Bid Abstract.pdf
PDF 205 KB Posted
- Solicitation number
- W912WJ23B0002
About this file
This document contains an abstract of offers for a construction project. The solicitation is for a generator replacement project at Surry Mountain Lake Dam in Surry, New Hampshire. The project includes installing a new generator and sub-base fuel tank outside near an existing service panel, providing a new underground feeder from the new generator to an existing generator terminal and double throw disconnect adjacent to an existing utility pole, providing a new service disconnecting means in the gatehouse where existing conductors enter the structure and extending power to a normal source of new lockable double-throw disconnect, and providing a new lighting panel and associated transformer within the gatehouse to replace an existing one. Three offers were received by the December 23, 2022 deadline from Midwest Electrical Construction, RothCo, and Alpha Contractors Group in the amounts of $208,579.10, $288,700.00, and $448,000.00 respectively. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District New England.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003_CON-SM-480_C-101-ANSI D.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Plans.pdf | ||
| Specs.pdf | ||
| W912WJ23B0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
11/21/2022 12/23/2022 1
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPED)
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. SIGNATURE DATE SIGNED
9. OFFERS
5. PROJECT TITLE (IFB) 8. GOVERNMENT ESTIMATE 1 2
(Check A, B, C and complete D, E, and F) A. OFFEROR A. OFFEROR
A. HIRED LABOR
X B. REASONABLE CONTRACT B. BID SECURTIY (TYPE AND AMOUNT) B. BID SECURTIY (TYPE AND AMOUNT)
100% Small Business Set-Aside (Without Profit)
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDEMENTS ACKNOWLEDGED C. AMENDEMENTS ACKNOWLEDGED
(Including Profit)
7A. ITEM
NUMBER 7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY D. UNIT E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT
0001 All Work 1 JA 208,579.10$ $208,579.10 $288,700.00 $288,700.00 $249,870.00 $249,870.00
1 JA $0.00 $0.00 $0.00
1 JA $0.00 $0.00 $0.00
1 JA $0.00 $0.00 $0.00
ESTIMATED TOTAL AMOUNT $208,579.10 $288,700.00 $249,870.00
W912WJ23B0002
Generator Replacement at Surry Mountain Dam in Surry, New Hampshire Midwest Electrical Construction
Benjamin G. Hoell Bid Opening OfficerUS ARMY ENGINEER DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD, MA 01742
3 3
20% Bid Bond 20% Bid Bond
RothCo
1. SOLICITATION NUMBER PAGE OF PAGES
ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
NO. 3 NO: 4 NO: 5 NO: 6
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED A. B. C.
ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 1 JA 448,000.00$ 448,000.00$
0002 1 JA $0.00 $0.00 $0.00
0003 1 JA $0.00 $0.00 $0.00
0004 1 JA $0.00 $0.00 $0.00
0005 1 JA $0.00 $0.00 $0.00
0006 1 JA -$ $0.00 $0.00 $0.00
0007 1 JA $0.00 $0.00 $0.00
0008 1 JA
ESTIMATED TOTAL AMOUNT $448,000.00 #REF! #REF! #REF!
W912WJ23B0002
Generator Replacement at Surry Mountain Dam in Surry, New Hampshire
Alpha Contractors Group
$90,000 Cashiers Check
| Abstract1 |
| Abstract2 |
| 2023-02-02T10:53:46-0500 | |
| HOELL.BENJAMIN.GEORGE.1271709133 |
File details come from the government source that posted it. Updated .