Amendment W912WJ22Q0088-00002.pdf

PDF 590 KB Posted

Attached to
Gatehouse Roof (EPDM), Guard Railings, and Hatch Replacement, Thomaston Dam, Thomaston, CT
Solicitation number
W912WJ22Q0088
Issued by

View the file

Other files

File Type Posted
Amendment W912WJ22Q0088-00003.pdf PDF
Amendment W912WJ22Q0088-00001.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF
Solicitation W912WJ22Q0088.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G86216708380001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to post responses to questions from industry.

Closing w ill be extended until July 22, 2022 at 5:00 PM Est.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22Q0088

X 9B. DATED (SEE ITEM 11)

22-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2022

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:

SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION

W912WJ22Q0088

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

Question 1: Would the Government be willing to consider removing the requirement for the installation of a second scupper and enlargement of the existing scupper, and instead consider a tapered roof insulation that allows the roof to drain to the existing scupper as is?

Answer 1: Work shall be completed in accordance with the drawings and specifications. The Government will require the addition of a second scupper and enlargement of the existing scupper as included in the drawings and specifications.

Question 2: Is the Contractor required to disconnect the lightning protection only, or remove and replace it?

Answer 2: The awarded Contractor will be required to remove and replace equipment and conductors on the roof. Down conductors shall remain and be reconnected to new equipment and conductors.

Question 3: Will the bridge support a lift? What are the ratings for the bridge?

Answer 3: The service bridge load rating is noted in Specifications section 01 11 00, 1.

9.1 Access to the Site, and is limited to 28.4 tons. Additionally, the spillway bridge load is limited to 65.2 tons.

Question 4: Is the roof currently leaking?

Answer 4: Yes, the leaks are visible from the generator level. There are signs of water infiltration at the generator ceiling perimeter.

Question 5: Is concrete repair included in the scope?

Answer 5: Concrete repair scope includes patching as described in Demolition Note 5, Detail H7/A-501, H13/A-501, and Keynote #3 on A-501. Existing conditions of concrete parapets and roof deck shall be reviewed as noted in Demolition Keynote A bullet #2, after the existing roof demolition is complete, including photographic documentation of existing conditions.

Question 6: For the chimney, is the Contractor required to repair the concrete or can the flashing extend over the chimney?

Answer 6: The chimney should tie into the roof system as noted with Keynote 8 on A-101 and detail A1/A-501.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Jul-2022 05:00 PM to 22-Jul-2022 05:00 PM.

(End of Summary of Changes)

W912WJ22Q0088

File details come from the government source that posted it. Updated .