & Demolition Receptacle (Metal Only) (15-yd)

-Haul as needed up to ten (10) times.

-One (1) Construction & Demolition Receptacle (General Debris) (30-yd)

-Haul as needed up to ten (10) times.

C Sandcatcher Recreation Area

– One (1) Trash Receptacle (10-yd)

– One (1) Recycle Receptacle (6-yd)

-Twice Weekly (April-October) -Twice Monthly (April-October)

D Sagamore Recreation Area

-Twice Weekly (April-October) -Twice Monthly (April –October)

E Bourne Recreation Area

-Twice Weekly (April – October) -Twice Monthly (April – October)

F Midway Recreation Area

– One (1) Trash Receptacle (6-yd)

-Twice Weekly (May – October) -Twice Monthly (May – October)

8. Permits – The Contractor will, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security – The contractor will comply with all established security policies at Cape Cod

Canal. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be notified as soon as practical of any such closure.

10. Hazardous Weather- The Contractor shall comply with established hazardous weather policies at the Cape Cod Canal. In the event of hazardous weather areas may be subject to periodic closures or evacuations. The Contractor will be notified as soon as possible in the event of closures due to hazardous weather conditions. All contractor property must be removed from Government property when an evacuation notice is given. It is also the contractor’s responsibility to find a safe and suitable evacuation site upon notice to evacuate.

11. Contractor Conduct – The work area is located on Federal property at a recreation area.

Contractor and employees must comply with CFR 36 Rules and Regulations. Contractor and employees must always act in a professional manner. Alcohol and firearms are prohibited on project grounds.

12. Payment – The contractor will furnish the Technical Point of Contact with one monthly invoice, stating the service performed and the amount to be paid. The invoice shall the contract number, invoice number, date of services, date of invoice and charges by contract item number. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

All invoices may be mailed to the Technical Point of Contact:

Park Ranger Andrew Fino U.S. Army Corps of Engineers Cape Cod Canal Field Office Buzzard Bay, MA 02532

Phone: 978.318.8565 Email: andrew.n.fino@usace.army.mil Fax: 508.759.1345

B. TECHNICAL

General Requirements

1. Summary- The contractor’s work and responsibility shall include, but not be limited to all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein. The contractor shall provide all labor, materials, equipment, and transportation necessary at the Cape Cod Canal to supply up to five (5) Trash receptacles, up to five (5) Recycle receptacles and two (2) Construction and Demolition Debris receptacles during the period of performance. Trash receptacles shall be emptied twice weekly and Recycle receptacles shall be emptied twice monthly. Construction and Demolition Debris receptacles shall be emptied up to ten (10) times as needed per period of performance. See Table 1.0 and Service Requirements for the specific requirements for each location.

2. Submittals - Although the Government technically reviews submissions required by this

Performance Work Statement, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government within 30 days of contract award. Submittals must be accepted by the Government before the commencement of any field activities.

a. Abbreviated Accident Prevention Plan

b. Activity Hazard Analysis

3. References - All work shall be in conformance with all appropriate federal, state, and local regulations.

4. Other Contracts – The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other

Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

5. Preferred Sequence for Work Schedules – The Technical Point of Contact shall provide the Contractor with a preferred sequence, or order, of work. (Note: The Contractor must provide sufficient personnel and equipment to accomplish services stated in the contract).

The Contractor will then be required to submit a work schedule for each service, and approximate times for beginning and ending of each required service listed. Any proposed change to an approved schedule must be submitted in writing, coordinated, and approved by the Technical Point of Contact in advance of actual schedule changes.

6. Damage to Government and Private Property – The contractor shall be responsible for restoring all Government facilities or structures damaged because of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person because of the contractor’s operation. The contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation. All trucks and/or trailers will be driven on existing roads only and not across or through any existing park facilities. The contractor may be required to restore any landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

7. Clean Up and Waste Disposal - The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area free from accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the Government. All disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of in trash/recycle dumpsters located onsite and in accordance with all federal, state, and local regulations.

8. Environmental Protection - The contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.

9. Personal Protective Equipment - It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

a. Required Protective Equipment-All personnel must use appropriate personal protective equipment (including, but not limited to; eye, hearing, hand, and foot protection) and wear an orange safety vest while performing services on Government Property.

10. Contractor’s Personnel:

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. At least one (1) contractor employee will be able to communicate with project staff effectively and efficiently.

b. Contact Information-The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

c. Employee Conduct - The Contractor shall be responsible for seeing that the firm’s employees strictly comply with all Federal, State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, US Army Corps of Engineers personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, US Army Corps of Engineers personnel, or other contractors.

iii. Unsafe operation of vehicles while on US Army Corps of Engineers property.

d. Removal of Contractor’s Employees - The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work.

Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

11. Quality Assurance - The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract

12. Inspections:

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - The Contractor or his representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-work conference) will be submitted to the Technical Point of Contact to allow verification of results for payment. A Government representative may accompany the contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections - The Technical Point of Contact may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

d. Government Inspections - The Government will monitor the Contractor’s service performance and make deductions accordingly.

13. Receiving and Storing Materials - Government employees will not receive or store any materials or supplies for the contractor.

14. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Service Requirements

The Contractor will furnish all labor and equipment necessary to provide to provide the services identified below:

1. General Service Requirements:

a. The contractor shall coordinate dumpster delivery and removal dates with the

Technical Point of Contact.

b. If any of the dumpsters are taller than four feet, it will have a side-loading feature.

c. The Contractor is responsible for repairing or replacing any containers that may become damaged.

d. All dumpsters provided will be lockable at all access openings using a government provided padlock.

e. The Contractor will provide all items necessary to perform these tasks and is solely responsible for these items and any damages that may incur to them.

f. The Contractor will deodorize or replace containers as necessary to prevent significant odors from accumulating.

g. Most of the dumpster locations are beyond a locked vehicle access gate. Keys to the vehicle access gates and the lockable dumpsters will be exchanged during the pre-work conference. Keys shall be returned to the Government prior to final payment on the contract, or at any time upon request by the Technical Point of Contact.

h. If the Contractor unlocks a gate for vehicle access, the Contractor shall ensure that the gate is relocked upon departure.

i. Contractor holidays or vacation times will not be a reason to suspend the regular pick-up or service schedule set out in this contract.

j. If the Contractor cannot meet a scheduled service for an unforeseen event, such as equipment breakdown, weather event, or other circumstance outside of the control of the Contractor, notification of a delayed service time and date will be made to the Technical Point of Contact by the Contractor.

2. Trash Removal Requirements: The Contractor will furnish all labor and equipment necessary to provide trash containment and removal service at the specified location and frequency. The servicing includes emptying and removal of all dumpster contents from US Army Corps of Engineers property. The Contractor shall also be responsible for the removal of waste that may have fallen out of the dumpster when servicing.

3. Single Stream Recycling Requirements: The Contractor will furnish all labor and equipment necessary to provide single stream recycling containment and removal service at the specified location and frequency. The servicing includes emptying of receptacles and removal of all recycled material from US Army Corps of Engineers property.

Materials shall be recycled according to all applicable federal and state standards, regulations, and policies. The Contractor shall also be responsible for the removal of recyclable material that may have fallen out of the dumpster when servicing.

4. Construction and Demolition Removal Requirements: The Contractor will furnish all labor and equipment necessary to provide containment and removal service at the specified location and frequency. The servicing includes emptying and removal of all dumpster contents from US Army Corps of Engineers property. The Contractor shall also be responsible for the removal of waste that may have fallen out of the dumpster when servicing.

Service Locations

A. Cape Cod Canal Field Office is located at 40 Academy Drive in Buzzards Bay MA.

B. Sandcatcher Recreation Area is located at 60 Ed Moffitt Drive in Sandwich, MA.

C. Sagamore Recreation Area is located at 40 Canal Street, adjacent to the Sagamore Bridge, in Sagamore Beach, MA D. Bourne Recreation Area is located at 173 Sandwich Road, adjacent to the Bourne Bridge in Bourne, MA E. Midway Recreation Area is located on Tech Drive/ 300 Sandwich Road, 1.5 miles east of the Bourne Bridge Rotary in Bourne, MA.

Service Description and Frequency

The following table identifies the location letter of each site, description of services and frequency/time period of services to be performed.

1. Location A. Cape Cod Canal Field Office:

a. Rentals and Services to be performed from contract award to 31 December 2023 during the base year period of performance and 1 January 2024 to 31 December 2024 during the option year period of performance if renewed.

b. One (1) 10-yard Trash Receptacle to be emptied twice weekly, on Monday and Thursday.

c. One (1) 610-yard Recycling Receptacle to be emptied twice monthly on the 2nd and 4th Wednesday of the month.

d. One (1) 30-yard Construction and Demolition Debris Receptacle for general debris to be emptied up to ten (10) times per period of performance.

e. One (1) 15-yard Construction and Demolition Debris Receptacle for metal only to be emptied up to ten (10) times per period of performance.

2. Location B. Sandcatcher Recreation Area

a. Rentals and Services to be performed from 10 April 2023 to 31 October 2023 during the base year period of performance and 08 April 2024 to 31 October 2024 during the option year of performance if renewed.

b. One (1) 10-yard Trash Receptacle to be emptied twice weekly on Monday and Thursday.

c. One (1) 6-yard Recycling Receptacle to be emptied twice monthly on the 2nd and 4th Wednesday of the month.

3. Location C. Sagamore Recreation Area during the base year period of performance and 08 April 2024 to 31 October 2024 during the option year of performance if renewed.

b. One (1) 10-yard Trash Receptacle to be emptied twice weekly on Monday and Thursday.

4. Location D. Bourne Recreation Area during the base year period of performance and 08 April 2024 to 31 October 2024 during the option year of performance if renewed.

b. One (1) 10-yard Trash Receptacle to be emptied twice weekly on Monday and Thursday.

5. Location E. Midway Recreation Area

a. Rentals and Services to be performed from 15 May 2023 to 31 October 2023 during the base year period of performance and 13 May 2024 to 31 October 2024 during the option year of performance if renewed.

b. One (1) 6-yard Trash Receptacle to be emptied twice weekly on Monday and Thursday.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .